Tagger microscope beam test results and readiness for construction what we learned from construction of the prototype and the parasitic beam tests in Hall.

Slides:



Advertisements
Similar presentations
The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
Advertisements

Collimation and tagging instrumentation for the GlueX photon beamline Richard Jones Igor Senderovich, Anne-Marie Carroll University of Connecticut APS/DNP.
Beam test of the microscope prototype and active collimator preliminary report on the parasitic beam tests in Hall B April 2011 Richard Jones, Igor Senderovich,
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Study of the MPPC Performance - contents - Introduction Fundamental properties microscopic laser scan –check variation within a sensor Summary and plans.
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Microscope Performance at elevated dark rates Richard Jones University of Connecticut collaboration GlueX collaboration meeting, Newport News, Feb. 2-4,
Tagger Microscope:  Performance Features Under Test Detector Alignment  Simulations show that when fiber axis is aligned to < 3 o of the e - trajectory.
James M c Intyre University of Connecticut GlueX Collaboration Meeting JLab, Feb. 2-4, 2011.
7 Oct 2011 Fall 2011 GlueX Collaboration Meeting Jefferson Lab Newport News, VA 1 Tagger Microscope (Top View) Tagger Magnet Photon Beam e - Beam.
Optics and magnetic field calculation for the Hall D Tagger Guangliang Yang Glasgow University.
Simulation of electron beam halo in the Hall D tagger Richard Jones University of Connecticut GlueX collaboration meeting, Newport News, March 29-31, 2007.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
Photon Tagging in the Hall D Beamline James McIntyre University of Connecticut 13 May GlueX Graduate Student Workshop Newport News, VA.
GlueX Luminosity Limits Richard Jones, University of Connecticut GlueX Collaboration Meeting, Newport News, May 8-10, Design luminosity 2.Physics.
Silicon Photomultiplier Readout Electronics for the GlueX Tagger Microscope Hall D Electronics Meeting, Newport News, Oct , 2007 Richard Jones, Igor.
GlueX CDC Update and Electronics Outlook Michael McCracken Carnegie Mellon University Advisor: Curtis Meyer Medium Energy Physics GlueX Electronics Meeting6-7.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
The Tagger Microscope Richard Jones, University of Connecticut Hall D Tagger - Photon Beamline ReviewJan , 2005, Newport News presented by GlueX.
Photon Source and Tagger Richard Jones, University of Connecticut GlueX Detector ReviewOctober 20-22, 2004, Newport News presented by GlueX Tagged Beam.
The UC Simulation of Picosecond Detectors Pico-Sec Timing Hardware Workshop November 18, 2005 Timothy Credo.
Tagging Near the End-Point Richard Jones, University of Connecticut GlueX Collaboration Meeting, Newport News, May 8-10, Current design capabilities.
Photon Beam and Tagger working group status report Richard Jones Catholic University Glasgow University University of Connecticut University of Connecticut.
23 July, 2003Curtis A. Meyer1 Milestones and Manpower Curtis A. Meyer.
GlueX CDC Update and Electronics Outlook GlueX/HallD Collaboration Meeting Jefferson Lab April 2006 Michael McCracken Carnegie Mellon University.
TAGGER MICROSCOPE ELECTRONICS CONSTRUCTION Readiness Review Feb. 7, 2013 Alex Barnes.
Characterization of Silicon Photomultipliers for beam loss monitors Lee Liverpool University weekly meeting.
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
Optics and magnetic field calculation for the Hall D Tagger Guangliang Yang Glasgow University.
AIDA design review Davide Braga Steve Thomas ASIC Design Group 9 June 2009.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
Evaluation of Silicon Photomultiplier Arrays for the GlueX Barrel Calorimeter Carl Zorn Radiation Detector & Medical Imaging Group Jefferson Laboratory,
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
Update on Silicon Photomultipliers Yi Qiang (Hall-D) Jefferson Lab S&T Review May 10, 2011.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
R.T. Jones, Newport News, May The GlueX Simulation Framework GEANT4 Tutorial Workshop Newport News, May 22-26, 2006 R.T. Jones, UConn Monte Carlo.
PrimEx collaboration meeting Energy calibration of the Hall B bremsstrahlung tagging system using magnetic pair spectrometer S. Stepanyan (JLAB)
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Development of Multi-Pixel Photon Counters(MPPC) Makoto Taguchi Kyoto University.
Hycal Energy Resolution, Timing, &Trigger Efficiency, A cumulative study. Chris Mauney.
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
1 SiPM studies: Highlighting current equipment and immediate plans Lee BLM Quasar working group.
Photon Source and Tagger Richard Jones, University of Connecticut GlueX Detector ReviewOctober 20-22, 2004, Newport News presented by GlueX Tagged Beam.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Upgrading plan of the tagger Current “new” tagger (SciFi) top view PL SFBSFF ……… 1mm-square fiber 6 fibers = 1ch 1mm-step position measurement 1mm ~ 30.
Working group on photon vetoes Meeting on June 7 th : 1.Status of Geant4 simulations 2.Discussion on LAV structure 3.Discussion on readout 4.News on Spaghetti.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
The requirements of Ideal pulse-type counter :  1 Every particle entering the detector should produce a pulse at the exit of the counter,
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
DAQ Speed and Run2 Estimates April 3, Summary of FADC Development for Faster Performance NameReadoutTrigger ScalersScaler S1 (helicity gated), S2.
M.Taguchi and T.Nobuhara(Kyoto) HPK MPPC(Multi Pixel Photon Counter) status T2K280m meeting.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
DCH FEE STATUS Level 1 Triggered Data Flow FEE Implementation &
An active target for MEG2, a status report
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
CTA-LST meeting February 2015
Collimation and tagging instrumentation
SHiP straw tracker prototype tests
Status of n-XYTER read-out chain at GSI
BESIII EMC electronics
The PrimEx-I Experiment
Tagger Microscope Detector & Electronics Status
First results with Hamamatsu SiPM, microscope preamp v2.0
Collaboration between Hall C and Hall D
Presentation transcript:

Tagger microscope beam test results and readiness for construction what we learned from construction of the prototype and the parasitic beam tests in Hall B April 2011 Richard Jones, James McIntyre, Alex Barnes, and Igor Senderovich Alex Somov, Hovanes Egiyan, Jefferson Lab GlueX collaboration meeting, Newport News, Oct. 6-8, 2011

2 Outline Goals Problems Microscope prototype results Revisions to the preamplifier Completed mechanical design Outlook for full detector construction

GlueX collaboration meeting, Newport News, Oct. 6-8, Goals Microscope Prototype Measure the light yield for a high energy electron moving along the axis of a fiber. Measure the TDC time resolution achievable using the UConn preamp, leading edge discriminator, F1TDC. Check the rate dependence (efficiency, time resolution) predicted by our simulation with real data.

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope prototype

GlueX collaboration meeting, Newport News, Oct. 6-8, Problems trigger counters unable to handle rate > 300 kHz unsure of precise alignment wrt bend plane discriminator rates in fibers too low by ~5 DAQ hangs – fixed by D. Abbott in day 5 ! ringing in tail of the SiPM pulses from preamp large cross-talk between channels on preamp discriminator thresholds were higher than ideal key electronics channels failed during later runs issues discovered during offline data analysis issues that arose during online data collection

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope prototype results A B C D E beam’s eye view dispersion direction fiber A1

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope prototype results A B C D E beam’s eye view dispersion direction fiber B1

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope prototype results A B C D E beam’s eye view dispersion direction fiber C1

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope prototype results A B C D E beam’s eye view dispersion direction fiber D1

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope prototype results A B C D E beam’s eye view dispersion direction fiber E1

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope prototype results A B C D E beam’s eye view dispersion direction fiber sum2

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope light yield estimate A B C D E beam’s eye view dispersion direction  gains were not very well matched (  20%)  separate estimates for individual, sum outputs individual outputs mean ph = 600 ch FADC gain = 0.27 mV/ch preamp gain = 0.90 mV/pe average = 360 pe/pulse summed outputs mean ph = 550 ch FADC gain = 0.27 mV/ch preamp gain = 0.85 mV/pe average = 350 pe/pulse consistent results systematic error 10%

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope pulse shape *

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope pulse shape *

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope pulse shape *

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope pulse shape *

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope time resolution discriminator threshold FADC pulse height FADC pulse height when TDC fires Why fiber count rates seemed too low wrt the trigger scint.

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope time resolution discriminator threshold FADC pulse height FADC pulse height when TDC fires In addition to threshold there is also a problem with efficiency

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope time resolution discriminator threshold is below the selection cut FADC pulse height FADC pulse height when TDC fires This channel looks better, but it failed and is missing for 80% of the run period.

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope time resolution discriminator threshold is here FADC pulse height FADC pulse height when TDC fires Efficiency looks dubious.

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope time resolution discriminator threshold is here FADC pulse height FADC pulse height when TDC fires Efficiency looks dubious. Clear threshold, use this one for timing tests. but

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope time resolution 1000 < FADC max < 1050

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope time resolution 1100 < FADC max < 1150

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope time resolution 1200 < FADC max < 1250

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope time resolution 1300 < FADC max < 1350

GlueX collaboration meeting, Newport News, Oct. 6-8, Microscope time resolution design goal (threshold 30%) single-channel 4

GlueX collaboration meeting, Newport News, Oct. 6-8, design goal (threshold 30%) single-channel 4 summed channel 12 Microscope time resolution

GlueX collaboration meeting, Newport News, Oct. 6-8, Preamplifier revisions  Detailed model of preamplifier 1.0 has been written in Matlab  Anomalous features of pulse shapes are reproduced by model. large cross-talk, slow tail for large pulses ringing in the tail of pulses large baseline shifts following each pulse circuit revisions tested in the model, shown to work  Layout completely redone from scratch template provided by Fernando ground flows between long signal traces better isolation between input and output stages reduced channel density impedance matching of outgoing signal traces

GlueX collaboration meeting, Newport News, Oct. 6-8, Preamplifier revisions New layout incorporating Hamamatsu SiPM has been entered into Altium. Another round of prototyping is underway, before final circuit is approved. Bench tests will be sufficient to approve the revised design for production.

GlueX collaboration meeting, Newport News, Oct. 6-8, Completed mechanical design Photon Beam Tagger Microscope (Top View) e - Beam Tagger Magnet

GlueX collaboration meeting, Newport News, Oct. 6-8, Completed mechanical design Back View

GlueX collaboration meeting, Newport News, Oct. 6-8, Completed mechanical design e - View Parallel Railing System SiFi Bundle Array

GlueX collaboration meeting, Newport News, Oct. 6-8, Outlook for microscope construction Major questions regarding performance have been addressed by results of beam test. All issues found in generation 1 electronics prototypes have been understood and addressed by engineering changes. including bench tests at maximum expected pulse rates, One more round of prototyping of electronics is needed, including bench tests at maximum expected pulse rates, before final production can begin. Mechanical design of microscope is essentially complete. All elements are now in place for executing a Construction MOU for the tagger microscope. All elements are now in place for executing a Construction MOU for the tagger microscope.