ILC e - and e + sources overview Jim Clarke STFC Daresbury Laboratory, UK On behalf of ILC Positron Sources Group.

Slides:



Advertisements
Similar presentations
30/10/09 Positron Workshop 1 Future Work Plan, Action Items, Future Meetings Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Ian Bailey University of Liverpool / Cockcroft Institute Target Design and Photon Collimator Overview EUROTeV: WP4 (polarised positron source) PTCD task.
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
20/03/2011 Global Design Effort 1 ALCPG11 – Eugene Positron Source N. Collomb J. Clarke, D. Angal-Kalinin,
Undulator R & D Jim Clarke STFC Daresbury Laboratory, UK BAW-2 SLAC Jan 2011.
Ian Bailey Cockcroft Institute/ Lancaster University October 30 th, 2009 Baseline Positron Source Target Experiment Update.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
Undulator Based ILC Positron Source Studies Wei Gai Argonne National Laboratory CCAST ILC Accelerator Workshop Beijing, Nov 5 – 7, 2007.
Proposed machine parameters Andrei Seryi July 23, 2010.
1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.
Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Dr Owen Taylor Institutes Science and Technology Facilities Council (STFC) UK –Daresbury.
Helical Undulator Based Positron Source for LC Wanming Liu 05/29/2013.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
Discussion for Keep Alive Source /Auxiliary Positron Source KURIKI Masao Hiroshima U. /KEK 10/25/2011 ILC Technical Baseline Review, 2011, DESY 1.
WG3a Sources Summary Jim Clarke on behalf of John Sheppard, Masao Kuriki, Philippe Piot and all the contributors to WG3a.
Key luminosity issues of the positron source Wei Gai.
Positron Source General Update M. Kuriki(Hiroshima U./KEK) ALCW2015, April 2015,Tsukuba/Tokyo, Japan.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
EUROTeV WP4 Report Polarised Positron Source Jim Clarke, on behalf of the WP4 team DESY Zeuthen STFC (Daresbury and RAL) University of Durham University.
Current standing of the undulator based ILC positron source Wei Gai AWLC 14 FNAL, May
Development of a Positron Production Target for the ILC Positron Source Capture Optics Positron beam pipe/ NC rf cavity Target wheel Vacuum feedthrough.
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
15 th October CLIC workshop The CLIC/ILC common issues for the sources Jim Clarke and Louis Rinolfi.
Ian Bailey University of Liverpool / Cockcroft Institute UK Target Update EUROTeV: WP4 (polarised positron source) PTCD task I. Bailey, J. Dainton, L.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Global Design Effort 1 Sources Parallel Session Summary Jim Clarke STFC Daresbury Laboratory.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Meeting 1: Oxford ILC GDE Activities Update and Undulator Scheme Status.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Welcome and Introduction to the Workshop Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 – 31.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
Discussion, Action Items, & Future Work Plan Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 –
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
10/9/2007 Global Design Effort 1 Optical Matching Device Jeff Gronberg / LLNL October 9, 2007 Positron source KOM - Daresbury This work performed under.
ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October
Ian Bailey Cockcroft Institute/ Lancaster University IWLC October 21 st, 2010 Overview of Undulator-Based Sources for LC.
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
Task 6: Short Period Nb3Sn Superconducting Helical Undulator George Ellwood
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
POSIPOL Berlin ILC/CLIC e + generation working group Wei Gai, ANL Louis Rinolfi, CERN Thanks to Omori-san for the coordination of the Webex meetings.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
Positron Source Update Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC 08, University of Illinois at Chicago, 17 th November 2008.
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
29/10/09 Positron Workshop 1 Working Assumptions for Low Energy Operations Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Review Layout of E- Linac Side of Central Region for Feb 10,2011 Meeting For E+ use Norbert’s data from CF&S meeting 12 th July, 2010, which has coordinates.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
Ian Bailey Cockcroft Institute/ Lancaster University September 30 th, 2009 Baseline Positron Source Target Experiment Update LCWA09.
Oct. 6, ILC Positron Source Group Meeting Short report by S. Riemann September 2006, RAL.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
Progress with Zeuthen Meeting Actions Jim Clarke ASTeC, STFC Daresbury Laboratory.
Positron Source Report Jim Clarke STFC Daresbury Laboratory/Cockcroft Institute.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Pair-Production Target
ILC - Upgrades Nick Walker – 100th meeting
Task 6: Short Period Nb3Sn Superconducting Helical Undulator
CLIC Undulator Option for Polarised Positrons
ILC/CLIC e+ generation working group
Future Work Plan and Action Items
Cost Comparison of Undulator and e-Driven Systems
ILC RDR baseline schematic (2007 IHEP meeting)
Electron Source Configuration
Summary for the Sources working group
Presentation transcript:

ILC e - and e + sources overview Jim Clarke STFC Daresbury Laboratory, UK On behalf of ILC Positron Sources Group

ILC Electron Source Extract from R&D Plan (Aug 2010) –Primary on-going R&D for the electron source is the construction and demonstration of a prototype polarised electron source to ILC specifications. In particular, such a facility would enable polarised cathode charge limit investigations in this regime to be quantified. R&D Milestones: –mid 2010 Procurement of a coherent V18 laser –end 2010 Inverted DC gun prototype 2 at 120kV –end 2011 Inverted DC gun prototype 3 at 200kV –end 2011 Final laser demonstration –end 2011 ILC beam demonstration (time structure) using 100kV SLAC SLC gun and cathodes –mid 2012 Installation of final ILC test facility (gun and laser) at JLab –end 2012 Final beam tests See detailed talk by John Sheppard

ILC Positron Source Extract from R&D Plan (Aug 2010) –The positron source R&D programme can be separated into two categories: –R&D on critical components for the baseline source (undulator- driven). –R&D on alternative source technology (or for the auxiliary source). Alternative / Auxiliary source R&D –end 2011 Boron-nitride window beam tests at KEK –end 2011 Liquid lead target beam tests at KEK

ILC Positron Source Baseline R&D (Undulator-driven source) –end 2010 Completion of rotating target magnetic eddy-current tests –end 2010 Conceptual design study (feasibility) for magnetic flux concentrator –end 2010 Conceptual design study (feasibility) for liquid lithium lens –end 2010 Source parameters based on possible Nb 3 Sn undulator design –mid 2011 Demonstration of target rotating vacuum seal using ‘surrogate target’ –mid 2011 Horizontal cold-tests of 4m undulator prototype –mid 2011 Conceptual design study (feasibility) for magnetic flux concentrator –end 2011 Analyse (simulation) of target shock-wave survivability –end 2011 Target radiation damage estimates (lifetime modelling) –end 2011 Radiation tests of ferrofluid (rotating seal) –end 2012 Prototype module of Flux Concentrator (funding permitting) –end 2013 Feasibility of Nb 3 Sn undulator

ILC Positron Source Integration Model now well developed in CAD Accurately reflects lattice decks but there are no decks in some parts so have had to make assumptions about layout All of the relevant beamlines are included in the model, not just the positron source ones The tunnels accurately reflect the current ILC design

Undulator & Fast Abort Dump Norbert Collomb, STFC

Photon Line, BDS Dog-leg, Auxiliary Source Norbert Collomb, STFC

Photon Target, BDS, Auxiliary Source Diagnostic Line Norbert Collomb, STFC

Pre-Accelerator, BDS, Photon Dump Norbert Collomb, STFC

5GeV Booster, BDS, BDS Diagnostic Line and Dump Norbert Collomb, STFC

e + to DR, e - RTML, BDS, e + line to main dump Norbert Collomb, STFC

e + to DR, e - RTML, DR Norbert Collomb, STFC

Overall IP Region Layout Norbert Collomb, STFC

Undulator 2 x 1.75m undulators successfully tested vertically at RAL Specification of 0.86T exceeded –1.15T quench limit 4m cryomodule assembled but heat load was too high –prevented powering of magnets

15 7th Positron Source Collaboration Meeting, DESY July 2010 – Top plate cooled by cryocooler It was seen that it did not take much heat input to change temperature of top plate and HTS/LTS join. Large copper bars have been inserted to cool top plate and HTS/LTS join directly from the 2 nd stage of the cryocooler. Undulator Cryomodule Owen Taylor, STFC

Undulator Cryomodule Both undulators now powered individually and together at 215 A (0.86T) – stable for 2 hours Both also powered at 252A for > 1hour but then lead quenched above top plate –Not enough margin on top plate temperature at high current? –No magnet quenches so far Steve Carr, STFC

17 Application of Nb 3 Sn To generate higher fields or to be able to reduce the period we need to use Nb 3 Sn Goal would be to reduce period to ~9 mm Concerns –Packing factor reduced as insulation is thicker –Performance of wire at <5T –Insulation of former –Can no longer wind with ribbon –More difficult material to work with (heat treatment) Need Nb 3 Sn wire to have small diameter for similar filling factor Have purchased 1 km of Ø0.5 mm (Ø0.63 mm with glass braid) wire from OST. Owen Taylor, STFC

18 Trial Winding Started Owen Taylor, STFC

Target Ian Bailey, Lancaster Uni

Target Prototype –Data-taking began Nov 08 and is mostly complete. –All measurements taken for speeds <1800rpm –Higher speeds vibration and noise (in air) –Extrapolating to 2000rpm shows that wheel will be able to operate in immersed fields ~1T without problems. –Detailed studies of torque Fourier spectra, etc ongoing Eddy current models –CARMEN consistent with earlier (rim only) ELECTRA model –CARMEN in agreement with new LLNL simulation at 10% level –Prediction of large effect from spokes not seen in data! –Carrying out conductivity material tests at Lancaster and further magnetic field measurements at DL to try to resolve this Ian Bailey, Lancaster Uni

Flux Concentrator Design work ongoing at LLNL See detailed talk by Tom Piggott

Positron Yield Wei Gai, ANL

Switched Mode Option for Low Energy Running (10Hz Operation) To IP Undulator BDS High Power Dump 150 GeV Electron Transport to Dump (Switched Mode) Switching Magnet (5 Hz) See talk by Andrei Seryi on Tuesday for latest parameters

Use Different Undulator Parameters Assumptions –231 m long undulator –100 GeV drive beam energy –Flux Concentrator Wei Gai, ANL Potential alternative to 10Hz running?

Baseline Assessment Workshop # 2 Proposal (SLAC) January : Reduced RF, focusing on parameters, running scenarios and development plans January 19: Reduced RF focusing on cost and performance projections and potential upgrade paths and summary/recommendation, January 20: Positron Source Location, focusing on running scenarios and technical issues January 21: Positron Source Location, focusing on cost and performance projections and summary/recommendation. Marc Ross, FNAL

Discussion expected at SLAC - BAW 1. Reduced RF Global Parameters Pulse length, n_b, power and cryogenic consumption AS impact – sources, damping rings and BDS Upgrade paths R & D strategies Cost impact – key cost items Performance impact – luminosity performance and impact on physics 2. Positron Source Location Running Scenarios – key aspects and luminosity as a function of energy Technical parameters – operational issues as a function of energy Variable repetition rate issues – power and cryogenic consumption; sources and damping ring performance Cost impact – key cost items Performance impact – luminosity performance and impact on physics Marc Ross, FNAL

Summary SB2009 concept of undulator at end of linac now fully integrated R&D progress continues on key areas – Undulator – Target – Flux Concentrator Operation at energies <150 GeV affects positron yield – Options exist to restore the yield BAW2 in Jan 2011 will discuss this in detail and make recommendations