1 Time Study and Work Measurement Chapters: 12.Introduction to Work Measurement 13.Direct Time Study 14.Predetermined Motion Time Systems 15.Standard Data.

Slides:



Advertisements
Similar presentations
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J S10-1 Operations.
Advertisements

Chapter 3 Time Study.
CmpE 104 SOFTWARE STATISTICAL TOOLS & METHODS MEASURING & ESTIMATING SOFTWARE SIZE AND RESOURCE & SCHEDULE ESTIMATING.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Design of Work Systems.
Direct Time Study Sections: Direct Time Study Procedure
Time Study Procedure - Overview
QUALITY ASSURANCE Work Load. Workload is the sum of the work achieved or to be achieved, obtained by multiplying the raw count of each individual procedure.
Chapter 8 Estimation: Additional Topics
2000 by Prentice-Hall, Inc1 Chapter 17 - Human Resources in Strategic Planning  TQM recognizes importance of employees  Education & training viewed as.
INSY 3021 Time Study Auburn University Spring 2005.
The Islamic University of Gaza Faculty of Engineering Civil Engineering Department Numerical Analysis ECIV 3306 Chapter 3 Approximations and Errors.
Maintenance Work Measurement
Chap 9-1 Statistics for Business and Economics, 6e © 2007 Pearson Education, Inc. Chapter 9 Estimation: Additional Topics Statistics for Business and Economics.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Design of Work Systems.
Work Design and Measurement
Direct Time Study Chapter 13 Sections: Direct Time Study Procedure
1 Seventh Lecture Error Analysis Instrumentation and Product Testing.
IE 101-Industrial Engineering Orientation
Productivity One of the most important responsibilities of an operations manager is to achieve productive use of organization’s resources. Productivity.
Work Measurement Time is important in work systems because of its economic significance. Most workers are paid for the time they are on the job. For any.
DIRECT TIME STUDY Dr. Ahmed Elyamany.
1/49 EF 507 QUANTITATIVE METHODS FOR ECONOMICS AND FINANCE FALL 2008 Chapter 9 Estimation: Additional Topics.
Standard Costs and Balanced Scorecard
Chapter 11 Work System Design.
1 Work Sampling Can provide information about men and machines in less time and lower cost. It has three main uses: 1.Activity and delay sampling To measure.
Work Design and Measurement Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 8 Supplement Roberta.
7 Design of Work Systems.
Operations and Supply Chain Management, 8th Edition
PROBABILITY (6MTCOAE205) Chapter 6 Estimation. Confidence Intervals Contents of this chapter: Confidence Intervals for the Population Mean, μ when Population.
Lecture 12 Statistical Inference (Estimation) Point and Interval estimation By Aziza Munir.
4. Time Study The major objective of this chapter is to learn how to calculate a time standard based on stopwatch time study procedures.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Work Design and Measurement McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Work Design and Measurement McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
- For 6 th Semester Job Design, Production and Operations Standards, and Work Measurement.
UNIT 2 WORK STUDY, INCENTIVES AND SAFETY. Work study It is the systematic examination of the methods of carrying on activities so as to improve the effective.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Company LOGO Work Measurements Lab # 5. Outline 1. Work Study 2. Method Study 3. Work Measurement 4. Time Study 3. Standard Time June 4, 20162Lab # 5:
Chapter Outline 2.1 Estimation Confidence Interval Estimates for Population Mean Confidence Interval Estimates for the Difference Between Two Population.
Job Design Job design involves specifying the content and methods of job What will be done Who will do the job How the job will be done Where the job.
1 Procedure for the determination of time required to perform a task involving either human or machine under certain standard conditions of measurement.
Confidence Interval Estimation For statistical inference in decision making:
Chapter 7 Estimates, Confidence Intervals, and Sample Sizes
Work Measurement Vital inputs for: Standard Time
ENG M 501 Production and Operations Management Chapter 6A Job Design and Work Measurement Lecture 04a: 27 January 2009 John Doucette Dept. of Mechanical.
Company LOGO Work Measurements Lab # 5. Outline 1. Work Study 2. Method Study 3. Work Measurement 4. Time Study 3. Standard Time February 17, 20162Lab.
Measurements and Their Analysis. Introduction Note that in this chapter, we are talking about multiple measurements of the same quantity Numerical analysis.
Chapter 7: The Distribution of Sample Means
1 ISE Chapter 24: Determining Time/Job Uses for time/unit information  Cost allocation  Production and inventory control  Evaluation of alternatives.
Production Planning and control – ME 1009 Unit 1 Introduction.
Predetermined Time Systems
IE 366 Chapter 24 Time/Job. IE 366 Work Measurement ● Goal: determine standard time for a task. ● Techniques – Direct Time Study – Predetermined Time.
7 Design of Work Systems.
Chapter 3: Cost Estimation Techniques
Work Sampling Sections: How Work Sampling Works – part 1
7 Design of Work Systems.
Operations Management Work Measurement Supplement 10
Work Systems and How They Work
Chapter 25 Time Study Supplementary Material from:
Predetermined Time Systems
JOB DESIGN Work Measurement.
Predetermined Motion Time Systems
Chapter 3: Cost Estimation Techniques
Introduction to Work Measurement
Time Studies Involves timing a sample of a worker’s performance and using it to set a standard Requires trained and experienced observers Cannot be set.
(Lecturer in Mech. Deptt.)
Work Measurements Lab # 5.
Production and Operations Management
Chapter 3: Cost Estimation Techniques
Presentation transcript:

1 Time Study and Work Measurement Chapters: 12.Introduction to Work Measurement 13.Direct Time Study 14.Predetermined Motion Time Systems 15.Standard Data Systems 16.Work Sampling 17.Computerized Work Measurement and Standard Maintenance 18.Economic Justification and Applications of Time Standards 19.Learning Curves Part III

2 Introduction to Work Measurement Sections: 1.Time Standards and How They Are Determined 2.Prerequisites for Valid Time Standards 3.Allowances in Time Standards 4.Accuracy, Precision, and Speed of Application in Work Measurement Chapter 12

3 Time Is Important  Most workers are paid for their time on the job  The labor content (cost of labor time) is often a major factor in the total cost of a product or service  For any organization, it is important to know how much time will be required to accomplish a given amount of work

4 Some Definitions  Work measurement – evaluation of a task in terms of the time that should be allowed by an average worker to perform the task o 4 techniques o Focus on human work

5 Some Definitions  Standard time (allowed time) – amount of time that should be allowed for an average worker to process one work unit using the standard method and working at normal pace o Includes allowance

6 Some Definitions  Time study – all the ways in which time is analyzed in work situations  How much time it should take to accomplish a given task  Both terms (work measurement and time study) can be used interchangeably

7 When Are Time Standards Beneficial? Characteristics of industrial situations in which time standards would be beneficial 1.Low productivity: significant opportunities for improvement 2.Repeat orders: once the time standard is set for the first, it can be used for successive ones 3.Long production runs: reduced average cost of work measurement 4.Repetitive work cycles: work measurement can be justified more readily 5.Short cycle times: requires less time to set standards

8 Functions of Time Standards  They define a “fair day’s work”  They provide a means to convert workload into staffing and equipment needs  They allow alternative methods to be compared objectively  They provide a basis for wage incentives and evaluation of worker performance  They provide time data for: o Production planning and scheduling o Cost estimating o Material requirements planning

9 Methods to Determine Time Standards  Vary in terms of  accuracy and reliability of the values derived from the method  amount of time required to apply the corresponding method

10 Methods to Determine Time Standards  Estimation  Judgment of a person who is familiar with the job  Subjective  Least accurate method  Historical records  Records on the actual times and production quantities for previous identical or similar job orders - “Time card”s  Average time per part  Improvement over estimates  Limitation: No indication of efficiency measures  Work measurement techniques  Time consuming  More accurate than estimation and historical records

11 Work Measurement Techniques 1.Direct time study (DTS) 2.Predetermined motion time system (PMTS) 3.Standard data systems (SDS) 4.Work sampling

12 Task Hierarchy & Work Measurement Pyramidal Structure of Work Work measurement techniques measure work at different levels of this hierarchy

13 1. Direct Time Study  Direct observation of a task using a stopwatch to record the time taken to accomplish a task.  The task is usually divided into work elements and each work element is timed seperately.  During the observation, the analyst evaluates the worker’s pace - performance rating  Normal time T n =T obs (PR) where T n = normal time, min; T obs = observed time, min; PR = performance rating of the worker’s pace  Standard time T std =T n (1+A pfd )

14 2. Predetermined Motion Time Systems  A database of normal times of basic motion elements (therbligs) such as reach, grasp, move etc.  Conditions under which the motion elements (work variables) are performed are important.  Example: normal time for TL  Distance moved  Weight of the object being moved  The analyst list all of the basic motion elements that comprise the task; then normal times for basic motion elements are summed up to obtain the normal time for the task  Advantages:  No need for performance rating  Can be applied before production starts

15 3. Standard Data Systems  A compilation of normal time values for work elements used in the tasks performed in facility  Used to establish time standards for tasks composed of work elements similar to those in the database  Source of data: direct time study, PMTS, work sampling, historical data  Effect of work variables should be included  Tables  Charts  Mathematical equations

16 4. Work Sampling  A random sampling technique to estimate the proportions of time spent in different activities  Identify activities clearly.  Example: machine setup, production, idleness  Multiple subjects (entities) can be included  Observations  Random: minimize bias  Large in number: to achieve statistical accuracy  Objectives:  Setting time standards  Estimating resource utilization  Determining an allowance factors

17 5. Computerized Work Measurement  Facilitates collection of data  Performs routine computations  Organizes time standards files and databases  Retrieves data in predetermined motion time systems and standard data systems  Assists in the preparation of the documentation  Methods descriptions  Reports

Prerequisites for Valid Time Standards Time to perform a task depends on worker (gender, strength etc.), worker’s pace, method used, work unit Factors that must be standardized before a time standard can be set (except for the worker)

19 Average Worker  A worker who  is representative of the persons who usually perform tasks similar to the task being measured.  if the work is performed mostly by men (women), then the average worker is male (female)  have learned the task, practiced and proficient at it  is capable of performing the task consistently throughout the shift

20 Standard (Normal) Performance  A pace of working that can be maintained by an average worker throughout an entire work shift without harmful effects on the worker’s health or physical well-being  Benchmarks of standard performance:  Walking at 3 miles/hr on level flat ground  Dealing four hands of cards from a 52 card deck in exactly 30 sec

21 Normal time / Standard time  Normal time: Time it takes to perform a task under the normal (standard) (100%) performance  Normal time does not include allowances for time losses  Standard time: Normal time + allowance Normal time (1 + A pfd )

22 Distribution of Worker Performance Worker performance is expressed in terms of daily output Variations among workers →performance variations

23 More on Standard Performance  Standard performance is commonly defined to be a pace that can be readily attained by the majority of workers  Companies want most workers to be able to achieve the standard performance easily.  A typical policy is to define standard performance so that an average worker is able to work at a pace that is 130% of that pace o Thus, most workers are able to easily achieve standard performance

24 How a Standard Time is Defined Distribution of worker performance, indicating how standard time is defined so that it can be readily achieved by most workers 8 * 60 / / 1.3

25 Standard Method  Determining the optimum method for processing a work unit  “One best method”: the safest, quickest, most productive, and least stressful to the worker  Must include all of the details on how the task is performed, including: o Procedure - hand and body motions o Tools o Equipment o Workplace layout (what are the locations of the parts, tools) o Irregular work o Working conditions (is the work performed outside or inside) o Setup

26 Standard Work Units  The time needed to process the work unit depends on its starting condition o Therefore this condition must be specified by engineering documents o If the actual condition deviates from the specification, then extra time may be required to accomplish the task  Exactly what changes are made in the work unit by the task?  What is the final state of the completed work unit?

Allowances in Time Standards  Normal time is adjusted by an allowance factor A pfd to obtain the standard time  Purpose of allowance factor is to compensate for lost time due to work interruptions and other reasons  Standard time: T std = T n (1 + A pfd ) where pfd = personal time, fatigue, and delays

28 Reasons for Lost Time at Work Work-related interruptions  Machine breakdowns  Waiting for materials or parts  Receiving instructions from foreman  Talking to co-workers about work-related matters  Rest breaks for fatigue  Cleaning up at end of shift Non-work-related interruptions  Personal needs (e.g., restroom breaks)  Talking to co-workers about matters unrelated to work  Lunch break (not included in A pfd )  Smoke break  Beverage break إستراحة شرابِ  Personal telephone call

29 How to Allow for Lost Time  Two approaches used by companies: 1.Scheduled rest breaks during the shift o Typical - one 15-minute break in mid- morning and another in mid-afternoon 2.A PFD allowance is added to the normal time o This allows the worker to take a break on his/her own time

30 PFD Allowance  Personal time  Rest room breaks, phone calls, water fountain stops, cigarette breaks (5% typical)  For example: A larger value will be approporiate if the work environment is hot  Fatigue  Rest allowance to overcome fatigue due to work-related stresses and conditions (5% or more)  For example: If the work is physiologically very demanding, then relaxation time should be allowed periodically for the body to recover (in this case use 20% allowance)  Delays  Random, unavoidable interruptions  Machine breakdowns, foreman instructions (5% typical)  Usually management is responsible for these delays.  Sudden urge for a cigarette break? Is it personal or delay?

31 Other Types of Allowances  There are other reasons for adding allowances, which are not as common as PFD allowances. They are applied in addition to A pfd  Contingency طوارئِ allowance  Additional allowance due to a problem with the task (e.g., raw material problem ) - not greater than 5%  Temporary basis – after solving the underlying problem, it will disappear  Policy allowance: They are based on company policy  Machine allowance (set by company policy as a part of the wage incentive s.)  Training allowance – for teaching new workers  Learning allowance – learning a new task

32 Contingency Allowances

33 Policy Allowances  To cover special work situations that are usually associated with a wage incentive system.  Example: Machine allowance – provides an opportunity of the worker to maintain a high rate of earnings even though (s)he has control over only a portion of the cycle. T std = T nw (1 + A pfd ) + T m (1 + A m )

34 Example: Use of machine allowance in a wage incentive plan Given: A wage incentive plan pays workers a daily wage at a rate of $15/hr multiplied by the number of standard hours accomplished during the shift. T nw =1 min, T m =3 min, A pfd =15%. Workers’ work elements are external. Determine the standard time for a)A m =0, b)A m =30%. c)What does a worker earn for the day under each A m (policy!) if (s)he produces 115 parts a day?

35 Example Solution a)T std = 1 (1 +.15) + 3 (1 + 0)=4.15 min b)T std = 1 (1 +.15) + 3 ( )=5.05 min c) H std under a)H std =115(4.15)/60=7.95 hr b)H std =115(5.05)/60=9.68 hr The worker is paid under a)15(7.95)=$ b)15(119.25)=$145.19

36 Other types of policy allowances  Training allowances: for workers whose responsibilities include teaching other workers  Learning allowances: for workers who are learning a new job, or new employees  Worker would be reluctant to train others or to learn new jobs unless some form of compensation were provided to cover the losses because of training.  If a wage incentive plan is not used, there is no reason to have policy allowances.

Measurement  A procedure in which an unknown quantity is compared to a known standard, using an accepted and consistent system of units  Important attributes of a measurement system:  Accuracy  Precision  Speed of response  Work measurement is a measurement process

38 Measurement  Measurement is a procedure in which an unknown quantity is compared to a known standard, using an accepted and consistent system of units.  The measurement provides a numerical value of the quantity of interest, within certain limits of accuracy and precision.  All measurement systems are based on seven basic physical quantities: (1) length, (2) mass, (3) time, (4) electrical current, (5) temperature, (6) luminous intensity, and (7) matter.  All other physical quantities (e.g., area, volume, velocity, force, electrical voltage) are derived from these seven basic quantities.  Time is one of the seven basic physical quantities, and time is the common quantity of interest in the measurement of work.  The standard unit for time is the second. Although time standards in work measurement often use alternative units (e.g., minutes, hours), they all can be related back to seconds.

39 Accuracy and Precision  Accuracy  Degree to which the measured value agrees with the true value of the quality of interest  Freedom from systematic errors, which are positive or negative deviations from the true value that are consistent from measurement to measurement  Precision  Repeatability of the measurement system  High precision means random errors are small, where errors are assumed to follow a normal distribution  Plus or minus three standard deviations often used as a benchmark: [  ]

40 Measurement Accuracy vs. Precision High accuracy Low precision Low accuracy High precision High accuracy High precision

41 Measurement Accuracy vs. Precision Accuracy indicates proximity of measurement results to the true value, precision to the repeatability or reproducibility of the measurement High accuracy, but low precision High precision, but low accuracy

42 Accuracy in Work Measurement  Accuracy is concerned with closeness to the true value  But what is the true value of a task time?  Measurement is a procedure in which an unknown quantity is compared with a known standard  But the known standard in work measurement is the definition of standard performance used by the company  The standard is not based on time

43 Precision in Work Measurement  Precision is concerned with the expected variability within a single time study  Precision of a time standard is determined at a certain reliability or confidence level  For example, the standard time for a task is 4.00 min, and we are 95% confident that the actual time is within 5% of that time  95 out of 100 time studies performed on the task, the resulting standard time values lie between 3.80 min and 4.20 min  Related term: Consistency – concerned with variations in standard time values among different time study analysts

44 Relative Accuracy of Time Standards

45 Engineered Standards  Time standards that are based on measured time values that have been adjusted for worker performance  Some effort has been made to determine best method to accomplish the task

46 Application Speed Ratio  Speed of response – the lag فارق الزمن between the time when the measuring device is applied and when the measured value is available to the user  how much time is required to determine the time standard for a given task  Varies for different work measurement techniques  In work measurement speed of response is application speed ratio.  Application speed ratio = ratio of the time required to set the standard divided by the value of the time standard itself  Typical values = 100 to 250  Application speed ratio=100: It takes 100 min of analyst time to determine a 1 min-time standard.

47 Relative Application Speed

48 PROBLEM # 1 The average observed time for a repetitive work cycle in a direct time study was 3.27 min. The worker’s performance was rated by the analyst at 90%. The company uses a PFD allowance factor of 13%. What is the standard time for this task? Solution # 1 Normal time T n = 3.27(0.90) = min Standard time T std = 2.943( ) = min

49 PROBLEM # 2 The ABC Company uses a standard data system to set time standards. One of the time study analysts listed the three work elements for a new task to be performed in the shop and then determined the normal time values to be 0.73 min, 2.56 min, and 1.01 min. The company uses a PFD allowance factor of 16%. Determine the standard time for the task. Solution # 2 Normal time T n = = 4.30 min; Standard time T std = 4.30( ) = min

50 PROBLEM # 3 Determine the personal time, fatigue, and delay (PFD) allowance to be used for computing time standards in the following situation. Second shift workers punch in at 3:30 p.m. and punch out at 12:00 midnight. They are provided one-half hour for supper at 6:00 p.m., which is not counted as part of the 8 ‑ hour shift. For purposes of determining the allowance, 30 minutes of break time (personal time and fatigue) are allowed each worker. In addition, the plant allows 35 min for lost time due to unavoidable delays. What should the PFD allowance factor be? Solution # 3 Allowance time for 30 min of break time plus 35 min for lost time = 65 min Allowance factor A pfd = 480 / (480-65) – 1 = – 1 = = 15.7%

51 PROBLEM # 4 The work shift at the ABC Company runs from 7:30 a.m. to 4:15 p.m. with a 45 min break for lunch from 11:30 to 12:15 p.m. that does not count as part of the work shift (workers are not paid for this time). The company provides two 12-min rest breaks during working hours (paid time), one in the morning and one in the afternoon. The company also allows 25 min per day for personal needs (paid time). In addition, a work sampling study has shown that on average, unavoidable delays in the plant result in 20 min lost time per worker per day (paid time). Determine the PFD allowance factor for the following two management policies on allowances: (a) the two 12-min breaks are both scheduled breaks that all workers take at the same time and (b) the two 12-min breaks are included in the allowance factor so that workers can take their breaks whenever they please.

52 Solution # 4 (a)Allowance time consists of 25 min for personal time + 20 min for delay time = 45 min. The two 12-min rest breaks are not figured into the allowance factor, but they do reduce the total work time during the shift. Total work time = 480 – 45 – 2(12) = 411 min. Thus, Allowance factor A pfd = 45/411 = = 10.95% (b) Allowance time consists of two 12 min rest breaks + 25 min for personal time + 20 min for delay time = 69 min. Total work time = 480 – 45 – 2(12) = 411 min. Thus, Allowance factor A pfd = 69/411 = = 16.79%