1 LHCb CALO 14.05.07 Anatoli Konoplyannikov Introduction Short recipe of the calorimeter Marathon crates control Step by step explanation Marathon power.

Slides:



Advertisements
Similar presentations
Presumed Asbestos Training Programme. Introduction Getting Started The Interface Top Tool Bar Creating a New Site Type I Survey Type II Survey Type III.
Advertisements

Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
Slide 117 th DCS Workshop – October, 10Francesca Poggio ZDC DCS Status Report Francesca Poggio Università degli Studi di Torino INFN, sezione di Torino.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
Lesson 18 – INSTALLING AND SETTING UP WINDOWS 2000 SERVER.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
Yu. Guz 2015/04/211 CALO HV Updated version of the 2012 slides, ** See also Anatoli’s.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
By: Ahmed Mirza December 3, 2009 EN393. Introduction Antivirus software is a computer application that detects, prevents and removes malicious software,
Joachim Schultes University of Wuppertal FIT Wiener DCS Training Session 2.1.
CIS 116SUNY Ulster Chapter L5 – The GUI Karl Wick.
Robert Gomez-Reino on behalf of PH-CMD CERN group.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
MDT PS DCS for ATLAS Eleni Mountricha
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (written by Michela) HV part updated by Oleg Maev 4-November-09.
Find the software in the PC  C:/PTmonitor/monitoring.
Status of Maraton problem Niko Neufeld Calo Commissioning meeting
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
ALICE DCS Meeting.- 05/02/2007 De Cataldo, Franco - INFN Bari - 1 ALICE dcsUI Version 3.0 -dcsUI v3.0 is ready and will be soon posted on the ACC site.
FTP for Windows How to get ftp to work in Windows -Navigate to control panel -> programs and features -On the left side click on Turn Windows features.
22 October 20151/23Fabio Vinagre -- TileCal DCS TileCal DCS Expert tutorial - DCS 22 October 2015.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Sep. 18th 2006 Stefan Koestner Installation Guide ECS-tools for the CCPC/Tell1 (Installation): Many problems/user- requests already arises when installing.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Unzip the attachment and double click to run it..
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
PHOS DCS guide (for PVSS based products only) Alexander Mamonov Last update: 1 th October, 2010.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
ALICE Use of CMF (CC) for the installation of OS and basic S/W OPC servers and other special S/W installed and configured by hand PVSS project provided.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
04ABR07Calo Commissioning Meeting - Xvc1 Power Supplies Xavier Vilasis-Cardona.
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
Chamber Monitor Panel Emiliano Furfaro 16 october 2012.
CheckPoint Reporting System for Seismic Surveys Setting Up for Multiple Users December 2012 Mid Point Geo Limited PO Box 7437 Reading Berkshire RG27 7HQ,
1 The Muon Shifter October Forewords This pages are meant to initiate people who are not familiar with ECS (Experiment Control System), and Muon.
March 7th 2005 Stefan Koestner LHCb week ECS-tools for the CCPC/Tell1 (Installation): Many problems/user- requests already arises when installing the framework.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED News New LED scan and stability data for ECAL were.
1 LHCb meeting Anatoli Konoplyannikov Introduction Which HV to be set before beam will come? Needed Constants PVSS data point type (DPT) format.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
1 User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (to be checked by Michela) I have simply put together the.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS Instructions K. Grogg, M. Weinberg, M. Grothe 1/24/20161.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Configuration database status report Eric van Herwijnen September 29 th 2004 work done by: Lana Abadie Felix Schmidt-Eisenlohr.
1 Summary of Calorimeter LED monitoring, LV & MV power and HV electronics + ECS control Anatoli Konoplyannikov Outline  Software tool of the LED.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Section 4 The Basics of Windows 7. Windows 7 Versions  Home Premium  Professional  Specialized.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
Clara Gaspar, February 2007 LHCb’s Experiment Control System & Electronics Integration Step by Step.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
27SEP2008Calo Running and Operation Monday Meeting - Xvc1 ECS Xavier Vilasis-Cardona.
Muon Shifter Start Manual – July 08 1 The (im)Perfect Muon Shifter.
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
llow or.
Select Your Meeting Export Your Contacts From Outlook How to create a csv contact file from Outlook to import into Select Your Meeting
Publishing PVSS data on the Web
WINDOWS 10 Cheat Sheet Start menu: Left click to access. Right click for quick access to settings, control panel, power, task manager, etc. Global windows.
Presentation transcript:

1 LHCb CALO Anatoli Konoplyannikov Introduction Short recipe of the calorimeter Marathon crates control Step by step explanation Marathon power crates control

2 LHCb CALO Anatoli Konoplyannikov Marathon power crates control Short recipe of the calorimeter Marathon crates control Connect to cadcs01w with online user’s account Start PVSS project “MARATHONPS" Start "DeviceEditor" panel in PVSS console window In Navigator FSM Mode Go To calorimeter sub-detector menu (e.g. PRS_DCS_C) and open the tree panel below (using right Click ->”View”) Unlock the tree below (click on the lock and select “Take”) From top “State” level click “Load” for loading ConfDB Select a needed crate and click on “State”, then chose a needed action (ON/OFF). For looking in details on the power status double click on each individual crate (“Sub-System”) and channels. Do the same with others crates In case of a problem, restart the OPC server -> In command Window: - Go to C:\Program Files\W-IE-NER\WienerOPC Type: WienerOPC -u Type: WienerOPC -r

3 LHCb CALO Anatoli Konoplyannikov Marathon power crates control PVSS panels for running Marathon power supply control project Check the OPC Client is running Start Device_Editor

4 LHCb CALO Anatoli Konoplyannikov Marathon power crates control Calorimeter side C sub-detectors FSM trees of the FE crates control sub-detector top run “View” First time click on “StartRestart”

5 LHCb CALO Anatoli Konoplyannikov Marathon power crates control 1. “Take” 3. “Switch ON” Sub-detector top level panel 2. “Load” ConfDB

6 LHCb CALO Anatoli Konoplyannikov Marathon power crates control FE crate power supply control and status panel Channel Status Control Selection

7 LHCb CALO Anatoli Konoplyannikov Marathon power crates control Power supply Channel Status panel