API Task Group on GAS LIFT Equipment Chair - Jim Bennett ExxonMobil.

Slides:



Advertisements
Similar presentations
February 5 & 6, Spring Gas-Lift Workshop ASME/API Gas-Lift Workshop API RP 11V5 Continuing the Review of Recommended Practices for Operation,
Advertisements

Gas-Lift Recommended Practices Proposals for Additional Documents
February 5 & 6, Spring Gas-Lift Workshop Spring ASME/API Gas-Lift Workshop Proposed New API RP 11V10 Recommended Practice for Operation,
New Gas Lift Products & Technology
ASTM Work Item Collaboration Area February Purpose of Collaboration Space Web forum that enables a task group to accelerate the development of a.
ISO ESP Systems Task Group Leader, Shauna Noonan
GAS LIFT OPERATION By : Ubet Khoirudin TOTAL E&P INDONESIE.
SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.
Mechanical Integrity of Tubing
Feb. 6, ASME/API Gas-Lift Workshop1 Using Chokes in Unloading Gas-Lift Valves by Ken Decker, Decker Technology Cleon Dunham, Oilfield Automation.
API GAS LIFT TASK GROUP CHAIR - JIM BENNETT EXXONMOBIL.
AN INTRODUCTION TO: from the leading resource for education and information in the repair industry... TECHNICAL GUIDELINE S Guideline for Design, Installation,
Cover graphic should fill and not exceed the defined grey box. June 27, 2013 Gary Devlin API Subcommittee 18 – Quality Task Group 7: Product Life Cycle.
Cover graphic should fill and not exceed the defined grey box. June 14 th, 2012 Gary Devlin API SC 18 – Quality Product Life Cycle TG7.
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
Copyright 2001 SIEP B.V. Gas-Lift Surveillance Tools of the Trade Jim Hall 5 February, 2002 ASME/API Gas-Lift Workshop.
Optimum Performance in Dual Gas-Lift Wells ASME/API/ISO Spring 2004 Gas-Lift Workshop February 10-11, 2004.
By: Gatut Widianoko Weatherford Artificial Lift Systems
Objectives for Basic Gas Lift Seminar
Remote Operation of Gas-lifted Wells John Stewart Shell Technology.
ASME Gas Lift Workshop Spring 2004 Dual Gas Lift Breakout Session Dual Gas Lift Breakout Session February 10, 2004.
Gas Lift Training Feb 5, 2002 ASME Gas Lift Workshop Mike Johnson, EMPC/Central Engineering-SSE.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
Nov. 12, Fall ASME/API Gas-Lift Workshop ASME/API Gas-Lift Workshop Using Chokes in Unloading Gas-Lift Valves by Ken Decker, Decker Technology.
API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.
Spring 2002 ASME/API Gas-Lift Workshop General Layout of Workshop and Call for Papers/Presentations General Instructions The workshop will be held at the.
Equipment Development for Gas-Lift in Sub-Sea Operations Roger Stinson Product Manager - Gas Lift Schlumberger Completions Systems.
2003 ASME/API GAS-LIFT WORKSHOP Dual Gas Lift – EMEPMI Experience
7.4.3 Student Book © 2005 Propane Education & Research CouncilPage Identifying Systematic Troubleshooting Techniques and Guidelines for Gas Operated.
Systems and Network Design Professional Services for NT Server and NetWare Networks.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
LAFAYETTE, LA NEW ORLEANS, LA HOUSTON, TX.
SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.
API 11V Task Group 15 November, 2007 Houston, USA.
Systems and Network Design Professional Services for NT Server and NetWare Networks.
Nov. 13, Fall ASME/API Gas-Lift Workshop ASME/API Gas-Lift Workshop Gas-Lift Future An Extension of the Past, or a Whole New World? by Cleon.
EGLV – ELECTRIC GAS LIFT VALVE (Field Trial at S181) - THE OPERATOR’S PERSPECTIVE.
2013 ASME/ALRDC Gas-Lift Workshop
API 19 CI Chemical Injection Devices for Downhole Applications
API 19 CI Chemical Injection Devices for Downhole Applications
REVISIONS DATE SLIDE CHANGE 11/22/10
ISO Gas-Lift Work Task Session Fall 2003 Gas-Lift Workshop
API Gas-Lift Task Group Session Fall 2003 Gas-Lift Workshop
2001 ASME/API Gas-Lift Workshop
Fall 2001 ASME/API Gas-Lift Workshop
API RP 17A - Discussion Points
MODULE A - ADMINISTRATIVE
Spring 2003 ASME/API Gas-Lift Workshop
ISO Task Group Update Wayne Mabry.
2016 Gas-Lift Workshop Chair: Jim Hall, Shell International E&P
Gas-Lift Design Outline
Status Update on API 16Q / 16R / 16F
2010 ASME/ALRDC Gas-Lift Workshop
For more information or to nominate papers, displays, etc., contact:
API 14H Task Group Status Proper Classification of Document
Spring 2008 ASME/API/ISO Gas-Lift Workshop
CHAIR - JIM BENNETT EXXONMOBIL
Development of a specification
API 14H Task Group Status Proper Classification of Document
Gas Lift Workshop – 2003 ISO Update
2019 Gas-Lift Workshop Chair: Steven Freeman, Shell Oil Company
2001 ASME/API Gas-Lift Workshop
For more information or to nominate papers, exhibits, etc., contact:
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
Gas-Lift Breakout Session Report Out Fall 2003 Gas-Lift Workshop
For more information or to nominate papers, displays, etc., contact:
CHAIR - JIM BENNETT EXXONMOBIL
2002 Spring ASME/API Gas-Lift Workshop
2002 Spring ASME/API Gas-Lift Workshop
Presentation transcript:

API Task Group on GAS LIFT Equipment Chair - Jim Bennett ExxonMobil

TASK GROUP MEMBERS 30+ current members –1/3 operating company representatives –1/3 manufacturing company representatives –1/3 consultants Always looking for knowledgeable individuals willing to help

11V1 – Specification for Gas Lift Equipment Gas Lift Valves, Orifices, Reverse Flow Valves, Dummy Valves, and Wireline Retrievable Valve Mandrels Will be replaced in the future by ISO specification

11V2 - Recommended Practice for Gas Lift Valve Performance Testing Covers the test procedures for flow performance testing of wireline retrievable and tubing retrievable IPO (injection pressure operated), and PPO (production pressure operated) gas lift valves

11V5 - RP for Operation, Maintenance, and Trouble-Shooting of Gas Lift Installations Cleon Dunham – Current Work Group Leader Covers RPs on kickoff and unloading, adjustment procedures, troubleshooting diagnostic tools, and location of problem areas for gas lift operations The RP is under revision – contact Cleon Dunham to participate

11V5 Review Document is available online for review purposes: wellanalysis.com –user name = api_gaslift –Password = moreoil Contact Jim Bennett for hard copy Proposed review meeting April 8, in Houston

11V6 - RP for Design of Continuous Flow Gas Lift Installations Using Injection Pressure Operated Valves Sets guidelines for continuous flow gas lift installation designs using injection pressure operated valves

11V7 - RP for Repair, Testing, and Setting Gas Lift Valves Applies to repair, testing, and setting gas lift valves and reverse flow (check) valves. It presents guidelines related to the repair and reuse of valves; these practices are intended to serve both repair shops and operators.

RP 11V8 Gas Lift System Design and Performance Prediction Waiting to Print!! John Martinez – Work Group Leader The RP emphasizes gas lift as a system and discusses methods used to predict its performance.

11V9 Recommended Practice for Operation, Maintenance, Troubleshooting, and Design/Re- Design of Dual Gas-Lift Systems Work Group being led by Cleon Dunham

11V10 Design and Operation of Intermittent and Chamber Gas Lift Wells and Systems Ali Hernandez leading work group Initial draft complete

API GAS LIFT TASK GROUP TO VOLUNTEER- CONTACT CHAIR - JIM BENNETT EXXONMOBIL