The HIE-ISOLDE Design Study Richard Catherall ISOLDE Technical Coordinator CATHI Final Review Meeting Marina H10 Hotel, Barcelona 22 nd – 26 th September.

Slides:



Advertisements
Similar presentations
Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.
Advertisements

EAR2 simulation update Collaboration board meeting Christina Weiss & Vasilis Vlachoudis.
Design of Beam Line for Ion Transport at Low Energies and The Ejection of Specific Ions From Electron Beam Brice Cannon † ** Research Advisor (s): Fredrik.
MEDICIS : status, plans, interlocks and coactivity with ISOLDE ISOLDE ISCC 13 February 2015 Stefano Marzari EN-STI-RBS.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
May 17-19, 2000 Catalina Island, CA Neutrino Factory and Muon Collider Collaboration Meeting 1 Target Support Facility for a Solid Target Neutrino Production.
The ISOLDE robots upgrade JL GRENARD EN-HE ISOLDE Workshop and Users meeting
Mid Term Review Meeting, 26 September 2012S. GIRON1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
ENEN Collimator Materials for LHC Luminosity Upgrade: Status of Irradiation Studies at BNL Collimation Upgrade Specification Meeting 21/06/2013 N. Mariani.
Tests at HiRadMat of advanced SiC and Al 2 O 3 as model targets for radioisotope beam production Experiment proposal Collaboration: Michal Czapski*, Thierry.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
FETS-HIPSTER (Front End Test Stand – High Intensity Proton Source for Testing Effects of Radiation) Proposal for a new high-intensity proton irradiation.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
CATHI and the HIE-ISOLDE Design Study
Target conceptual design WP6, ESR9 CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Serena Cimmino – Stefano.
EN-STI Group meeting 1 st February 2013 EN-STI Group meeting 1 st February 2013 Interventions for LS1 Elodie Macario EN/STI.
CERN ISOLDE / HIE ISOLDE 1 Isolde Target Modulator Prototype development prepared by T. Gharsa TE-ABT-EC CERN.
Status of The HIE-ISOLDE Design Study Richard Catherall EN-STI ISCC Meeting 30 th October 2012 CERN.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
Administrative Support Receipts Attendance certificates Any other information Ayse Annelie.
Richard Catherall EN-STI 2 nd February 2011 ISCC Technical Report & Report from the Standing Group for the Upgrade of ISOLDE.
Mats Lindroos Future R&D: beta-beam Mats Lindroos.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Heat load of the radiation cooled Ti target of the undulator based e+ source Felix Dietrich (DESY, TH-Wildau),Sabine Riemann(DESY), Andriy Ushakov(U- Hamburg),
F. Regis, LINAC4 – LBS & LBE LINES DUMP DESIGN.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
The HIE-ISOLDE Faraday Cup
HIE-ISOLDE Design Study Richard Catherall EN-STI-RBS ISOLDE Workshop and Users Meeting th – 27 th November 2013.
High Resolution Separator
Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Considerations for an SPL-Beamdump Thomas Otto CERN in collaboration with Elias Lebbos, Vasilis Vlachoudis (CERN) and Ekaterina Kozlova (GSI) Partly supported.
Mid Term Review Meeting, 26 September 2012M.AUGUSTIN1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Status of the Design Study Richard Catherall EN-STI-RBS.
Radiation protection and radiation safety issues for HIE-ISOLDE. FLUKA calculations Y. Romanets ISOLDE Workshop and Users meeting 2010 CERN, 8 December.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
LIEBE: Design of a molten metal target based on a Pb-Bi loop at CERN-ISOLDE 6/25/2014 LIEBE project meeting1 T. De Melo Mendonca, M. Delonca, D. Houngbo,
Characterization of the nTOF Radioactive Waste M. Brugger, P. Cennini, A. Ferrari, V. Vlachoudis CERN AB/ATB/EET.
TPSG4 validation at HighRadMat #6 Cedric Baud, B. Balhan, Jan Borburgh, Brennan Goddard, Wim Weterings.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Mid Term Review Meeting, 26 September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
Mid Term Review Meeting, 26 September 2012A. Shornikov 1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
BENE/EURISOL-DS Joint Meeting, CERN, SwitzerlandFebruary 22, Progress in the Liquid Mercury Multi-MW Target Design Studies Y. Kadi On behalf of.
An Integrated Remote Target Handling System for CERN’s MEDICIS Radioactive Isotope Production Facility Keith Kershaw, Stefano Marzari, Jean-Louis Grenard.
HIE-ISOLDE Design Study Safety and Beam Quality Challenges for the HIE-ISOLDE Frontend Jacobo Montaño (EN/STI/RBS) HIE-ISOLDE Workshop, November 2013 *
LIEBE Target Design Review. Schedule This comment is no longer valid as the schedule has been postponed and the beam permit will be requested for Q
LIEBE project Safety aspects of the Pb/Bi loop target LIEBE meeting report – WP5AP.Bernardes Thanks to : Richard Catherall/EN-STI, M.Delonca/EN/STI,
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
Paul Scherrer Institut 5232 Villigen PSI EURISOL/BENE_2007, PSI /GF34 Joint High Power Target Meeting EURISOL/BENE , CERN Direct target irradiation.
HIE-ISOLDE Workshop: The Technical Aspects Target Area Infrastructure Ventilation 29 November 2013 Andrea Polato* - CERN EN-CV-PJ * The research project.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
A summary of the SPES Safety Technical Advisory Committee SSTAC Richard Catherall ISOLDE Technical Coordinator 5 th December 2014 INFN, Legnaro.
V. Raginel, D. Kleiven, D. Wollmann CERN TE-MPE 2HiRadMat Technical Board - 30 March 2016.
PAD-MAD requirements for Access in ISOLDE target area
Heating and radiological
Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE.
Status of The HIE-ISOLDE Design Study
Seok-geun Lee, Young-hwa An, Y.S. Hwang
Report on HIE-ISOLDE Status
CERN’s MidTermPlan and the consequences for HIE-ISOLDE
Advanced Research Electron Accelerator Laboratory
C. Adorisio Extracted from the presentation given at
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Presentation transcript:

The HIE-ISOLDE Design Study Richard Catherall ISOLDE Technical Coordinator CATHI Final Review Meeting Marina H10 Hotel, Barcelona 22 nd – 26 th September 2014

The Report A detailed account of the approaches to address: – the issues associated with an upgrade of primary beam intensity and energy – the necessary upgrades required for an improvement in secondary beam quality A description of the most appropriate solution Approximate cost estimate and eventual timeline for its implementation CERN Yellow Report

Overall Layout Title page Foreword Participating members – Associated partners – Collaborating institutes etc Steering committee International Advisory Panel Management Board Design Study Members Preface Contents Executive Summary Introduction and Objectives Section 1 Infrastructure Section 2 Beam Quality Upgrade Section 3 Target Issues Section 4 Operations Section 5 Radioprotection and Safety Summary Section 6 cost and planning summary Conclusion List of publications associated with DS

Section 1: Infrastructure Upgrade Section Cooling and Ventilation – Andrea Polato, Michele Battestin Vacuum – Mario Hermann, Giovanna Vandoni, Maddalena Maietta, Tim Giles, Irina Graur Beam dumps – Valentina Venturi, Antonio Perillo Marcone Fluka simulations and radiation protection – Leonel Morejon, Vasilis Vlachoudis, Joachim Vollaire Interfaces – Robots, MEDICIS, infrastructure Richard

Section 1: Ventilation Ventilation – ISOLDE tunnel vs Class A laboratories – ISOLDE tunnel confinement – Water Cooling System – Targets – Beam dumps Proposal for future beam dump coolingSeparation of zones in terms of ventilation Stop supply of air into zone during operation See presentation by Andrea Polato

Study of propagation of radioactive contamination Monte-Carlo modelling of the whole Isolde beam-line, to determine the propagation of radioactive neutral isotopes and the distribution profile Sampling and measuring along the line Sampling via carbon filters as done in TRIUMF

Section 1: Infrastructure HRS and GPS dumps CFD (computational fluid dynamic analysis) analysis Thermal analysis Structural analysis analysis Present design study  beam upgrade will damage the dump Design proposed  active cooled CuCrZr block in front of old dump Max temperatures and stresses are below the material limits for a 2.0 GeV beam New dump design Calculations See presentation by Valentina Venturi

Radiation studies near ISOLDE tunnel Benchmarking Neutrons dose Hot targets Rails Activation See presentation by Leonel Morejon

Interfaces MEDICIS Laboratory High voltage cover Montrac rail for MEDICIS irradiation point New robots

Section 2 Beam Quality Upgrade Section Neutron converter – Serena Cimmino, Thierry Stora, Stefano Marzari Front end modifications towards beam improvement? – Jacobo Montano, Tim Giles HRS separator Magnet design – Mathieu Augustin, Tim Giles, Martin Breitenfeld, MRToF as a tool for High resolution – evaluation – Martin Breitenfeld HRS separator controls – Martino Colciago, Alessandro Masi, Mark Butcher RFQ Cooler Design – Carla Babcock, Tim Giles HRS Separator integration – Mathieu Augustin, Tim Giles, Carla Babcock, Jacobo Montano, Martin Breitenfeld REXEBIS Upgrade – Andrej Shornikov, Fredrik Wenander

FE Modifications: Extraction Electrode Remove moving parts subject to failure Eliminate the need to exchange the extraction electrode tip – Highly contaminated – High Dose rate See presentation by Jacobo Montano

Design proposal #3 Schematic 3D view of the layout #3 Beam emittance ε=3π.mm.mrad R = for more than 99% transmission of pure beam R ~ for 90% transmission of pure beam HRS Separator Design #3

Design & OPERA 3D Simulations for a 120 degree magnet See presentation by Mathieu Augustin

14 Electron Beam Ion Source (EBIS) for HIE-ISOLDE EBIS parameters REXEBIS (Now) HEC 2 for HIE-ISOLDE HEC 2 II for Demonstrated (Nov 2013) Electron energy [kV] Electron current [A] Electron current density [A/cm 2 ] x10 4 NA New EBIS – High Energy Compression and Current (HEC 2 ) EBIS  HEC 2 gun built at CERN, shipped to BNL and installed on Test EBIS  HEC 2 gun first operated at BNL in Nov 2013 on the real EBIS  Energy up to 30 keV and current up to 1.54 A were achieved in ~ 10 ms pulses  Diagnostic tools to measure the current density were set up for the next visit  The test stand is upgraded to enable higher current  Extended set of diagnostic tools is in production at CERN R&D in cooperation with BNL Advanced Ion Source group See presentation by Andrej Shornikov

Section 3: Target and Front End Upgrade Target Materials – Michal Czapski, Thierry Stora Target Design – Serena Cimmino, Stefano Marzari Front End Design – Jacobo Montano, Stefano Marzari, Tim Giles New High Voltage Modulator – Roger Barlow, Jan Schipper, Tony Fowler

Irradiation campaign (completed) protons ISOLDE beam 1.4 GeV σ = 3.5 Target LaC 20/09/ SiC prototypes RaBiT setup 11/ shuttles x 4 prototypes HiRadMat SPS beam 440 GeV σ = 2.0 HiRadMat facility 10/2012 all 24 prototypes ESR 8 Target Material Studies Shuttles opened Some pellets fractured Activity < LE Scheduled for SEM analysis At contact 220 μSv/h (10/2013) At 10 cm 340 μSv/h (01/2014) See presentation by Michal Czapski

Cold Line Target Container Uniform Thermal Field Release Efficiency Increase 75mm 90mm VoltageCurrentx5PotenzaThermocouplePyrometer T measured temperaturemeasured centermeasured sxmeasured dx [v][A][W][ ° C] (1573) Leak tightness Ohmic Heat / Containement Thermocouple See presentation by Stefano Marzari

Section 4 Operations Boundary Conditions for operations – Radioactive waste and target dismantling – Target performance – Access – Maintenance – Activation (air and material) – Robots Richard and volunteers

Section 5 Safety and Radiation Protection Summary Review of safety and radiation protection issues addressed throughout the report Identification of further issues to be addressed – ALARA – Dose rates etc etc Ana-Paula Bernardes, Joachim Vollaire

Water leak tests in ISOLDE target 4 tests of simulated water leak were performed in the bunker (b. 125) in collaboration with DGS-SEE on the workbench Assess the consequences of a water leak in the target at nominal operational temperatures A model of the Frontend was built representing volume and heating See presentation by Ana-Paula Bernardes

On behalf of ISOLDE community, I would like to say a big thank you to all the Marie Curie Fellows for their excellent contributions towards the HIE-ISOLDE project. But before you go….just a kind reminder to file your reports!!