Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.

Slides:



Advertisements
Similar presentations
Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
Advertisements

LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Injector De-cabling Project Project Team Meeting #
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Injector De-cabling Project Enlarged project meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
TE-EPC Activities during LS2 V. Montabonnet on behalf of TE-EPC group.
2 Davide Aguglia TE-EPC-FPC Sept. 23 rd rd PSB injection EPC powering rack space coordination meeting Stripping foil chicane BSW magnets powering.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Transformer positions for BISMV and BSW M. Hourican 2 March 2015.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
YETS PS&TT2 list of works planned and planning Simon Mataguez EN/MEF-OSS More info about the PS machine? Many thanks.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
Layout Experimental hall Final status (?) 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 HIE-ISOLDE Erwin Siesling.
SPS YETS 2015/2016 Planning meeting for BE-BI 09/12/15 David Mcfarlane EN-MEF D.Mcfarlane1.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
ABT review on the LIU-PSB Systems PSB KSW Magnets September 10 th 2014 L. Feliciano TE/ABT.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
A new RF system for the PSB. LIU-PSB Working Group Meeting, 10th December 2015 M. Paoluzzi December 10 th Wide working group involved including.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
Planned activities during (E)YETS… up to LS2 for PSB-PS equipment Etienne CARLIER On behalf of TE/ABT/EC.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Wim Weterings Remy Noulibos
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
V4.
YETS & LS2 Works EN-EL / Power distribution
SPS Personnel Protection System Renovation Project
Linac4-PSB 160 MeV connection readiness review
ABT-EC EYETS Activities 2nd reports
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
CLIC Civil Engineering & Infrastructure Working Group Meeting
EYETS David Hay EN-OSS.
BA6 – crab cavity activities in EYETS
AD consolidation activities in LS2
LIU–PLI report LIU PSB meeting.
EC Activities Status for the LIU
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Update on the Ethernet Network Installation Campaign
WPs concerned by L4 connection:
SPS activities during LS2 TE-EPC (Power Converter Group)
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
YETS & LS2 Works EN-EL / Power distribution
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Presentation transcript:

Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be moved; renovation/re-installation of RF equipment coordinated with TE-EPC to optimally re-configure the space (option 2) Power distribution/switchgears to be renovated (RF) and extended (strip foil) Water cooling needs. (EN-CV need to know the power distribution for ventilation and cooling. To ease the load on the existing ventilation, distributing the racks in different rooms is the preferred solution). False floor to be modified/reinforced Item #ObjectivewhoBy date 1Confirm that 50 ppm 40 kHz current ripple acceptableTE/ABTNow 2Cable length between pulse transformers and magnetEN/EL21 st Nov. 3Cable distance and path for BSW1 DCCTs (current measurement)EN/EL21 st Nov. 4Dimensions of identified zone for pulse transformersEN/EL – EN/MEF28 th Nov. 5Define the interfaces, type and number of cables, for magnet interlock. Actions with TE/EPC - TE/ABT5 th Dec. 6Define timing management solutions.TE/EPC – BE/OP12 th Dec. 7Define BIS current tolerance for safe operation in the PSB and HST.BE/ABP - BE/OP12 th Dec. 8BRF2 global integration studies considering RF renovation + HST global integration study TE/EPC - BE/RF EN/MEF – EN/EL Early Water distribution needs and workTE/EPC – EN/CVEarly 2015 Major actions to finalize functional spec. and finalize design / start purchasing Source Davide Aguglia (TE-EPC), Nov. 13 th 2014  Evaluate & optimise work that can be done in advance of LS2 during YETS 2015/2016?  Stakeholders to please carefully consider both options and the eventual impact either could have on your systems/services.

Option 1 NB… missing 6 racks Ethernet & interlocks

Possible only if the four RF cabinets are displaced. 2. BRF2/BAT racks integration Option 2 Identified: zone for BSW2, 3, & 4 pulse transformers

Possible only if the four RF cabinets are displaced. Option 1 Option 2 Linac4 connection to PSB in principal possible starting end 2016 Source A. Kosmicki & G. Georgiev

Length of the YETS / EYETS Length of the technical stops in the LHC, SPS, PS and PSB The length of the (E)YETS cannot be reduced. This is the reference to define and organize the works during the (E)YETS in order to reduce the workload for LS2, in particular in the PSB. 22 January 2015 Source J. Coupard, EN-MEF

Source PSB-LIU Machine. Preparations for the installation of the stripping foil power converters in BRF2 & BAT (Ref slide Georgi). Site preparations for the BSW 1L1 transformers close to the magnets (PSB injection region)… EN-MEF-SU (survey): Test oil injection jacks for the magnet alignment & tooling. Install magnet stack KSW16L1 and modify the vacuum chamber. Surface. New MPS (POPS-B), installation of the 4*18kV switchgear in M25. BCER: Removal of the obsolete BI.DIS infrastructure, prepare rack space. EN-EL consolidation works. Replace ERD16,17 & 18. BI.BVT`s, Install 4 new racks in the BHP. Install 16 additional power converters racks 258A and 258B BCER orbit correctors. Machine/Surface. Decabling campaign EN-EL. Activities to be scheduled YETS 2015/16 (as of date 16/04/2015)