Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.

Slides:



Advertisements
Similar presentations
Forum on Tracking Detector Mechanics 2013 University of Oxford June 19 th -21 th C 2 F 6 /C 3 F 8 saturated fluorocarbon cooling blends for the ATLAS SCT.
Advertisements

Condenser supply contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Pierre Bonneau EN/CV/DC
Detector Cooling Project Thermosiphon Project Status Report
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire 1CERN - 4th November 2011 Experience from Construction.
M. Battistin – 28 th May 2010EN/CV/DC1 M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop - Back-up solutions to.
EN-CV during LS1: Upgrade, Consolidation, Maintenance, Operation M Nonis EN/CV Chamonix 2012 – LHC performance Workshop On behalf of EN/CV Group.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
M. Battistin – 9 th June 2010EN/CV/DC M. Battistin (EN/CV/DC) 9 th June 2010 Detector Cooling Project - WP III Advancement Status.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
19 th November 2010EN/CV/DC Thermosiphon project IV review - Overall cost estimation and planning Michele Battistin Elena Perez Rodriguez 19 th November.
Thermosiphon Project - Condenser repair CERN – Geneva January 8 th, 2014 M. Battistin & all TS team ATLAS + EN/CV.
Magnet & services projects P. Tropea 9 Nov 2011 – CMS upgrade workshop.
JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st September 2009 ATLAS Working Group Thermo-siphon review - Low temperature condensation.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
EN-CV interventions during YETS
Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
Cooling plant upgrade Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
Cooling System Solutions
Thermosiphon project management and quality assurance EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
60kW Thermosiphon control system
Issues about the full scale thermosiphon (TSP ) D. Giugni Thermosiphon Review III, May 28 th 2010 D. GiugniThermosiphon Review III, May
Michele Battistin Elena Perez Rodriguez 10 November 2010
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
M. Battistin, J. Botelho – 20 October 2011EN/CV/DC Detector Cooling Project V Thermosiphon Workshop - Cost and Planning Michele Battistin Jose Botelho.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
D. GiugniThermosiphon Review, Oct 1st 091 Risk assessment for the thermosiphon cooling test system D. Giugni Thermosiphon Review, Oct1 st 2009.
Kirill Egorov Indiana University 20 October, th Thermosyphon Workshop 3D-modelling for hydraulic assembly Preliminary design of the TS “Balcony unit”
17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
Overview of recent CO 2 cooling developments As an example for LHCb-Velo and UT cooling? Kick-off meeting 28 may 14 Bart Verlaat 1.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire DCP Meeting 20/06/12 Schedule for the technical of June.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
M. Battistin –6 th July 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 6 th July 2009 DCP WP3 First thermo-siphon workshop - Low temperature condensation.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
M. Battistin –17 th d June 2009 DC Project 1 M. Battistin 17 th June 2009 Detector Cooling Project - WP3 Advancement status.
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
ATLAS Thermosiphon Readiness Review 17th March 2016
Forum on Tracking Detector Mechanics - Bonn, May 2016
Cooling technology Main components and equipments
Cooling systems for HL-LHC (WP17.3)
ATLAS Thermosiphon Electrical Distribution and Run Modes
Insertable B Layer Cooling System
Low temperature chiller Market Survey
Presentation transcript:

Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team ATLAS + EN/CV

Water circuit Low T chiller Brine circuit Condenser C 3 F 8 piping USA15 by-pass unit EL power supply Sonar systems Control system Documentation Planning TS achievements ATLAS Surface USA15 PX15 UX15 28/10/2013M. Battistin - Thermosiphon Project2

Why a thermosiphon solution 28/10/2013M. Battistin - Thermosiphon Project3 PR thermal screen others 4 liquid lines 4 gas lines pneumatic valve manual valve manual valve dummy load BPR pixel 6 X SCT manual valve 7 Haug compressors condenser liquid tank mixed water Sub-cooler pneumatic valve UX15 USA15 Today Compressor reliability Vibrations – Leaks (slightly activated fluid) Recent increase of dust (compressor wear)

28/10/2013M. Battistin - Thermosiphon Project4 PR thermal screen others 4 liquid lines 4 gas lines pneumatic valve manual valve manual valve dummy load BPR pixel 6 X SCT manual valve UX15 USA15 Tomorrow No active components Reduction of leaks No reason to “open” the circuit Possibility to decrease evaporation temperature from - 20 °C to -25°C and to -30°C using blends C 3 F 8 -C 2 F 6 Why a thermosiphon solution condenser liquid tank Heater pneumatic valve Low temperature Chiller USA15 Surface From compressors To compressors Full power dummy load

Chiller Circuit Water Circuit Brine Circuit Low Temperature StageHigh Temperature Stage Thermosyphon Circuit Primary Water TS Condenser Components of the TS Circuit 28/10/2013M. Battistin - Thermosiphon Project5 By-pass Let’s see photos showing the advancement for all components +25°C+27°C-30°C-70°C-65°C -68°C liquid +20°C liquid +20°C gas -25°C gas

Water Circuit 28/10/2013M. Battistin - Thermosiphon Project6 Water skid location in SH1 (Cryo building) in 2012

Water Circuit 28/10/2013M. Battistin - Thermosiphon Project7 Water skid location in SH1 (Cryo building) today Primary water heat exchanger Water circuit skid

28/10/2013M. Battistin - Thermosiphon Project8 SX1-SH1 corner in 2011

28/10/2013M. Battistin - Thermosiphon Project9 SX1-SH1 corner in 2011

28/10/2013M. Battistin - Thermosiphon Project10 3D model of the low temperature chiller Low temperature circuit (-30°C / -70°C) Low temperature circuit (-30°C / -70°C) Warm temperature circuit (20°C / -30°C) Warm temperature circuit (20°C / -30°C)

28/10/2013M. Battistin - Thermosiphon Project11 Chiller handling on March 2012

28/10/2013M. Battistin - Thermosiphon Project12 Beginning of chiller connection on April 2012 Power connection to the EL cupboards in SX1

C 6 F 14 brine pumping station 28/10/2013M. Battistin - Thermosiphon Project13

28/10/2013M. Battistin - Thermosiphon Project14 3D model of the pumping station – Cyril Degeorge

28/10/2013M. Battistin - Thermosiphon Project15 Construction of the brain skid in SXL1 – May th November 2012

28/10/2013M. Battistin - Thermosiphon Project16 Completion of installation and lagging – summer th November 2012

28/10/2013M. Battistin - Thermosiphon Project17 Water and brine piping connections – summer 2013

28/10/2013M. Battistin - Thermosiphon Project18 C3F8 condenser on the roof of SH1 building – C. Degeorge C 6 F 14 expansion tank C 3 F 8 condenser Degassing Sonar System

28/10/2013M. Battistin - Thermosiphon Project19 15 th March st November 2012

Condenser installation SH1 roof 28/10/2013M. Battistin - Thermosiphon Project20 C 3 F 8 Condenser C 6 F 14 expansion tank SH1 roof today

28/10/2013M. Battistin - Thermosiphon Project21 Sonar system – G. Hallewell, S. Katunin, C. Degeorge Sonar pipe Incondensable gases tank

28/10/2013M. Battistin - Thermosiphon Project22 Degassing sonar system has been: -pressure tested -leak tested -Sonar sensors feed-back OK Ready to be installed -on top of the condenser -at the next available crane transport.

C3F8 piping to USA15 cavern 28/10/2013M. Battistin - Thermosiphon Project23 SDX1 building Liquid DN50 line Gas DN200 line

28/10/2013M. Battistin - Thermosiphon Project24 By-pass installation in USA15 - C. Degeorge Liquid pre-heater Liquid-gas heat-exchanger Liquid-gas heat-exchanger Liquid post-heater Full power dummy-load Filters and measure sector

28/10/2013M. Battistin - Thermosiphon Project25 Construction in bdg 298 by EN-CV-DC section. S. Nichilo, O. Crespo, D. Lefils, P. Bonneau, F. Corbaz By-pass construction in bdg 298 – S. Nichilo EN/CV/DC

28/10/2013M. Battistin - Thermosiphon Project26 “Balcony” by-pass unit – 3 rd floor of USA15

28/10/2013M. Battistin - Thermosiphon Project27 Completion of cabling and lagging on the “balcony” unit

28/10/2013M. Battistin - Thermosiphon Project28 Connection to the “evaporative” in USA15 Liquid connection Liquid connection Gas connection Gas connection 4 gas return lines from the UX15 distribution racks 4 liquid supply lines to the UX15 distribution racks

TS – Compressors connections 28/10/2013M. Battistin - Thermosiphon Project29 Gas connection Gas connection Liquid connection Liquid connection Compressor room in USA15

Expansion gas tank connection + Sonar 28/10/2013M. Battistin - Thermosiphon Project30 Sonar Flow-rate + C 2 F 6 -C 3 F 8 concentration Sonar Flow-rate + C 2 F 6 -C 3 F 8 concentration Gas return to “big tank” connection. Compressor room in USA15 Gas return to the condenser Liquid supply from the condenser Gas “big tank” to guarantee 4 bar on pixel. Gas “big tank” to guarantee 4 bar on pixel.

Power and control cubicles in SX1 28/10/2013M. Battistin - Thermosiphon Project31

PVSS-UNICOS control ready Low T Chiller: PLC program done Water & Brine circuits: Functional Analysis done PLC program done Thermosiphon circuit: Functional Analysis done Thermosiphon circuit: PLC program done Low T Chiller: PLC program done Water & Brine circuits: Functional Analysis done PLC program done Thermosiphon circuit: Functional Analysis done Thermosiphon circuit: PLC program done L. Zwalinski (ATLAS) B. Bradu (EN/ICE) 28/10/2013M. Battistin - Thermosiphon Project32

Thermosiphon technical note (EDMS ) released; 2 kW thermosiphon tests results (EDMS ) released; Safety file (EDMS ): – Descriptive part eng. check; – Demonstrative part on-going; – Documentation database on-going; Risk Analysis (EDMS ); Leak rates analysis (EDMS ) released; Functional analysis (EDMS ) released; Commissioning procedures (EDMS ) in work. Documentation 28/10/2013M. Battistin - Thermosiphon Project33 Complete revision of the EDMS structure – Cecilia Rossi

Thermosiphon on ID cooling I/O test:Nov 2013 Functional tests in by-pass:Dec 2013 – Jan 2014 Performance test in by-pass:Feb-Mar 2014 Compressors-Thermosiphon swap:Apr 2014 Thermosiphon on ID cooling tests:from May /10/2013M. Battistin - Thermosiphon Project34 Main missing points: -Installation of the degassing sonar system on the condenser -Installation of the roof over the condenser -Installation of some cable between SX1 and SH1 roof

On behalf of the TS team ATLAS Alexander Bitadze Claudio Bortolin Cyril Degeorge Jan Godlewski Wieslaw Iwanski Cecilia Rossi Lukasz Zwalinski Iyri & Michail Sonar Team – G. Hallewell, S. Katunin EN-CV Anders Andersen Stephane Berry Pierre Bonneau Jose Botelho Direito Florian Corbaz Olivier Crespo Enrico Da Riva Daniel Lefils Stefano Moccia Sylvain Nichilo EN-MME Said Atieh, Aline-Marie Piguiet Didier Lombard + welder team Thanks for your attention. Any question? 28/10/2013M. Battistin - Thermosiphon Project35 HSE Phillip Santos Silva Pierre-Yves Buisson EN/ICE Benjamin Bradu GS Eliseo Perez