Technical Report for the ISCC Meeting 23 rd June 2010 Richard Catherall EN-STI-RBS.

Slides:



Advertisements
Similar presentations
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Advertisements

1 Operating Experience and Reliability Update on the 5 kW CW Klystrons at Jefferson Lab Richard Walker & Richard Nelson Jefferson Lab, Newport News VA.
Operational aspects 2008 run ISCOOL Isolde workshop Nov 2008 Erwin Siesling.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
EN-STI Group meeting 1 st February 2013 EN-STI Group meeting 1 st February 2013 Interventions for LS1 Elodie Macario EN/STI.
09/13/20111 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
Richard Catherall EN-STI CERN, 1 st February 2012 ISOLDE Technical Report for the INTC.
Richard Catherall EN-STI CERN, 6 th July 2011 ISOLDE Technical Report for the ISCC.
Low Emittance RF Gun Developments for PAL-XFEL
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Richard Catherall EN-STI 2 nd February 2011 ISCC Technical Report & Report from the Standing Group for the Upgrade of ISOLDE.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
RILIS: new advances and future prospects V. Fedosseev for ISCC meeting 10 November 2015.
Update on the Laser Beam Line
Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team.
Technical report for ISOLDE INTC 19 May 2007 Mats Lindroos.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
ISOLDE Technical Report Richard Catherall ISOLDE Technical Coordinator 50 th INTC meeting 1 st July 2015.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
High Gradient RF Issues and 88 MHz test results M. Vretenar for the 88 MHz team: R. Garoby, F. Gerigk, J. Marques, C. Rossi, M. Vretenar -The.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Status of the Design Study Richard Catherall EN-STI-RBS.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
Krzysztof Radwan, PJAS, TE/VSC/ICM Interlocks, Controls and Monitoring Section HIE-ISOLDE Vacuum Controls INSTALLATION.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
Richard Catherall EN-STI CERN, 3 rd November 2011 ISOLDE Technical Report for the INTC.
COPPER PHOTOCATHODES DEVELOPMENTS AT ASTEC R. Valizadeh Accelerator Science and Technology Centre Science & Technology Facility Council, UK.
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
18/March/2008OP-days S.Mataguez / O.Hans1 Hardware Problems in the PS complex LINAC 2 BOOSTER PS AD Thanks to all that helped and provided information,
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.
ELENA installation progress F. Butin / ELENA collaboration.
Technical Report for the ISCC Meeting 23 rd June 2010 Richard Catherall EN-STI-RBS.
ISOLDE Technical Report for the ISCC
Richard Catherall EN-STI 2nd February 2011
Technical Report for the ISCC Meeting 23rd June 2010
ELENA installation and commissioning status
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Technical Report for ISOLDE
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
RF operation of REX-ISOLDE
HIE-ISOLDE Project: Planning & Resources
ISOLDE Technical report for INTC 21/5/2007
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
Technical Report ISCC Meeting 16th February 2009
Technical report for ISOLDE INTC 19 May 2007
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
Technical Report for ISOLDE
Advanced Research Electron Accelerator Laboratory
A. Herlert, CERN PH-SME-IS
(Beam) Commissioning Plan
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Presentation transcript:

Technical Report for the ISCC Meeting 23 rd June 2010 Richard Catherall EN-STI-RBS

Overview ISOLDE Front End Exchange HT Transfer Tube (Boris tube) Insulator Exchange + cabling ISOLDE Vacuum System and Controls Shutdown work summary – Target Area and Experimental Hall REX – Low energy, cathode issues and Linac consolidation RILIS News from EN-STI

Front End Exchange Not just a question of swapping: – Power supplies – FE Controls and Integration – Vacuum systems and controls – Cabling – Compressed air – Water distribution – Alignment – Mechanics – Robot re-programming – RP surveillance and Waste Disposal – Planning, testing, commissioning – Regular follow-up and schedule meetings – Documentation An excellent demonstration of teamwork across different CERN groups with the common objective of commissioning the FE before start-up in May. [μSv] Phase n° : Découplage de la cible #415 et préparatifs Sortie Frontend 3 et préparation de la zone Décablage et remplacement isolateur Boris tube Recablage HT, BT, air et eau Installation FE6 et alignement Couplage et connectique Ajustements et tests TOTAL Collective Dose Summary

Boris tube insulator exchange & cabling Insulator replaced while maintaining central HT transfer tube in position. Insertion of main power cables from below while being hoisted from above. Insertion of gas lines, water tubes and auxiliary cables. GPS insulator showing signs of degradation. – Two coats of Stycast epoxy applied to assure 60kV operation during – Collective dose: 199 uSv

Vacuum System and Controls Thanks go to TE-VSE and EN-ICE for implementing the new vacuum system and controls on time. Included – Cable removal and re-cabling – Integration of new FE#6 controls with provision for FE#7 controls – Major overhaul of controls equipment (gauges, controllers etc..) – Modification of vacuum equipment (venting, exhaust gas storage, pumps etc) – Inclusion of interlocks with other groups (Power, controls, fluids) – Excellent collaboration

Shutdown work 1: Target Area Remote Handling – Robot revision – Camera maintenance – Installation of target coupling controls – Faraday cage piston exchange Infrastructure – Alignment previsions To monitor HRS alignment from a distance – Ventilation maintenance Filters, controls – Vacuum maintenance Primary pumps, gas tank security – FC cleaning – FE maintenance extraction electrode tip exchange, piston exchange – BTY magnet inspections Covering of exposed connectors

Shutdown work 2: Experimental hall ISOLDE Hall – RFQ amplifiers upgrade More reliable, migration of controls to FESA – AC water leak repair No more “water in the hall” – Vacuum Turbo and primary pump maintenance. Controls… Gas buffer tanks displacement outside separator area – Civil engineering work Hole boring for cable passage, hole widening for MISTRAL removal – Revision of power supply interlocks Due to new vacuum sections including RFQ + FE controls – Scanner and FC maintenance Including BD controls and tape station maintenance – Controls modifications (especially for new FE controls) Integration into FESA and work stations – New applications Vistar alarms, automatic target start up sequence, FC display – HT power supply repair and installation Astec 60kV replacing spare FUG supply – Laser window exchange – New fire detection System – Spare cooling water pump repaired

REXTRAP control system upgrade in progress Timing specified and hardware tests on-going Sampling solutions under evaluation RF amplifiers being tested DAC and VME ordered PLC installed and operational (software to be changed) Pulsed power supplies in fabrication Meanwhile – present PROFIBUS communication problems corrected REX separator shielding to WITCH magnetic field Discussions about extending the shielding Will have consequences for REX operation – several modification required, to be discussed REXEBIS SC magnet problems After cooling filling, LHe hold-time decreased from 10 days to 15 h System half-warmed up; leak tests at ~100 K and 77 K; no leaks found Thereafter cooled down, now working Good but unsatisfying / lacking explanation – will happen again without notice? Plan to require a Twin EBIS from Manne Siegbahn Laboratory, Stockholm Low energy F. Wenander

1. Intense cathode study during shutdown triggered by Be run Oct 2009 Cleaned Cu electrodes surfaces Reduced conductive heat losses New NEGs Shunted cathode installed SEM/EDS investigations 2. Start-up after shutdown Little current emitted poisoned cathode (i.e. changed work-function) 3. Back to usual heat loss configuration Al 2 O 3 isolators instead of steatites Re-oxidized Cu electrodes New cathode installed 4. Second cathode also poisoned Used oxygen injection for cathode revival Eliminated possible reason after reason 5. Number of tests and investigations performed -> REX cathode M. Scheubel EN-MME F. Wenander

40 Ar Ne C O Ne C Ne Ar Ne Ar O Ne Ar N Ne 6 + * The spectrum reveals the presence of C (~20 at.%), La, O and B. (C and O normal) * Traces of F are also observed, not confirmed X-ray photoelectron spectroscopy (XPS) D.Letant-Delrieux TE-VSC-SCC crystal orientation surface contamination (XPS) crystal stoichiometry (EDS) surface roughness (SEM) gas inlet (O 2 and CO 2 ) temperature measurements EBIS potential modifications heat simulations * Relative atomic surface concentrations calculated from the photoelectron peak intensities in the XPS spectra Extremely good vacuum with new NEGs Residual gas spectrum Strong temperature gradient for given thermal conductivity and emissivity: back ≈ 2100K, front ≈ 1800K. Wehnelt electrode: T ≈ 570K, ΔT ≈ 3K Anode electrode: T ≈ 490K, ΔT ≈ 1K LaB 6 M. Kronberger BE-ABP-HSL F. Wenander

* No final conclusion or solution * Short term action plan Exchanged to a different batch cathode 18/6 Introduce gas leak close to gun Exchange for Cu electrodes with Ta inserts? Await results from manufacturer’s test-bench * Long term action plan (options) Purchase similar LaB 6 from Kimball Physics 20 weeks delivery time Small rebuilding of gun (~6 weeks, simulations excluded) Procure IrCe cathode from Russia major rebuilding of gun (>3 months excl tests) Setup test-bench (3 month to 1 year, depending on version) REX cathode cont’d

Linac consolidation I Linac RF cooling and ventilation New ventilation for the RF room + Modification of RF amplifier (water cooling with heat exchangers) -> improve temperature stability + cleanliness -> longer RF tube lifetime (25kCHF/piece) Linac shielding Construction of shielding tunnel around the linac -> remove lead boxes on cavities -> faster and easier access to equipment -> less X-ray background at Miniball Finished D. Voulot & F. Wenander

Linac consolidation II Beam instrumentation controls Replace old Windows based control system with VME control server -> CERN standard (piquet support, easier to maintain) -> modular system (possibility of extension and modifications) New tuner mechanics for 7-gaps Improve reliability and stability -> less RF interruptions Linac steerers -> improved beam optics -> scaling reproducibility Commissioning phase One already installed (7-gap3) Two more units ready for installation 4 units installed (+1 spare) D. Voulot & F. Wenander

Nd:YAG 2008/2009 RILIS: upgrade of Nd:YAG lasers Reconfigured at Edgewave in 2009/10 shutdown - Improved optics and external THG unit Green Beams 85 W ( nm UV Beam nm IR Beam nm Rapid decline in power output Degradation of THG crystal 2 Green Beams 70 W nm UV Beam nm IR Beam nm Nd:YAG 2010 Adjustable power distribution Improved UV reliability 2 Green Beams 110 W in adjustable 532 nm 15W more green power V. Fedosseev & B. Marsh RILISRILIS

Removal of Copper Vapour Laser and replaced with new Syrah Dye lasers Benefits: Greater efficiency and stability. Higher UV power and better beam quality. Enable UV pumping to provide beams in the 380 – 540 nm range. Wavelength control via LabVIEW RILISRILIS