1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.

Slides:



Advertisements
Similar presentations
Brookhaven Science Associates U.S. Department of Energy Todd Satogata 1 Fri May RHIC FY03 Deuteron-Gold Performance n RHIC Deuteron-Gold Performance.
Advertisements

1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
Ion Accelerator Complex for MEIC January 28, 2010.
RHIC polarized protons – The next decade – Wolfram Fischer 14 May 2010 RSC Meeting, Iowa State University.
Winter Workshop, San Diego Mar 16, 2006Angelika Drees Short- and Long-term Future of RHIC Introduction Luminosity, Luminosity Limitations Runs so far and.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
MeRHIC Design V.Ptitsyn on behalf of MeRHIC Design team: M. Bai, J. Beebe-Wang, I. Ben-Zvi, M. Blaskiewicz, A. Burrill, R. Calaga, X. Chang, A. Fedotov,
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
Internal target option for RHIC Drell-Yan experiment Wolfram Fischer and Dejan Trbojevic 31 October 2010 Santa Fe Polarized Drell-Yan Physics Workshop.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
Thomas Roser NSAC subcommittee April 4, 2005 Facility Strategy RHIC performance overview Luminosity and polarization evolution (towards “enhanced luminosity”)
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
Thomas Roser EIC collaboration workshop MIT, April 6, 2007 eRHIC Design eRHIC Schemes R&D Items Cost and Schedule.
Toward a Test Facility for an ERL Circulator Ring Based e-Cooler MEIC Electron Cooler Test Facility Planning Retreat January 31, 2012.
MEIC Electron Cooling Simulation He Zhang 03/18/2014, EIC 14 Newport News, VA.
Wolfram Fischer1 2 superconducting 3.8 km rings 2 large, 1 small experiments 100 GeV/nucleon Au 250 GeV polarized protons Performance defined by 1. Luminosity.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Alexei Fedotov, 02/02/12 1 Potentials for luminosity improvement for low-energy RHIC (with electron cooling) February 2, 2012.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
ERHIC Conceptual Design V.Ptitsyn, J.Beebe-Wang, I.Ben-Zvi, A.Fedotov, W.Fischer, Y.Hao, V.N. Litvinenko, C.Montag, E.Pozdeyev, T.Roser, D.Trbojevic.
Heavy Ions in RHIC – How to get to higher Luminosities? Angelika Drees APS DNP Fall meeting Oct. 30, 2003 I.Accelerator Basics II.Luminosity Limitations.
October 4-5, Overview of ARRA funded AIPs at C-AD Wolfram Fischer October 4, 2010.
ERHIC with Self-Polarizing Electron Ring V.Ptitsyn, J.Kewisch, B.Parker, S.Peggs, D.Trbojevic, BNL, USA D.E.Berkaev, I.A.Koop, A.V.Otboev, Yu.M.Shatunov,
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
ERHIC design status V.Ptitsyn for the eRHIC design team.
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
BROOKHAVEN SCIENCE ASSOCIATES Electron Cooling at RHIC Enhancement of Average Luminosity for Heavy Ion Collisions at RHIC R&D Plans and Simulation Studies.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
J.M. Jowett, S. Maury, PANIC05 HI Satellite meeting, 23/11/ LHC as a Heavy-Ion Collider An update John M. Jowett, Stephan Maury I-LHC Project CERN.
Prospects for RHIC Low-Energy Operations Todd Satogata (W. Fischer, T. Roser, A. Fedotov, N. Tsoupas, M. Brennan, C. Montag, and others) “Can We Discover.
09-21 Study of bunch length limits Goals: To identify and observe effects which put limits on the minimum bunch length in RHIC. Try to distiguish the limitation.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
F. Willeke, Snowmass Luminosity Limitations of e-p Colliders Extrapolation from HERA Experience Examples for IR Layout LINAC-Ring Limitations HERA.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
Beam-beam Simulation at eRHIC Yue Hao Collider-Accelerator Department Brookhaven National Laboratory July 29, 2010 EIC Meeting at The Catholic University.
P OSSIBILITIES FOR MAINTAINING AA AND PP CAPABILITIES IN PARALLEL WITH E RHIC V. Ptitsyn Collider-Accelerator Department BNL RHIC and AGS Users Meeting,
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Experience and Projections for Low-Energy RHIC Operations Todd Satogata, Collider-Accelerator Department June 9, 2006 Motivated by discussions at the “Can.
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
Turnaround time in modern hadron colliders & store-length optimization
eRHIC Design and R&D From RHIC to eRHIC
Beam-beam effects in eRHIC and MeRHIC
Large Booster and Collider Ring
eRHIC with Self-Polarizing Electron Ring
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
LHC (SSC) Byung Yunn CASA.
Why CeC is needed? High luminosity of US future electron-ion collider(EIC) is critical for success of its physics program 2018 NAS Assessment of U.S.-Based.
JLEIC Reaching 140 GeV CM Energy: Concept and Luminosity Estimate
MEIC New Baseline: Luminosity Performance and Upgrade Path
Main Design Parameters RHIC Magnets for MEIC Ion Collider Ring
JLEIC Main Parameters with Strong Electron Cooling
MEIC New Baseline: Part 7
MEIC New Baseline: Performance and Accelerator R&D
HE-JLEIC: Do We Have a Baseline?
Some Thoughts on the JLEIC Ion Injector
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005

Wolfram Fischer 2 Content 1.Machine status, Enhanced Luminosity (2008) 2.Electron Beam Ion Source (EBIS) 3.RHIC II motivation and goals Luminosity Setup-time Energy variation Species

Wolfram Fischer 3 RHIC status

Wolfram Fischer 4 RHIC status Since 2000: 4 ion combinations 7 energies 46% polarization

Wolfram Fischer 5 RHIC status Luminosity increased by 2 orders of magnitude in 4 years.

Wolfram Fischer 6 RHIC – Enhanced Luminosity goals – 2008 For Au-Au, average per store, 4 IRs L = 8  cm -2 s -1 at 100GeV/u For p  -p  average per store, 2 IRs L = 6  cm -2 s -1 at 100GeV L = 1.5  cm -2 s -1 at 250GeV with 70% polarization 4  design 2  achieved 16  design 9  achieved 1  design 1.5  achieved

Wolfram Fischer 7 Enhanced Luminosity Upgrades For all species: Completion of RHIC vacuum upgrade to suppress e-clouds –Warm: installation of NEG coated beam pipes –Cold : additional pumping before cool-down For polarized protons: Full commissioning of AGS cold snake –Leading to 85% spin transmission –At design bunch intensity 2  p

Wolfram Fischer 8 EBIS Electron Beam Ion Source replaces existing 35-year old Tandems (2009) Main advantages: –No Tandem reliability upgrade needed –Simpler operation at reduced costs –Simpler Booster injection (fewer turns at higher energy) –Faster species switching (d-Au in sec instead of 5min) –New species: U, 3 He 

Wolfram Fischer 9 EBIS Tandem-to-Booster: 840m EBIS-to-Booster : 30m Tandem EBIS J. Alessi

Wolfram Fischer 10 RHIC II – Motivation Debunching requires continuous abort gap cleaning Luminosity lifetime requires frequent refills Ultimately need cooling at full energy Intensities Luminosities   2.5h 0.5h1.5h Beam and luminosity lifetime for Au – Au dominated by IBS [Factor 10 between Au an p]

Wolfram Fischer 11 RHIC II – electron cooling at store Possible layout in RHIC (magnetized) Superconducting gun Challenge: electron cooling time   7/2 (magnetized) or   2 (un-magnetized) [1 st cooling in a collider – high brightness, high power ERL] Need : 54 MeV, mA (= 5-10 MW) Existing: 88 MeV, 9 mA ( Jefferson Lab ERL for IR FEL) MW e-beam

Wolfram Fischer 12 RHIC II – luminosity evolution Transverse beam profile during store Also may be able to pre-cool polarized protons at injection energy with e-cooling without e-cooling Luminosity leveling through continuously adjusted cooling Store length limited to 4 hours by “burn-off” Four IRs with two at high luminosity 2 mm 5 hours

Wolfram Fischer 13 Gold collisions (100 GeV/n  100 GeV/n): w/o e-coolingwith e-cooling Emittance (95%)  m15   10 Beta function at IR [m] Number of bunches Bunch population [10 9 ]11  0.3 Beam-beam parameter per IR Peak luminosity [10 26 cm -2 s -1 ]3290 Ave. store luminosity [10 26 cm -2 s -1 ]870 Polarized proton collision (250 GeV  250 GeV): Emittance (95%)  m2012 Beta function at IR [m] Number of bunches Bunch population [10 11 ]22 Beam-beam parameter per IR Ave. store luminosity [10 30 cm -2 s -1 ] RHIC II Luminosities with Electron Cooling

Wolfram Fischer 14 Maximum luminosity estimates: p-p, Au-Au, U-U

Wolfram Fischer 15 Maximum luminosity estimates: Si-Si, Cu-Cu, d-Au, p-Au

Wolfram Fischer 16 Setup times for different modes Achieved initial ion setup in 2.5 weeks  may reach weeks (excluding major downtime) Achieved reduction in energy in 2-3 days  may reach 1 day (excluding major downtime) Achieved polarized pp setup in 3 weeks  may reach 1-2 weeks (excluding major downtime) Achieved ramp-up to maximum luminosity in physics in 4-5 weeks  some improvement possible

Wolfram Fischer 17 Asymmetric collisions For p-Au collisions need to move DX magnets, not necessary for d-Au collisions Need to have same revolution frequencies (  ) for both beams injection/ramp: no modulated beam-beam (problem for LHC, although smaller bunch intensity) store : maintains luminosity and vertex 250GeV p on 100GeV/n Au: not possible equal f rev not possible, expect luminosity reduction of at least 1000  Can possibly collide 120GeV p on 100GeV/n Au expect considerable operational difficulties

Wolfram Fischer 18 Luminosity at different energies – ions L   2 for  s  200 GeV/n without cooling [projections document] –  from energy dependent beam size –  from from aperture limited in triplets Light ions at low energies can be cooled. Gain over above scaling depends on species, energy, and probably running time per mode. No operation possible near transition.

Wolfram Fischer 19 Luminosity at different energies – polarized protons L   2 for  s  500 GeV [  *=0.5m at  s = 500 GeV] –  from energy dependent beam size –  from from aperture limited in triplets 2% for  s = 63GeV (  *=3.5m)

Wolfram Fischer 20 Luminosities at different energies – above current maximum Dipoles have margin of up to 30% (may be only 20%)  Operation may be possible up to  s = 650 GeV Most of magnets (quadrupoles, snakes, …) also have margin DX magnets don’t have margin –1.3 mrad crossing angle with current strength –18 mrad crossing angle without DX Luminosity close to luminosity for  s = 500 GeV (gain 30% with  increase, loose about same amount with small crossing angle) [W.W. MacKay et al., “Feasibility of increasing the energy of RHIC”, PAC 2001]

Wolfram Fischer 21 Luminosity at different energies – below current minimum No hard limit down to 2.3GeV/n  100A in main dipoles – inject now at 472A Luminosity will deteriorate faster than  2  increased effects of IBS, space charge, persistent current magnetic field errors (not measured), instabilities 15% below current injection , no rf matching  bunch length will increase stronger than with  -scaling Cooling potentially very effective (low  )  Not yet included in current electron and stochastic cooling plans, needs study Need to test AGS extraction/RHIC injection at reduced energy

Wolfram Fischer 22 RHIC II pp luminosities with electron cooling pp luminosity limited by beam-beam effect  Cannot exceed certain brightness N b /  N Cooling at store not effective (cooling time  Z 2 /A)  Pre-cooling at injection to increase brightness Expect only small improvements in polarization after AGS cold snake fully operational  70%+ average polarization at store

Wolfram Fischer 23 Polarized species other then protons (with EBIS options) Polarized d + –Would need new RFQ or source (~$0.5m) –Intensity: 1  /bunch –Polarization: needs study, longitudinal difficult –Luminosity scale factor: 0.5  L pp Polarized 3 He 2+ –Intensity: up to 2  /bunch –Polarization: ~ 15% < than p –Luminosity scale factor: 1  L pp

Wolfram Fischer 24 RHIC II – technically constrained timeline Establish feasibility: early 2006 Start construction: 2009 Begin commissioning: 2012 Based on simulations and assessment of critical component parameters (SC gun, SC ERL)

Wolfram Fischer 25 Summary RHIC II Main technology for RHIC II: electron cooling  could be commission by 2012 (technically constrained) Expected luminosity increase (over Enhanced Luminosity) –10  for Au-Au –2-3  for polarized protons Expect small improvements in polarization, and setup time With EBIS can have beams of U 92+, polarized 3 He 2+ and possibly polarized d + (difficult) Collision energy range can be somewhat extended (upwards by ~30%, downwards by ~50%)