VTX Half LAYER 4 LAYER 3 LAYER 1 LAYER 2 EACH LAYER’S BARRELL MOUNT NEEDS TO BE REFERENCED TO KINEMATIC MOUNTS AND IT’S MOUNTED LADDERS.

Slides:



Advertisements
Similar presentations
Kevin Coke ID#: Rochede Sibblies ID#: Sandrene Haughton ID#:
Advertisements

1 RF Workshop 16 th & 17 th April 2012 Design Layout Alan Grant, STFC.
STAR Detector Main Support System1 Lateral Tracking of the STAR Detector during Translation. November 23, 2005 Ralph L. Brown STAR Operations Group.
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
Fixturing operations for PXL 1 models: MSC.SLDASM MSC_fixtured.SLDASM rail_test_system.SLDASM 2/24/2010.
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
Naming Convention HFT PIXEL 12-June pixel identification sector – ladder – chip - row - column 1-10in out1 out2 out Alternative.
MICE Alignment and Support Structure Tony Jones and Yury Ivanyushenkov Engineering Department RAL.
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
What is an Angle?. Objectives  Know that angles are measured in degrees  That a whole turn is 360º  That half a turn is 180º  Right angle is 90º 
TIPP Conference, June 10, Mechanics and Assembly of the Silicon Vertex Detector for PHENIX Walter Sondheim - LANL Mechanical Project Engineer; VTX.
9/26/ PHENIX WEEKLY PLANNING Sep. 26, 2013 Don Lynch.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
Support and alignment of PXL box with MSC, operation steps
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
ILC Vertex Tracker Ladder Studies At LBNL M Battaglia, D Contarato, L Greiner, D Shuman LBNL, Berkeley.
Robert Pak 1 DOE VTX Review June 2, 2009 Mechanical Integration & Safety Personnel: Walt Sondheim: Mechanical Project Engineer Don Lynch: PHENIX Chief.
PHENIX BNL ReviewFebruary 19 th, MECHANICAL DESIGN AND STUDIES FOR THE FVTX DETECTOR, ALONG WITH ITS INTEGRATION AS A PART OF THE VTX WALTER SONDHEIM,
M. Gilchriese Disk Geometry January 18, M. Gilchriese 2 ATLAS Coordinate System.
Director’s Review Dec 1999 Tracker Integration and Installation W. E. Cooper 6 December 1999.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
PHENIX Run-13 status Hubert van Hecke 1Hubert van Hecke - 05 Feb 13 Time meeting.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
PHENIX BNL ReviewFebruary 19 th, MECHANICAL DESIGN AND STUDIES FOR THE FVTX DETECTOR, ALONG WITH ITS INTEGRATION AS A PART OF THE VTX WALTER SONDHEIM,
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
5/16/ PHENIX WEEKLY PLANNING 5/16/2013 Don Lynch.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
1 HFT Wieman 11/6/ Outline  Development Status uMIMOSTAR pixel detectors uMIMOSA5 Electronic Readout uLadder mechanics uBeam pipe  Interface.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
#2 What we don’t want PV modules in the online system will be roughly 65”X 39” each #4.
PIXEL ladder alignment Hidemitsu ASANO. Photo analysis & survey beam data (with zero magnetic field) ① SVX standalone tracking Global Tracking Strategy.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Preliminary PXL support models with assembly fixtures.
Si Sensors for Additional Tracker
ATLAS pixel module assembly flow
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
What is Stave Carrier Frame Required to Do?
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Pixel Status Mar 12nd 2012 Maki KUROSAWA RBRC.
Radiation Laboratory Meeting
FNAL Production Experience
Maki KUROSAWA VTX Group 2014 Feb 20
Preliminary PXL support models with assembly fixtures
Additional Upstream Coil Shielding
BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.
VTX readiness for RUN15 Y. Akiba.
Schedule after Shutdown
Unit 1: Vocabulary Notes
Site and Context. Section from East Section E2 Section E1 Sannidhanam Malikapuram Sannidhanam Malikapuram.
Presentation transcript:

VTX Half LAYER 4 LAYER 3 LAYER 1 LAYER 2 EACH LAYER’S BARRELL MOUNT NEEDS TO BE REFERENCED TO KINEMATIC MOUNTS AND IT’S MOUNTED LADDERS

BARREL SECTION FACE SKIN INSTALLED NEED TO FIND A SURVEY POINT ON EACH BARRELL MOUNT THAT IS VISIBLE WITH FACE SKIN INSTALLED

Layer 1 Removal from Assembly Fixture LAYER 1 LADDER’S CHIPS SHOULD BE SURVEYED TO THEIR BARRELL MOUNTS IN THE ASSEMBLY FIXTURE CHIPS BARREL MOUNT

Pixel Ladder Assembly CHIPS TO BE SURVEYED

Pixel Ladder Assembly Close-up CHIPS

Layer 1 EDGE VIEW SURVEY SMALL CHIPS ON LADDER

Layer 2 Assembly Fixture LAYER 2 CHIPS SURVEYED TO BARRELL MOUNT’S PINS IN ASSEMBLY FIXTURE MOUNT PINS

Layer 2 EDGE VIEW PIN

Layer 1 & 2 Mated

Layer 1&2 Joined

Layer 3

EDGE VIEW

Layer 4

EDGE VIEW

VTX Installed on Rails (Final Survey position in Chemistry?) EACH KINEMATIC MOUNT SHOULD HAVE A SURVEY TARGET

2 Survey telescopes to be mounted on a 6 inch channel which spans between the north east and south east lead absorbers. Angled brackets to mount the channel horizontally will be needed. With a telescope at both ends of the channel and 2 more on the IR base rails will allow the surveyors to get an accurate survey and alignment of the 2 detector ½’s