David Foster, CERN LHC T0-T1 Meeting, Seattle, November 2005 14 November Meeting David Foster SEATTLE.

Slides:



Advertisements
Similar presentations
T1-NREN Luca dell’Agnello CCR, 21-Ottobre The problem Computing for LHC experiments –Multi tier model (MONARC) –LHC computing based on grid –Experiment.
Advertisements

FNAL Site Perspective on LHCOPN & LHCONE Future Directions Phil DeMar (FNAL) February 10, 2014.
Architecture Decision Group Group Organization & Processes April 7, 2015 | Tuesday.
INFSO-RI Enabling Grids for E-sciencE Update on LCG/EGEE Security Policy and Procedures David Kelsey, CCLRC/RAL, UK
Password?. Project CLASP: Common Login and Access rights across Services Plan
LHC high-level network architecture Erik-Jan Bos Director of Network Services SURFnet, The Netherlands T0/T1 network meeting NIKHEF/SARA, Amsterdam, The.
Questionaire answers D. Petravick P. Demar FNAL. 7/14/05 DLP -- GDB2 FNAL/T1 issues In interpreting the T0/T1 document how do the T1s foresee to connect.
Connect. Communicate. Collaborate Place your organisation logo in this area End-to-End Coordination Unit Toby Rodwell, Network Engineer, DANTE TNLC, 28.
Workshop, Lisbon, August Panel discussion about networking architecture issues
UK-T1-RAL LHCONE Workshop Robin Tasker 10 February 2014.
EGEE ARM-2 – 5 Oct LCG Security Coordination Ian Neilson LCG Security Officer Grid Deployment Group CERN.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
T0/T1 network meeting July 19, 2005 CERN
Connect communicate collaborate perfSONAR MDM updates: New interface, new weathermap, towards a complete interoperability Domenico Vicinanza perfSONAR.
Using E2E technology for LHC Apr 3, 2006 HEPiX Spring Meeting 2006
JSPG: User-level Accounting Data Policy David Kelsey, CCLRC/RAL, UK LCG GDB Meeting, Rome, 5 April 2006.
EGEE is a project funded by the European Union under contract IST Plan for ROC verification Hélène Cordier - Alistair Mills IN2P3, CRNS, France.
Using the CMMI in small Organisations Stephen Fletcher PAS Ltd, UK.
INFSO-RI Enabling Grids for E-sciencE EGEE 1 st EU Review – 9 th to 11 th February 2005 CERN.
LHC Open Network Environment LHCONE David Foster CERN IT LCG OB 30th September
1 LHC-OPN 2008, Madrid, th March. Bruno Hoeft, Aurelie Reymund GridKa – DE-KIT procedurs Bruno Hoeft LHC-OPN Meeting 10. –
Steve Traylen PPD Rutherford Lab Grid Operations PPD Christmas Lectures Steve Traylen RAL Tier1 Grid Deployment
LHCOPN operational working group Guillaume Cessieux (CNRS/FR-CCIN2P3 – EGEE SA2) third meeting CERN – December th, 2008
© 2009 Cisco Systems, Inc. All rights reserved. ROUTE v1.0—1-1 Planning Routing Services Creating an Implementation Plan and Documenting the Implementation.
NCRG Network Complexity Research Group Chairs: Michael Behringer, David Meyer 4 Mar 2014, London
Connect. Communicate. Collaborate perfSONAR MDM Service for LHC OPN Loukik Kudarimoti DANTE.
LHCOPN operational working group report Guillaume Cessieux (FR-CCIN2P3 / EGEE-SA2) on behalf of the Ops WG LHCOPN meeting, , Copenhagen.
LCG/EGEE Security Operations HEPiX, Fall 2004 BNL, 22 October 2004 David Kelsey CCLRC/RAL, UK
Network to and at CERN Getting ready for LHC networking Jean-Michel Jouanigot and Paolo Moroni CERN/IT/CS.
From the Transatlantic Networking Workshop to the DAM Jamboree to the LHCOPN Meeting (Geneva-Amsterdam-Barcelona) David Foster CERN-IT.
9-Oct-03D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security (Report from the LCG Security Group) FNAL 9 October 2003 David Kelsey CCLRC/RAL, UK
NORDUnet Nordic Infrastructure for Research & Education Workshop Introduction - Finding the Match Lars Fischer LHCONE Workshop CERN, December 2012.
TDRp Implementation Challenges David Vance, Executive Director Peggy Parskey, Assistant Director October 23, 2014.
Development of System Operation Network Codes ACER Workshop 24 August 2011 Ole Jan Olesen, Convenor ENTSO-E Working Group on European Operational Standards.
David Foster, CERN LHC T0-T1 Meeting, Geneva, June 2008 Logistics Dinner tonight in Rest-1, in the part of the restaurant nearest where we are now.
David Foster LCG Project 12-March-02 Fabric Automation The Challenge of LHC Scale Fabrics LHC Computing Grid Workshop David Foster 12 th March 2002.
9 th November 2005David Foster CERN IT-CS 1 LHCC Review WAN Status David Foster Networks and Communications Systems Group Leader.
U.S. ATLAS Tier 1 Networking Bruce G. Gibbard LCG T0/1 Network Meeting CERN 19 July 2005.
EGEE ARM-2 – 5 Oct LCG/EGEE Security Coordination Ian Neilson Grid Deployment Group CERN.
Charaka Palansuriya EPCC, The University of Edinburgh An Alarms Service for Federated Networks Charaka.
Planning for LCG Emergencies HEPiX, Fall 2005 SLAC, 13 October 2005 David Kelsey CCLRC/RAL, UK
LHCOPN operational model - 4 use-cases Guillaume Cessieux (FR-CCIN2P3 / EGEE networking support) on behalf of the Ops WG LHCOPN meeting, , Berlin.
INFSO-RI Enabling Grids for E-sciencE Fabric and Management WG Davide Salomoni NIKHEF Lyon, ARM-3 –
David Foster, CERN GDB Meeting April 2008 GDB Meeting April 2008 LHCOPN Status and Plans A lot more detail at:
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN Operational model: Roles and functions.
LCG Pilot Jobs + glexec John Gordon, STFC-RAL GDB 7 December 2007.
Connect communicate collaborate GÉANT Making the Difference Dai Davies, DANTE 8 th eConcertation Meeting CERN, Geneva 4-5 November 2010.
From the Transatlantic Networking Workshop to the DAM Jamboree David Foster CERN-IT.
LHC-OPN operations Roberto Sabatino LHC T0/T1 networking meeting Amsterdam, 31 January 2006.
LHCOPN operational model Guillaume Cessieux (CNRS/FR-CCIN2P3, EGEE SA2) On behalf of the LHCOPN Ops WG GDB CERN – November 12 th, 2008.
David Foster, CERN LHC T0-T1 Meeting, Cambridge, January 2007 LHCOPN Meeting January 2007 Many thanks to DANTE for hosting the meeting!! Thanks to everyone.
Javier Orellana EGEE-JRA4 Coordinator CERN March 2004 EGEE is proposed as a project funded by the European Union under contract IST Network.
LHC high-level network architecture Erik-Jan Bos Director of Network Services SURFnet, The Netherlands T0/T1 network meeting CERN, Geneva, Switzerland;
Connect. Communicate. Collaborate Place your organisation logo in this area End-to-End Coordination Unit Marian Garcia, Operations Manager, DANTE LHC Meeting,
17 September 2004David Foster CERN IT-CS 1 Network Planning September 2004 David Foster Networks and Communications Systems Group Leader
CERN IT Department CH-1211 Genève 23 Switzerland t DPM status and plans David Smith CERN, IT-DM-SGT Pre-GDB, Grid Storage Services 11 November.
Testing and Release Procedures/Tools Cristina Aiftimiei (INFN-CNAF) Mario David (LIP)
Ian Bird, CERN WLCG Project Leader Amsterdam, 24 th January 2012.
LHCOPN operational handbook Documenting processes & procedures Presented by Guillaume Cessieux (CNRS/IN2P3-CC) on behalf of CERN & EGEE-SA2 LHCOPN meeting,
T0-T1 Networking Meeting 16th June Meeting
Bob Jones EGEE Technical Director
David Kelsey CCLRC/RAL, UK
Organisational perspectives from a higher education institute and challenges of assessing UN activities at the community level Dzulkifli.
SA1 Execution Plan Status and Issues
LCG/EGEE Incident Response Planning
The CCIN2P3 and its role in EGEE/LCG
CERN Windows Roadmap Tim Bell 8th June 2011.
Thanks to everyone for attending!!
Arc Standing Committee
HEP System Managers Meeting, UCL.
Presentation transcript:

David Foster, CERN LHC T0-T1 Meeting, Seattle, November November Meeting David Foster SEATTLE

David Foster, CERN LHC T0-T1 Meeting, Seattle, November 2005 Scope for new attendees The “simplest” part of LHC networking is getting the data from CERN to the Tier-1 centers. It involves however, a number of stakeholders, initiatives and infrastructures. We want to understand how this part should be handled from a production network perspective. But this is only one part of the overall problem and we don’t deal with T1-T2 production networking issues …. Yet.

David Foster, CERN LHC T0-T1 Meeting, Seattle, November 2005 Current State We have had a number of meetings and agreed on an overall approach with many open questions. –Some results have been published –And we have a wiki site for gathering operational information. As we move more and more towards providing an production infrastructure needed for service challenges in 2006, many basic issues still remain. The purpose of todays meeting is to review what has been done since the last meeting and decide what remains to be done

David Foster, CERN LHC T0-T1 Meeting, Seattle, November 2005 Last Meeting Summary T0/T1 Top Items Version 2 of the document. (DF) –Complete some details and word for increased clarity in scope. Where do we go from here? 1.Security (Led by: UK – Robin Tasker) What should be done? Agree a plan for ACL/Firewall protection. 2.OPN IP Network Design (Led by: CERN Edoardo Martelli) Agree an IP design and routing based on a specific topology. –Backup routes. 3.Monitoring (Led by: US-LHCNet ….. Shawn Mckee …..) Definition of what is needed, metrics and techniques –Agree a framework and agree a design based on detailed hardware infrastructure understanding and monitoring technology. 4.Network Operations (Led by: DANTE Roberto Sabatino) Agree a process for problem determination and resolution. –Pilot –LCG/EGEE GOC, ROC, CIC interface, T1 interface –Organise a small number of multiple noc’s –Organise Border equipment to the OPN Mailing lists by Aug 20th First draft reports by November.