Possible solutions for the e- cloud problem – SPS upgrade meeting - Frank Zimmermann, 21 March possible solutions for the electron-cloud problem  suppress.

Slides:



Advertisements
Similar presentations
March 22, 2011 Mauro Pivi SLAC ALCPG11 Eugene Oregon March 19-23, 2011 Working Group plans.
Advertisements

Study of a Clearing Electrode at KEKB - First beam test - Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2008/3/3-61TLC08 Sendai.
9-12 April 2007 International Linear Collider DR electron cloud R&D effort: Clearing electrode and triangular fin M. Pivi T. Raubenheimer, J. Seeman, T.
KEK Recent results of beam tests on clearing electrode and grooves 2010/1/191ILC DR WebEx Meeting Y. Suetsugu, KEK.
Summary of the two-stream instability session G. Rumolo, R. Cimino Based on input from the presentations of G. Iadarola, H. Bartosik, R. Nagaoka, N. Wang,
Quick Review of Secondary Electron Yield Studies to Mitigate Electron Cloud Effect in Accelerator F. Le Pimpec (PSI) R. Kirby, F. King, M. Pivi (SLAC)
2006/09/25-28 ILCDR06, Cornell University 1 Experimental Study on Suppression of Electron Cloud Effect at the KEKB Positron Ring Contents Introduction.
1 Summary: Measurements of Electron Cloud Effects K. Harkay ECLOUD07, Daegu, Korea, Apr 2007.
Latest ILC DR wiggler simulations M. Pivi, T. Raubenheimer, L. Wang (SLAC) July, 2005.
Review of 2011 studies and priorities for 2012 LIU-SPS-BD.
1 Electron Cloud in LHC V. Baglin CERN AT-VAC, Geneva 1. Mecanism and Recipies 2. LHC Vacuum Chambers 3. Diagnostics 4. Conclusions Vincent Baglin Electron.
LHeC Experimental Beam Pipe
Sep 29 – Oct 3, 2009 LCWA 09 Linear Collider Workshop of the Americas Sept 29 – Oct 4, 2009 Damping Ring R&D updates SLAC Mauro Pivi SLAC Allison Fero.
Electron Clouds at SLAC Johnny Ng ILC Damping Rings Collaboration Meeting March 4, 2009.
Electron Cloud Studies for Tevatron and Main Injector Xiaolong Zhang AD/Tevatron, Fermilab.
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
ILC damping ring Workshop, Dec 19, 2007, KEK, L. WANG Ecloud simulation 2007 ILC Damping Rings Mini-Workshop December, 2007 Lanfa Wang, SLAC.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
Paris 5 September 2005 HHH Status progress W. Scandale CERN Accelerator Technology Department CARE-HHH Network: coordinators: F. Ruggiero and W. Scandale.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Electron cloud in the wigglers of ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University.
Clearing electrodes: Past experience, technological aspects and potential Tom Kroyer, Edgar Mahner, Fritz Caspers, CERN Beam’07, October
CesrTA EC Build-Up and Mitigation Program - Introduction Mark Palmer June 25, 2009.
LIU-SPS ZS Electrostatic Septum Upgrade Review held on M.J. Barnes & T. Kramer.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
October 13,2010 WG Meeting Cornell U. Recommendation for Electron Cloud Mitigations in the ILC Damping Ring ILC DR Working Group October 13, 2010 Cornell.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
G. Rumolo, F. Zimmermann, Cornell Workshop LC e-Cloud Activities at CERN G. Rumolo, F. Zimmermann WP e-cloud task contacts: F. Zimmermann, CERN;
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill.
Requirements and options for PS2 vacuum system E. Mahner * thanks to W. Bartmann, M. Benedikt, S. Calatroni, P. Chiggiato, P. Cruikshank J.M. Jimenez,
CesrTA Vacuum System Conversion and Operational Experiences Yulin Li for the CesrTA Team Cornell Laboratory for Accelerator-based ScienceS and Education.
ECLOUD04, Panel Discussion, April 2004F. Zimmermann Panel Discussion future machines: higher intensity shorter bunch spacings and/or higher charge per.
High Energy High Intensity Hadron Beams
Electron Cloud Studies Theo Demma INFN-LNF Frascati.
ILC GDE - ILCDR08 Cornell 8-11 July 2008 Electron Cloud Mitigation R&D at SLAC M. Pivi, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, J. Seeman,
Electron Cloud R&D at SLAC Johnny Ng SLAC DOE HEP Review July 7 – 9, 2008.
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
1 st March 2007 A.Poncet CERN ECL2 workshop CERN AA and EPA clearing systems 1 Experience with ion and dust clearing in CERN AA and EPA -CERN antiproton.
Comparison of stainless steel and enamel clearing electrodes E. Mahner, F. Caspers, T. Kroyer Acknowledgements to G. Arduini, H. Damerau, S. Hancock, B.
EuCARD-AccNet CERN-GSI Workshop on Modeling Electron-Cloud Effects welcome! CERN, Geneva, 7-8 March 2011, BE Auditorium Meyrin
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008) First Intnl. Teleconference Ecloud, Impedance/Instabilities - M. Pivi, SLAC 31 October.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
Recent ECLOUD07 Workshop in Daegu, S. Korea (~50 participants) –Highlights: Measurements of the surface Secondary Electron Yield (SEY) of samples inserted.
Electron Cloud Studies at DAFNE Theo Demma INFN-LNF Frascati.
Benchmarking simulations and observations at the LHC Octavio Domínguez Acknowledgments: G. Arduini, G. Bregliozzi, E. Métral, G. Rumolo, D. Schulte and.
2007/03/1-2 ECL2, CERN 1 SEY and Clearing Studies at KEKB Contents Contents Introduction Studies Beam duct with Ante-chambers Coatings with Low SEY Clearing.
Two-Stream Phenomena in CLIC G. Rumolo and D. Schulte for the ACE, 3 September 2008 * thanks to W. Bruns, R. Tomás, SPSU Working Team General introduction.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
Electron Cloud Studies at DAFNE Theo Demma INFN-LNF Frascati.
49th ICFA Advanced Beam Dynamics Workshop. October 8–12, 2010 LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with.
PEP-II test chambers installation
International Linear Collider R&D on electron cloud (SLAC)
Groove Mitigation and Plans
Study of the Heat Load in the LHC
CesrTA Status Report Mark Palmer July 8, 2009.
remarks & workshop organization
Why Study Electron Clouds? Methods and Tools to Study Electron Clouds
Study of the Heat Load in the LHC
Electron Clouds at SLAC
CINVESTAV – Campus Mérida Electron Cloud Effects in the LHC
Status of CTC activities for the Damping rings
EIC Collaborations EIC Collaboration Workshop, JLAB Oct 28-Nov 1st
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Ion Issues Goal: define R&D plan producing a viable specification of machine settings within the next 2 (3?) years. Modeling / Simulations Experiments.
Presentation transcript:

possible solutions for the e- cloud problem – SPS upgrade meeting - Frank Zimmermann, 21 March possible solutions for the electron-cloud problem  suppress e- build up reduce e- yield change e- dynamics change beam parameters  stabilize the beam feedback change beam parameters Joint CARE-HHH-APD, CARE-ELAN and EUROTEV-WP3 mini-Workshop on Electron Cloud Clearing Electron Cloud Effects and Technological Consequences, CERN, March 1-2, 2007CARE-HHHCARE-ELANEUROTEV ep feedback MINI-workshop (March 13 to March 15, 2007) at Bloomington Indiana

possible solutions for the e- cloud problem – SPS upgrade meeting - Frank Zimmermann, 21 March ECL2 workshop structure tour of NEG facility morning overview & simulations technological solutions I afternoon technological solutions II simulation codes + analysis morning beam measurements I beam measurements II afternoon impedance issues studies, designs, & plans

possible solutions for the e- cloud problem – SPS upgrade meeting - Frank Zimmermann, 21 March ECL2 highlight: visit of NEG facility

possible solutions for the e- cloud problem – SPS upgrade meeting - Frank Zimmermann, 21 March ECL2 highlight: dinner with enamel experts

possible solutions for the e- cloud problem – SPS upgrade meeting - Frank Zimmermann, 21 March ECL2 highlight: 1 st presentation of prototype enamel chamber

possible solutions for the e- cloud problem – SPS upgrade meeting - Frank Zimmermann, 21 March ranking of solutions modeling prototypes beam experiments suppression efficiency impedance vacuum issues implications & cost

possible solutions for the e- cloud problem – SPS upgrade meeting - Frank Zimmermann, 21 March NEG coating NEG on Al surface

possible solutions for the e- cloud problem – SPS upgrade meeting - Frank Zimmermann, 21 March grooves (M. Pivi et al, SLAC)

possible solutions for the e- cloud problem – SPS upgrade meeting - Frank Zimmermann, 21 March conventional clearing electrode (DAFNE) - now removed from the ring

possible solutions for the e- cloud problem – SPS upgrade meeting - Frank Zimmermann, 21 March e- cloud killer prototyped by Texas A&M NEG-coated 100-  m copper-foil electrode with 100-V bias voltage

possible solutions for the e- cloud problem – SPS upgrade meeting - Frank Zimmermann, 21 March double enamel coating – the new e- cloud killer (F. Caspers, F.-J. Behler, P. Hellmold, J. Wendel)

possible solutions for the e- cloud problem – SPS upgrade meeting - Frank Zimmermann, 21 March “slotted” surface standard chamber “slotted” chamber W. Bruns

possible solutions for the e- cloud problem – SPS upgrade meeting - Frank Zimmermann, 21 March electretes another interesting solution proposed by Fritz during the workshop permanently charged material, e.g. teflon subjected to e- bombardment during production (used e.g. for microphones & air filters) either permanent electric field sustained over several years, or self-charged by the beam field may allow for in-situ upgrade of LHC and SPS

possible solutions for the e- cloud problem – SPS upgrade meeting - Frank Zimmermann, 21 March pros and cons – electrodes vs NEG clearing electrodeNEG install onceregular activation needed never demonstrated for bunched e-? demonstrated in many machines for ions: shaking + clearing helpful good for vacuum efficient for ISR coasting beam e- long-term stability? impedance?

possible solutions for the e- cloud problem – SPS upgrade meeting - Frank Zimmermann, 21 March possible solutions for PS2 & SPS PS2SPS slotted chamber (Warner) enamel electrodes (Fritz) electrete insert (Fritz) NEG or other coating air baked copper (C.S.) …? NEG, TiN or other coating (Elena S.+Paolo C.) in-situ grooves (Elena) electrete insert (Fritz) air baked copper (C.S.) …?