Impedance Working Group Update ICE meeting June 12 th 2013.

Slides:



Advertisements
Similar presentations
Impedance of the TOTEM Roman Pots Nicola Minafra, Benoit Salvant, Nicolò Biancacci, …
Advertisements

Impedance of new ALICE beam pipe Benoit Salvant, Rainer Wanzenberg and Olga Zagorodnova Acknowledgments: Elias Metral, Nicolas Mounet, Mark Gallilee, Arturo.
Outcome of yesterday’s brainstorming on the potential of using CALIFES or CTF3 electron beam for impedance studies Elias Métral, Benoit Salvant, Carlo.
Introduction Status of SC simulations at CERN
Particle Studio simulations of the resistive wall impedance of copper cylindrical and rectangular beam pipes C. Zannini E. Metral, G. Rumolo, B. Salvant.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
2012 activities of the ICE impedance working group and plans for
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
Acknowledgements F. Caspers, H. Damerau, M. Hourican, S.Gilardoni, M. Giovannozzi, E. Métral, M. Migliorati, B. Salvant Dummy septum impedance measurements.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Agenda: General kickers analysis Wang-Tsutsui method for computing impedances Benchmarks Conclusions Bibliography Acknowledgments: E.Métral, M.Migliorati,
LSWG day: Impedance and beam induced heating Nicolas Mounet *, Daria Atapovych, Nicolò Biancacci, Elias Métral, Tatiana Pieloni, Stefano Redaelli, Benoit.
Status of the PSB impedance model C. Zannini and G. Rumolo Thanks to: E. Benedetto, N. Biancacci, E. Métral, N. Mounet, T. Rijoff, B. Salvant.
Status of the SPS impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, G. Iadarola, E. Métral, N. Mounet, V.G. Vaccaro,
Update of the SPS transverse impedance model Benoit for the impedance team.
Updated status of the PSB impedance model C. Zannini and G. Rumolo Thanks to: E. Benedetto, N. Biancacci, E. Métral, B. Mikulec, N. Mounet, T. Rijoff,
Status of PSB Impedance calculations: Inconel undulated chambers C. Zannini, G. Rumolo, B. Salvant Thanks to: E. Benedetto, J. Borburgh.
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
Update of the SPS transverse impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, F. Caspers, E. Chapochnikova, G.
Update on BGV impedance studies Alexej Grudiev, Berengere Luthi, Benoit Salvant for the impedance team Many thanks to Bernd Dehning, Massimiliano Ferro-Luzzi,
Update on wire scanner impedance studies
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
The Quadrupole Pick-up in the CPS -intro and progress report PPC 3 Dec 1999 A. Jansson.
LTEX report at LMC: Status of impedance studies of the LHC forward detectors planned to be upgraded during LS1 (in particular ALFA and TOTEM) Olav Berrig.
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
11 Update of the SPS impedance model G. Arduini, O. Berrig, F. Caspers, A. Grudiev, E. Métral, G. Rumolo, B. Salvant, E. Shaposhnikova, B. Spataro (INFN),
LIU-SPS ZS Electrostatic Septum Upgrade Review held on M.J. Barnes & T. Kramer.
News and hot topics Impedance meeting 14/04/2014.
Elias Métral, SPSU Study Group and Task Force on SPS Upgrade meeting, 25/03/2010 /311 TMCI Intensity Threshold for LHC Bunch(es) in the SPS u Executive.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
Update on TCTP heating H. Day, B. Salvant Acknowledgments: L. Gentini and the EN-MME team.
Main activities and news from the Impedance working group.
LIU-SPS e-cloud contribution to TDR Electron cloud meeting, 17/02/20141 o First draft by end of February Between 5 to 10 max pages per chapter, refer.
1 Update on the impedance of the SPS kickers E. Métral, G. Rumolo, B. Salvant, C. Zannini SPS impedance meeting - Oct. 16 th 2009 Acknowledgments: F. Caspers,
Proposal to change bunch length during physics fills to assess beam induced heating after LS1 M. Barnes, P. Baudrenghien, A. Burov, S. Claudet, S. Jakobsen,
August 21st 2013 BE-ABP Bérengère Lüthi – Summer Student 2013
Elias Métral, LHC collimation working group meeting, 17/07/061/26 E. Métral for the RLC team LATEST ESTIMATES OF COLLIMATOR IMPEDANCE EFFECTS u Reminder:
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
LIU-SPS Beam Dynamics WG E. Shaposhnikova LIU-SPS coordination meeting
PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
General – mode matching for transverse impedance being compared with CST and infinitely long pipes (Nicolo) – Carlo found a way to disentangle direct space.
Summary of discussion on isolating flanges E. Shaposhnikova With input from LIU-SPS BD WG (in particular H. Bartosik, F. Caspers and J. Varela), K. Cornelis,
Geometric Impedance of LHC Collimators O. Frasciello, S. Tomassini, M. Zobov LNF-INFN Frascati, Italy With contributions and help of N.Mounet (CERN), A.Grudiev.
1 st impedance working group meeting Christine Vollinger, Benoit Salvant Mandate Draft proposal for: Structure Procedures List of members Opening discussion.
RF Dipole HOM Electromagnetic Design
Installation of an Instrument on a CERN machine
Outcome of recent impedance bench measurements on collimators
Working groups status report on Feedbacks
Finemet cavity impedance studies
The TWIICE workshop Benoit for the ABP participants (Andrea, Gianni, Giovanni, Hannes, Lotta, Stefania, Yannis) ABP information meeting March 31st 2016.
Updated status of the PSB impedance model
Follow up on SPS transverse impedance
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
10 MHz amplifier status G. Favia
A. Al-khateeb, O. Chorniy, R. Hasse, V. Kornilov, O. Boine-F
Benchmarking the SPS transverse impedance model: headtail growth rates
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Impedance working group update
News Request to install SLAC collimator in SPS
Impedance working group update 3rd Sept 2013
Agenda Lessons from TU Darmstadt New total wakes with CST 2010
LHC SPS PS Impedance working group update 3rd July 2013 HL-LHC:
Impedance working group update 21st August 2013
Updated status of the PSB impedance model
HBP impedance calculations
Impedance working group update 07th August 2013
Current impedance activities
Current impedance issues
Presentation transcript:

Impedance Working Group Update ICE meeting June 12 th 2013

General: – Andrea Mostacci visiting from La Sapienza for 4 weeks (works on beam screens, TCTP, advice for bench measurements and mode damping in general) – Upgrade of ZBASE from Matlab to Python (Nicolas) – Ongoing: Impedance simulations and calculations at low beta (Carlo and Tatiana) – Ongoing: CST simulations with very short bunches (Eirini) – Ongoing: transverse impedance of insert with mode matching (Nicolo) – Ongoing: mode matching of elliptical steps (Serena) – Ongoing: material measurements (Eirini and Carlo) – Will start soon: set up of new design for bench measurement (V. Vaccaro and INFN) – CST2013 now available (need to install it from DFS/applications, not CMF): very different GUI! PSB – Talk at PSB-LIU  conclusion: no preference from impedance side between corrugated chamber and ceramic chamber (Carlo). – Starting construction of impedance model (Carlo). – Computation of indirect space charge (Carlo with the help of Olav). PS – Long list of elements to be simulated for PS-LIU provided by Simone (started by Mauro) – Design report for PS-LIU: articles on (1) longitudinal impedance by Mauro and (2) transverse impedance by Mauro and Benoit (deadline for mid-August). – PS septum studies by Serena completed

SPS – Problem with the new design of wire scanners – New investigations on the origin and impact of the 1.4GHz mode of the enamel flanges (Jose Varela Campo and LIU-SPS) – Request for computations for new Y chamber for the crab cavity tests in SPS LHC – Studies on impedance of TCP collimators with GdFidL (M. Zobov) – Collimation review (talk by Nicolas): review of post-LS1 impedance collimators – Measurements of new design of ATLAS-ALFA roman pot filler prototype on-going (Olav and Joseph). Request for max 5 micron copper coating. – AFP week with results from Antonello (AFP) and Nicola (TOTEM). – HPS (Hamburg pipe for CMS) review this week, and request for assistance. – On-going investigations for new transverse emittance diagnostics (BGV). – BSRT: new measurements performed but are they sensitive enough? – No specific news for MKI and TDI. – Coating on TCDQ/TCDS evaluated by Nicolas. – Ongoing: action on heating with various types of ferrites for TCTP (Benoit). – UA9: design for goniometer for LHC has been modified several times. EN-STI initiated a collaboration with LAL Orsay for the Cherenkov detector.

HL-LHC – 800 MHz cavities: preliminary impedance evaluation by M. Zobov. – Update on actions and deadlines mentioned by Elias at the beginning of the meeting Other machines/projects – ELENA (Tatiana): First studies for the resistive Wall Ongoing studies for the BPMs Plans: injection and extraction kickers + RF cavities – T-LEP: preliminary impedance model by Nicolas (RF cavities+ RW) – CLIC: ongoing work on damping ring striplines (Eirini) and plans for a profile monitor for the drive beam (Adam Jeff from BI)

What is working well – Very fruitful assistance of the many visitors from other labs. Many thanks! – In order to follow and assist the design of all these items in all machines with the available manpower, we help several equipment groups and experiments perform their own simulations (in particular in BE-BI, EN-STI, TOTEM, ATLAS-AFP). – We are now finally moving to the impedance of PS and PSB! – Gaining a lot of experience in most types of accelerator devices – Still theoretical work ongoing despite all the applied simulations, but it is important to keep a reasonable ratio What is working less well: – Procedures to fully analyze a device are not yet standard, working on it – CST licenses are limited (recently increased from 15 to 20) – Problems to simulate the impact of very short bunches with available codes – Some structures are currently impossible to simulate (too large volumes with too small gaps) – For heating, bench measurements are often not sensitive enough to ensure that there will be no problem in the LHC – Lacking conceptual and practical experience in damping modes with waveguides and couplers. – team and tools not well dimensioned to be in the loop of design iterations – Unrealistic deadlines set by designers to analyze a device, and especially to optimize it if its initial impedance is too high. LS1 much more busy for the impedance team than the run