(ConocoPhillips Company, San Luis Obispo County) Slide 1 Project Location.

Slides:



Advertisements
Similar presentations
Applicants Rob & Judi McCarthy, SLO County Permit #DRC
Advertisements

Fuel Source Storage and Distribution In the Bay Area 03/21/2013 Public Fleet Supervisor’s Association.
Model Home Permitting and Temporary Certificates of Occupancy Orange County BCC January 27, 2015.
f has a saddle point at (1,1) 2.f has a local minimum at.
EXAMPLE 6 Use polynomial models Petroleum Since 1980, the number W (in thousands) of United States wells producing crude oil and the average daily oil.
February 2007 Commercial Vehicle Drivers Hours of Service Module 10: Oil Well Service Vehicle Permits.
Oregon’s Statewide Land Use Planning Program A Framework for Community Decisions Richard Whitman – Director Oregon Department of Land Conservation and.
Board of County Commissioners PUBLIC HEARING January 5, 2010.
September 24,  Preliminary Development Plan  Location: North side of NW 39 th Avenue in the 8300 to 9099 block  Zoning Districts: R1-B, HM, PD,
JUNE 19, 2012 BCC APPEAL HEARING ON BZA #SE , April 5, 2012 APPLICANT/APPELLANT: TONY RAHBANY.
Board of County Commissioners PUBLIC HEARING Lake Avalon Rural Settlement Commercial Design Overlay District March 10, 2009 Board of County Commissioners.
Source: CWS/CMS Business Objects Report Data As Of: 11/30/ San Luis Obispo County Department of Social Services “Change a Lifetime – Create a Lifelong.
Physical Environment 1) In the past three months, how many times have you visited any outdoor recreation locations in San Luis Obispo.
College Now PF Activity Week 9 Juniors. Did you know that you can start taking classes at Hancock now?
Board of County Commissioners PUBLIC HEARING September 1, 2009.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
Public Hearings February 24, Case: LUP Project: Wedgefield K-8 School PD / LUP Applicant: Tyrone Smith, OCPS Planning & Governmental Relations.
Board of County Commissioners PUBLIC HEARING June 9, 2009.
Board of County Commissioners PUBLIC HEARING June 23, 2009.
Chapter 13 Section 2 Solutions of Systems of Equations.
ORANGE COUNTY/ ORLANDO MAGIC RECREATION CENTERS FUNDING, DESIGN AND DEVELOPMENT AGREEMENT November 27, 2007.
31571 Sea Level Drive Keane Guest House Wednesday, August 8, Agenda Item 14a Appeal No. A-4-MAL
Saving the Oceano Dunes – For The Public Permit# Feb 2015 Oceano Dunes SVRA 1 Friends of Oceano Dunes is a 501(c)(3) California Not-for-Profit Public.
Chapter 3 Test Review Algebra II CP Mrs. Mongold.
Harbor Center Project. Condition 1.a Bayside Accessway The entire southern portion of the bayside lateral accessway shall be a minimum of ten feet wide.
I TEM T H 23 A & B – CDP N OS. A-6-OCN & South Pacific Street Oceanside San Diego County C ALIFORNIA C OASTAL C OMMISSION S AN D IEGO.
Board of County Commissioners PUBLIC HEARING April 22, 2008.
I TEM F11 B – A PPEAL N UMBER A-3-MCO Carmel Area Monterey County C ALIFORNIA C OASTAL C OMMISSION C ENTRAL C OAST D ISTRICT S LIDE 1.
C ALIFORNIA C OASTAL C OMMISSION N ORTH C ENTRAL C OAST D ISTRICT S LIDE 1 A PPEAL A-2-HMB Correas Street Half Moon Bay San Mateo County.
CCC Hearing January 7, 2015 Item W33a. Subject Site 2.
1 Regulation of the Water & Environment Portfolio State of affairs, areas of convergence, differences, opportunities, etc.
A-5-LGB (MEEHAN) SUBSTANTIAL ISSUE & DE NOVO ITEM TH12A COASTAL COMMISSION MARCH 2015 HEARING.
Slide 1. Slide 2 ITEM: Th 19a SITE PLAN Copyright (C) Kenneth & Gabrielle Adelman, California Coastal Records Project,
A-4-STB VAN VLIET 1717 FERNALD POINT LANE, MONTECITO SANTA BARBARA COUNTY Item Th20b CCC Hearing April 12, 2012.
Strands End, LLC and Leeds, LLC 817 & 819 South Pacific Street City of Oceanside Appeal Numbers: A-6-OCN & A-6-OCN Items W11a&b Coastal Commission.
Santa Barbara County LCP Amendment 1-09-A and –B Land Use and Development Code (LUDC) & Rezone Th17 b & c.
Item W12a – 12-AFC-03 – Energy Commission Review of Redondo Beach Energy Facility July 8, 2015 Energy & Ocean Resources Division.
C ALIFORNIA C OASTAL C OMMISSION C ENTRAL C OAST D ISTRICT S LIDE 1 I TEM T H 21 A – A PPEAL N UMBER A City of Pismo Beach San Luis Obispo County.
I TEM W27 A – A PPEAL N UMBER A-5-MNB Downtown Manhattan Beach Los Angeles County C ALIFORNIA C OASTAL C OMMISSION S OUTH C OAST D ISTRICT S LIDE.
Consent Cease and Desist Order CCC-13-CD-03 and Restoration Order CCC-13-RO-03 Bacara Resort and Spa 8301 Hollister Avenue Goleta, Santa Barbara County.
City of Grover Beach, San Luis Obispo County 1 Grover Beach.
California Coastal Commission June 11, 2014 Huntington Beach 16e A-3-SLO Tracks Realty Trust 17a A-3-SLO Thomas Kellaway Los Osos Map.
I TEM 23 B – A PPEAL N UMBER A-3-SCO Bonny Doon Santa Cruz County C ALIFORNIA C OASTAL C OMMISSION C ENTRAL C OAST D ISTRICT S LIDE 1.
Environmentally Sensitive Habitat Areas (ESHA) Overview Slide 1.
Reuben E. Lee Restaurant (now removed) Island Prime Restaurant.
Crude Oil Moratorium May 3, 2016 Vancouver City Council Workshop Sandra Towne, Planning Manager Brent Boger, Assistant City Attorney.
LEA EVALUATIONS Evaluation staff assess LEA performance to ensure LEA: 1)Provides consistent enforcement of statute and regulations. 2)Implements its.
Item W16a February 8, 2012 CCC Hearing A-6-OCN (Altman) 1823 South Pacific Street City of Oceanside.
Public Hearing Seattle Ridge Preliminary Plat/ Planned Area Development PP December 18, 2013.
Overview of the Surface Mining and Reclamation Act and Designation Process County of San Luis Obispo Office of the County Counsel January 8, 2015.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
 Connect the Coastside Presentation Half Moon Bay City Council Briefing March 15,
1 Los Angeles County Santa Monica Mountains Local Implementation Plan Malibu Santa Monica Mountains Pepperdine Univ. Topanga County Beach Leo Carrillo.
C ALIFORNIA C OASTAL C OMMISSION S OUTH C ENTRAL C OAST D ISTRICT S LIDE 1 Malibu Lagoon & Surfrider Beach Project Site Malibu Civic Center Malibu Creek.
Slide 1 Insert your own content.. Slide 2 Insert your own content.
1 City of Portland Bureau of Development Services Staff Presentation to the Adjustment Committee Land Use Review LU AD Adjustment.
Washoe County Board of Adjustment June 1, 2017
Limited Service Agreements
Public Access No public access currently available through site due to site constraints, including steep topography.
OIL REFINERY 3D Presentation.
Hurst New Blufftop Home Appeal Substantial Issue
Meardon New Blufftop Home Appeal Substantial Issue
NE Rural Ordinance Survey Results
Slide 1 Insert your own content.. Slide 1 Insert your own content.
Slide 1 Insert your own content.. Slide 1 Insert your own content.
Slide 1 Insert your own content.. Slide 1 Insert your own content.
X y y = x2 - 3x Solutions of y = x2 - 3x y x –1 5 –2 –3 6 y = x2-3x.
Review of Park Facility Uses and Regulations
Washoe County Board of Adjustment
<Author(s) Name and Affiliation>
Presentation transcript:

(ConocoPhillips Company, San Luis Obispo County) Slide 1 Project Location

Project Description Increase the daily maximum crude oil throughput by 10 percent (from 44,500 to 48,950 barrels per day) Provide vertical public access Slide 2 ODSVRA Santa Maria Oil Refinery Access Location

Appellants allege LCP public access inconsistencies, specifically alleging that: 1)A 100-foot wide accessway is more appropriate 2)A 100-foot wide offer of dedication provides more certainty in the Applicant’s obligations 3)The 100-foot wide accessway could accommodate future potential use of the accessway as a formal access and staging area for the Oceano Dunes State Vehicle Recreation Area (ODSVRA) Appeal Contentions Slide 3

Size of the Accessway Section of the LCP requires a minimum 10- foot wide access in rural areas. The size of the accessway is consistent with the LCP.. Slide 4

Applicant’s Obligations The condition requires an offer of dedication be provided prior to issuance of the permit and outlines a time frame for construction and the location of the accessway. There is certainty in the obligations of the applicant consistent with the LCP.. Slide 5

Access to ODSVRA Access issues into ODSVRA are separate and independent of this permit. There is no LCP or Coastal Act policy requiring this link. There is no LCP inconsistency. Slide 6

Staff Recommendation No Substantial Issue Slide 7