Projects, Tools and Engineering Patricia McBride Computing Division Fermilab March 17, 2004.

Slides:



Advertisements
Similar presentations
Configuration management
Advertisements

Software change management
Configuration management
DSG Database Administration Projects Presentation July 09, 2003 CD Projects Status Meeting.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
Simulation Project Major achievements (past 6 months 2007)
Auger Project Management H. Glass Director’s Review15-Dec-2011 Fermilab (Technical Division) has hosted Auger Project Management office since collaboration.
Simulation Project Organization update & review of recommendations Gabriele Cosmo, CERN/PH-SFT Application Area Internal.
Tevatron BPM Upgrade Project Manager Overview Stephen Wolbers Tev BPM Technology Choice Review December 16, 2003.
Configuration Management Process and Environment MACS Review 1 February 5th, 2010 Roland Moser PR a-RMO, February 5 th, 2010 R. Moser 1 R. Gutleber.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
F Run II Experiments and the Grid Amber Boehnlein Fermilab September 16, 2005.
Hall D Online Data Acquisition CEBAF provides us with a tremendous scientific opportunity for understanding one of the fundamental forces of nature. 75.
JCE A Java-based Commissioning Environment tool Hiroyuki Sako, JAEA Hiroshi Ikeda, Visible Information Center Inc. SAD Workshop.
1 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Plans F. Willeke 9 th ASAC Meeting for NSLS-II Project February 1-2, 2012.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
PCGRID ‘08 Workshop, Miami, FL April 18, 2008 Preston Smith Implementing an Industrial-Strength Academic Cyberinfrastructure at Purdue University.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
Creator: ACSession No: 16 Slide No: 1Reviewer: SS CSE300Advanced Software EngineeringFebruary 2006 (Software Quality) Configuration Management CSE300 Advanced.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
LIANZA Sept Getting it together for libraries : Designing a collaborative learning centre Karen Kealy, Manager, Planning and Projects Information.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
08/30/05GDM Project Presentation Lower Storage Summary of activity on 8/30/2005.
Run II PMG 2/16/06 Martens/Sims 1 Run II Upgrades Status February 2006.
Figure 2 gives an overview of the hardware components of the upgraded Main Injector BPM system. The figure shows 2 signal channels which produce one position.
Workshop on Computing for Neutrino Experiments - Summary April 24, 2009 Lee Lueking, Heidi Schellman NOvA Collaboration Meeting.
Elizabeth Gallas August 9, 2005 CD Support for D0 Database Projects 1 Elizabeth Gallas Fermilab Computing Division Fermilab CD Grid and Data Management.
LCG Generator Meeting, December 11 th 2003 Introduction to the LCG Generator Monthly Meeting.
CMS Computing and Core-Software USCMS CB Riverside, May 19, 2001 David Stickland, Princeton University CMS Computing and Core-Software Deputy PM.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
Tevatron BPM Upgrade Stephen Wolbers CD Briefing February 4, 2004.
Firmware - 1 CMS Upgrade Workshop October SLHC CMS Firmware SLHC CMS Firmware Organization, Validation, and Commissioning M. Schulte, University.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
User support and requirements capturing processes Geant4 Collaboration organization, management and communication review November 9 th, 2012 Marc Verderi.
Tevatron BPM Upgrade Stephen Wolbers DOE Review February 25, 2004.
DoE Review January 1998 Online System WBS 1.5  One-page review  Accomplishments  System description  Progress  Status  Goals Outline Stu Fuess.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
Computing R&D and Milestones LHCb Plenary June 18th, 1998 These slides are on WWW at:
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for LSCS-DBI-APP Dennis Box June
JetMET, Feb26 th 2003V. Daniel Elvira Geant4 at Fermilab Geant4 is a toolkit for the simulation of the passage of particles through matter. ( Collaboration.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
1 ILC and Future Programs Stephen Wolbers February 16, 2007.
State of Georgia Release Management Training
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Computing Division FY03 Budget and budget outlook for FY04 + CDF International Finance Committee April 4, 2003 Vicky White Head, Computing Division.
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
Planning/Budget Stephen Wolbers CD All Hands Meeting May 7, 2004.
1 july 99 Minimising RISC  General strategy - converge on PCs with Linux & NT to avoid wasting manpower in support teams and.
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
ALICE RRB-T ALICE Computing – an update F.Carminati 23 October 2001.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
My Jobs at CERN April 2015 My Jobs at CERN2
Follow-up to SFT Review (2009/2010) Priorities and Organization for 2011 and 2012.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
1 What’s Happening on the ILC Controls Front at FNAL Margaret Votava Fermilab January 9th, 2006.
 Accelerator Simulation P. Spentzouris Accelerator activity coordination meeting 03 Aug '04.
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
Control Room Logbook Status September 28, 2007 Suzanne Gysin.
Tevatron BPM Upgrade Project Review Summary Stephen Wolbers December 19, 2003 Tevatron Department Meeting.
1 ALICE Summary LHCC Computing Manpower Review September 3, 2003.
Fermilab Scientific Computing Division Fermi National Accelerator Laboratory, Batavia, Illinois, USA. Off-the-Shelf Hardware and Software DAQ Performance.
Generator Services planning meeting Witek Pokorski
Gene Oleynik, Head of Data Storage and Caching,
Working Group 4 Facilities and Technologies
Tracker Software Status
Presentation transcript:

Projects, Tools and Engineering Patricia McBride Computing Division Fermilab March 17, 2004

P L McBride Operations Review2 Projects, Tools and Engineering There are a number of division activities that are either common to several experiments or require developments that take advantage of specific software or engineering expertise. Stakeholders: Experiments, Accelerator Division, Computing Division Objectives: –Encourage the use of common tools by several experiments – sometimes this is not possible –Development of new techniques Activities: –Development, consulting, support, and distribution of software components –Design, production, and support of electronic components or systems

March 17, 2004P L McBride Operations Review3 CD Project Areas Some examples areas of work: –Core software for experiments: ~ 8 FTEs + exp. departments Framework, Databases, Compilers –Physics Analysis Software ~4 FTEs C++ class libraries, ROOT, Visualization –Online software, Trigger&DAQ ~4 FTEs –Collaboration Tools ~ 1.5 FTEs Electronic logbook –GRID Applications ~3 FTEs (mainly externally funded) –Data Management ~8 FTEs + the FTEs for SAM –Electronics for experiments ~1 FTE Run II and run II upgrades –Accelerator support ~15 FTEs –CD infrastructure ~8 FTEs Effort reporting, equipment support

March 17, 2004P L McBride Operations Review4 Projects on the web

March 17, 2004P L McBride Operations Review5 CD Project monitoring We attempt to capture the development and support activities in the division through project monitoring. Through this process we –define project goals and status, –define beginning and end(!) of projects Status reports –Written by project leaders, posted on web –Meetings to review the status are held periodically Briefings –Meetings to discuss new projects or major changes to projects Project Web pages –available to all –Record of the status and accomplishments for each project

March 17, 2004P L McBride Operations Review6 Support and maintenance We try to concentrate our support efforts on tools and components needed by the ongoing experimental program. –Support for ROOT is one example. Used by almost Run II, Minos, Miniboone, etc. –A core component in many cases FTE for critical ROOT development, user support and distribution –Highly successful effort Support will be required over an extended time. –Active mailing list for questions, issues (3/day on –Meet every 3 months with experiments to set priorities –Also meet annually with the full ROOT team and other users at the annual ROOT workshops Many important products are HEP specific –Share support with other labs and institutes CLHEP, GEANT, GRID –Share the support with the experiments C++ Working Group works this way (KAI to GCC migration) Often this support is done through mailing lists

March 17, 2004P L McBride Operations Review7 Simulation and Modeling Generator support (pythia and others) –Provide support for CDF and D0 (and CMS) –The patriot project provides physics MC data sets that have been “approved” by the experts. This project will use central facilities to produce and store data files. Detector Simulation –GEANT3 – minimal support (0.1 FTE) Used by most experiments at Fermilab Distribute the product through UPS/UPD Provide support through mailing lists –GEANT4 – minimal support (0.3 FTE) Used by CMS (maybe BTeV) Distribute though UPS/UPD upon request Validation studies for CMS using test beam data has been done here. Could do more if more manpower was available and the experiments demanded new features. –Important for LHC and other future experiments. Accelerator Simulations

March 17, 2004P L McBride Operations Review8 Accelerator Support Projects Many small projects in FY03 (3-6 months) –Recycler BPMs, Booster Monitoring, Document Database,… Current involvement FY04 (15 FTEs): –Simulations: Modeling of Space Charge in Booster(SCIDAC) –Shot Data Analysis: Tools and Analysis –Tevatron BPMs –Ionization Profile Monitors –Orbit Smoothing –Magnet Database (BLASTdb) –Support for Labview, VXworks Possible Future projects (under discussion) –Controls system migration to unix (waiting for technical review) –Main Injector and other BPMs –Beam Beam simulations for Tevatron –Infrastructure to make lattice calculations in the control room

March 17, 2004P L McBride Operations Review9 Accelerator Support since July ‘03

March 17, 2004P L McBride Operations Review10 TeV BPM Project Hardware: We are replacing the readout electronics. Echotek boards similar to the boards used for the recycler BPMs will be installed in Tevatron support buildings. Software: front-end, control room applications, “offline” Challenge: to measure antiproton positions in the presence of a large proton signal CD scientist R. Kutschke (assigned to BTeV software) stepped in to solve this critical problem. He should be able to return to BTeV in the summer S. Wolbers – Project Manager B. Webber – Deputy Project Manager J. Steimel – Technical Coordinator B. Banerjee – Project Assistant J. Nicholls – Project Assistant Electronics Vince Pavlicek Front-End/ DAQ Software Margaret Votava Online Software Brain Hendricks Offline Software Rob Kutschke Requirements Mike Martens From AD 3-5 FTE From CD 4-8 FTE Sept 03-Dec 04

March 17, 2004P L McBride Operations Review11 TeV BPM Project Tracking

March 17, 2004P L McBride Operations Review12 Conclusions Large number of active projects in the Computing Division There is always a list of potential projects – important to set priorities. Projects are started/ended after consultation with the experiments or the accelerator division Projects are monitored by division management and reports are available to all.

March 17, 2004P L McBride Operations Review13 Additional Slides

March 17, 2004P L McBride Operations Review14 Status Reports CRL Projects page:

March 17, 2004P L McBride Operations Review15 TeV BPM project Effort Reports:

March 17, 2004P L McBride Operations Review16 TEV BPM status

March 17, 2004P L McBride Operations Review17 BLASTdb project reporting BLASTdb Accelerator Magnet Database Short Description of Project: Create and do early populating and critical applications for a modern and maintainable unifying several sources of magnet and alignment data "owned" by Accelerator and Technical divisions. Milestones agreed on are: 0. Agreement on what we are doing. 1. Creation of good database, meeting agreed key purposes a) Repository for the data previously in N. Gelfand's database b) Adequate scheme for accepting new survey data c) Repository for some part of the "other" data that AD has currently in pseudo- and real databases. Use case applications for populating and simple access. 2. Refinement of that database, for decent performance, completion of schema to include all the critical data categories, and incorporation of all formulas needed for users to convenientlyaccess data in their prefered forms. 3. Incorporation of other data sets for maximal usefulness to AD and TD. Project Status: Ongoing

March 17, 2004P L McBride Operations Review18 Current engineering support projects