PROJECT MANAGEMENT ENCE-7323 TO 763-N CLASS 3 September 17, 2001 Carl E. Edlund 214-665-8124

Slides:



Advertisements
Similar presentations
A Short Course in Project Management
Advertisements

Developing a Project Plan CHAPTER SIX Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Richard Fisher 1 The University of Texas at Dallas Project Management BA 4320 Richard Fisher The University of Texas at Dallas.
PRJ566 Project Planning and Management Lecture: Network Diagrams.
PRJ566 Project Planning and Management Lecture: Dependencies and Network Diagrams.
Work Breakdown Structures
ES=32 EF=34 LS=33 LF=35 ES=10 EF=16 LS=10 LF=16 ES=4+6=10 EF=10 LS=4
Project Management Project  A series of related jobs usually directed toward some major output and requiring a significant time to perform Project management.
CSSE Sep.2008 Constructing and Analyzing the Project Network Diagram Chapter 6.
D1: Critical Events And Critical Paths. D1: Critical Events And Paths A critical path is the list of activities on an activity network that, if they are.
Chapter 4: Schedule, cost, and situation analysis (pt. 1) ISE 443 / ETM 543 Fall 2013.
5/4/20151 NETWORK SCHEDULING TECHNIQUES. 5/4/20152 Network Diagrams  PMI defines the scheduling process as: “the identification of the project objectives.
Construction Planning and Scheduling A G E NG 520 Schedule Computations Part #2 1. Definition and Computation of Total and Free Floats: Total Float : The.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Activity networks – Example 1 TaskDuration (hours)Immediate predecessors A3- B4- C6- D5A E1B F6B G7C, D, E The table below shows the tasks involved in.
1 Operations Management Lesson 5 Project Management.
Basics Of PERT/CPM PERT=Project Evaluation Review Technique CPM = Critical Path Method.
Network planning Learning objectives After these lectures you should be able to: - Produce and analyse activities networks - Calculate earliest and latest.
Project Management (2) Chapter 16, Part 2. EJR 2006 Review of Project Management, Part 1 What is a project? Examples of projects Project performance expectations.
Precedence Network Calculations the basic information that should be calculated in the precedence network are: 1) Early activity start (ES) 2) Early activity.
1 ARCH 435 PROJECT MANAGEMENT Lecture 3: Project Time Planning (Arrow Diagramming Technique) Activity on Arrow (AOA)
Project Scheduling: Networks, Duration estimation, and Critical Path
AMERICAN SPORTS BUILDERS ASSOCIATION CRITICAL PATH METHOD SCHEDULING FOR SUCCESS December 6-8, 2008 New Orleans, Louisiana Presented By: Bill Pronevitch.
Importance of Project Schedules
PROJECT MANAGEMENT ENCE-7323 TO 763-N CLASS 2 September 10, 2000 Carl E. Edlund
Projmgmt-1/14 DePaul University Project Management I - Realistic Scheduling Instructor: David A. Lash.
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Where We Are Now. Where We Are Now Developing the Project Plan The Project Network A flow chart that graphically depicts the sequence, interdependencies,
The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.
HIT241 - TIME MANAGEMENT Introduction
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Project Management Chapter Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame. Build A A.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Project Time Management
1 TCOM 5143 Lecture 11 Project Management. 2 What’s Project Management? Project management involves planning and scheduling the different activities of.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Dr. Hany Abd Elshakour 2/18/ :27 PM 1. Dr. Hany Abd Elshakour 2/18/ :27 PM 2 Time Planning and Control Activity on Arrow (Arrow Diagramming.
Software Project Scheduling By: Sohaib Ejaz Introduction A Gantt chart is a graphical representation of the duration of tasks against the progression.
Project Scheduling. Why Are Projects Late? an unrealistic deadline established by someone outside the software development group changing customer requirements.
Project Management Fundamentals - Planning Tools 1.
Project Planning, Scheduling and Control Planning: –defines objectives, tasks and preceeding relationships; estimates time and resources Scheduling: –identifies.
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
Project Management – PTM721S
Time Planning and Control Time-Scaled Network
PROJECT MANAGEMENT.
ECE362 Principles of Design
Activity networks – Example 1
PERT and CPM.
Project Planning and Scheduling
Chapter 6: Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Activity on Arrow Project Management.
Time Planning and Control Time-Scaled Network
Project Scheduling Basics Activity on Node Precedence Diagrams
Project Management CPM Method Tutorial-p1
BEST VIEWED IN SLIDE SHOW MODE
Lecture 5: Project Time Planning (Precedence Diagramming Technique)
Exercise – A small building.
CHAPTER 6 PROJECT TIME MANAGEMENT
Presentation transcript:

PROJECT MANAGEMENT ENCE-7323 TO 763-N CLASS 3 September 17, 2001 Carl E. Edlund

Project Life Cycle DEFINITION ENLIST SPONSOR NAME STAKEHOLDERS MAKE RULES STATEMENT OF WORK RESPONSIBILITES MATRIX COMMUNICATION PLAN CHARTER

Project Life Cycle PLANNING RISK MANAGEMENT DETAILED SCHEDULING RESOURCE ESTIMATING RISK LOG SCHEDULE BUDGET RESOURCE PLAN

Project Life Cycle CONTROL MEASURE PROGRESS COMMUNICATION CORRECTIVE ACTION PROGRESS REPORTS

Project Life Cycle CLOSEOUT RECONCILE ACCOUNTS LESSONS LEARNED PREPARE FOR NEXT JOB FINAL PRODUCT CUSTOMER ACCEPTS

Project Life Cycle DEFINECLOSECONTROLPLAN FEEDBACK CHANGES CORRECTIONS

Project Life Cycle PLANNING RISK MANAGEMENT DETAILED SCHEDULING RESOURCE ESTIMATING RISK LOG SCHEDULE BUDGET RESOURCE PLAN

EXAMPLE SepOctoberNovember 2001 Task Name PROJECT KICKOFF MEETING PROJECT COORD. & EQUIP. MOB. FIELD WORK LAB TESTING; DATA VALIDITY DATA REVIEW & REPORT PREP. DRAFT REPORT COMPLETION 10

The CPM network has one starting event and one ending event. Each activity is bounded by two events, one at the tail (starting point) and one at the head (ending point). FUNDAMENTALS OF THE CRITICAL PATH METHOD (CPM) 132 MobilizeDrill Borings Activity 2 3 Duration (Days) ij i j Event

VERTICAL & HORIZONTAL NUMBERING VERTICAL HORIZONTAL

Eight Steps to Using CPM to Manage a Project  Identify the activities (tasks) in the project and their durations.  Determine for each activity the logic that governs when it can occur, i.e., what must precede the activity, what can occur at the same time, and what must follow (precedence, concurrence, succession). FUNDAMENTALS OF THE CRITICAL PATH METHOD (CPM)

 Draw a network diagram that reflects the best progression of the project (i.e., order activities in a logical sequence that minimizes project duration). For each activity, place the name of the activity above the arrow and the duration of the activity below the arrow.  Determine the earliest event times (EETs) and latest event times (LETs) for each event in the network diagram. FUNDAMENTALS OF THE CRITICAL PATH METHOD (CPM)

 Determine and highlight the critical path (those critical activities that define the duration of the project). Activities are critical if: –The EET and LET at the tail of the activity are equal. –The EET and LET at the head of the activity are equal. –The difference between the EET (or LET) at the head and the EET (or LET) at the tail equals the activity duration. FUNDAMENTALS OF THE CRITICAL PATH METHOD (CPM)

There will be at least one critical path extending from the beginning to the end of the project.  Tabulate activity times (early start, early finish, late start, late finish, total float, and free float) that can help you schedule resources and identify schedule flexibility. –Early Start (ES) = The EET (entered in the box symbol) at the tail of the activity arrow FUNDAMENTALS OF THE CRITICAL PATH METHOD (CPM)

–Early Finish (EF) = ES + Activity Duration –Late Start (LS) = LF - Activity Duration –Late Finish (LF) = The LET (entered in the triangle symbol) at the head of the activity arrow –Total Float (TF) = LS - ES = LF – EF –Free Float (FF) = EET (at the head) - EF FUNDAMENTALS OF THE CRITICAL PATH METHOD (CPM)

Interfering float (that which delays a subsequent activity, but not the total project) equals TF - FF; for a given activity, it is also equal to the difference between the LET and EET at the head of that activity's arrow.  Schedule activities and allocate resources to maximize efficiencies and minimize project time.  During the project, use the CPM to measure progress; taking action where necessary and modifying the network diagram as needed. FUNDAMENTALS OF THE CRITICAL PATH METHOD (CPM)

SUMMARY OF BENEFITS OF THE CRITICAL PATH METHOD Provides graphic representation of the sequence and interdependency of activities Enables prediction of project duration Highlights critical path activities and project float time Enables detailed planning/scheduling prior to starting the project

Enables tracking of project activities and timely response to changed conditions Can be used for alternatives analysis Aids in estimating/allocating resources and costs and visualizing constraints BENEFITS OF THE CRITICAL PATH METHOD (CPM)