Mar 20, 2005 Trigger Configuration (w/P. Toale, S-H. Seo, D. Swarnkar) D. Seckel, Univ. of Delaware.

Slides:



Advertisements
Similar presentations
GCT Software Jim Brooke GCT ESR, 7 th November 2006.
Advertisements

© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Chapter 8: Monitoring the Network Connecting Networks.
Apache Struts Technology
IceCube Offline Database Overview Georges Kohnen Université de Mons-Hainaut IceCube Workshops Oxford September 23rd, 2005.
ETW Session xPerfView xPerf 2. ETW contains a collection of configurable in-memory buffers 1. Any component that has been instrumented.
IS Terms and Introductory Concepts. Contemplative Questions What is an information system? What is an information system? Why do we care about the difference.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
Trickle Injection Overview Background Injection is necessary to refill beam “buckets” which have lost charge. A particular bucket is targeted for each.
By Asma Khalil.  As now a days world is known as the global village. We can share our ideas through out the world and in this mean computer helps us.
Star (Traditional) Database Tasks & MySQL 1. Database Types & Operation Issues 2. Server & Database deployments 3. Tools with MySQL 4. Data definition.
LIGO-G E ITR 2003 DMT Sub-Project John G. Zweizig LIGO/Caltech Argonne, May 10, 2004.
Lesson 2 Information Processing. Objectives Define hardware and software Explain the three basic computer functions: input, processing, and output.
MB, 9/8/041 Introduction to TDC-II and Address Map Mircea Bogdan (UC)
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Configuration.
Mastering Windows Network Forensics and Investigation Chapter 11: Text-Based Logs.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
July 29, 2004 IceTop DAQ D. Seckel. IceTop Review DAQ July Delaware D. Seckel Outline II = {tasks for InIce DAQ} IT = {tasks for IceTop DAQ} A.
IceCube DAQ Mtg. 10,28-30 IceCube DAQ: “DOM MB to Event Builder”
Greg Sullivan University of Maryland Data Filtering and Software IceCube Collaboration Meeting Monday, March 21, 2005.
Towards Low Overhead Provenance Tracking in Near Real-Time Stream Filtering Nithya N. Vijayakumar, Beth Plale DDE Lab, Indiana University {nvijayak,
G. Maron, Agata Week, Orsay, January Agata DAQ Layout Gaetano Maron INFN – Laboratori Nazionali di Legnaro.
IceCube Data Acquisition :: Status Presentation before the IceCube Science Advisory Committee W. R. Edwards / K. Hanson for DAQ Mar 29, 2006 – Madison,
Erik Blaufuss University of Maryland Data Filtering and Software IceCube Collaboration Meeting Monday, March 21, 2005.
March 02, Shahid Hussain for the ICECUBE collaboration University of Delaware, USA.
Serial Data Link on Advanced TCA Back Plane M. Nomachi and S. Ajimura Osaka University, Japan CAMAC – FASTBUS – VME / Compact PCI What ’ s next?
Aaron Gember, Theophilus Benson, Aditya Akella University of Wisconsin-Madison.
Azriel Goldschmidt AMANDA/IceCube Collaboration Meeting Laguna Beach, CA March 2003 String-18 Progress and Plans.
IceTop DAQ: 1 David Seckel – 8/27/2003, College Park, MD IceTop DAQ David Seckel University of Delaware.
DØ Online16-April-1999S. Fuess Online Computing Status DØ Collaboration Meeting 16-April-1999 Stu Fuess.
October 2002 Jean Slaughter SDA – Shot Data Analysis Outline Description of SDA Examples Plans for 2003 SDA is a system for acquiring and analyzing data.
David Seckel, IceTop Baseline Review, Madison, Dec. 4, 2003 IceTop Baseline Review Dec. 4, Madison WI.
Mar 20, 2005 Iterative pe finder: IceTop data compression applied to In-ice D. Seckel, Univ. of Delaware.
Anita-Sim David Seckel, ANITA Collab. Mtg. Nov , /2002 Notes on building a full ANITA simulation.
DØ Online Workshop3-June-1999S. Fuess Online Computing Overview DØ Online Workshop 3-June-1999 Stu Fuess.
Predrag Buncic Future IT challenges for ALICE Technical Workshop November 6, 2015.
DOM Main PCB Testing Gerald Przybylski October 23, 2002 Lawrence Berkeley National Laboratory.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Software Engineering Requirements Review June 5, 2002 LBNL Chuck McParland.
5 June 2002DAQ System Engineering Requirements 1 DAQ System Requirements DOM Main Board Engineering Requirements Review David Nygren.
CDA 4253 FPGA System Design The PicoBlaze Microcontroller
Monitors Chapter Seven Dr. Gheith Abandah1. Outline Monitors Software monitors Hardware monitors Dr. Gheith Abandah2.
IceTop DAQ: 1 David Seckel – 8/27/2003, College Park, MD IceTop Data Handler and Triggers David Seckel University of Delaware.
© 2005 Cisco Systems, Inc. All rights reserved. BGP v3.2—7-1 Optimizing BGP Scalability Improving BGP Convergence.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Hardware Engineering Requirements Review June 5, 2002 LBNL David Nygren.
M Semiconductor Products Sector Low Voltage Inhibit Module Slide #1 of 3 Tutorial Introduction PURPOSE -To explain how to configure and use the Low Voltage.
ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013 David Cussans, AIDA WP9.3, DESY 1.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
June 19, 2009 Simulation of Askaryan Detectors and Events (SADE) David Seckel, Pat Stengel, Shahid Hussain D. Seckel, Univ. of Delaware.
IceCube DAQ Mtg. 10,28-30 IceCube DAQ: Implementation Plan.
IceTop Design: 1 David Seckel – 3/11/2002 Berkeley, CA IceTop Overview David Seckel IceTop Group University of Delaware.
ORNL is managed by UT-Battelle for the US Department of Energy Status Report: Data Acquisition and Instrument Controls for the Spallation Neutron Source.
SQL Advanced Monitoring Using DMV, Extended Events and Service Broker Javier Villegas – DBA | MCP | MCTS.
Keimyung University 1 Network Control Hong Taek Ju College of Information and Communication Keimyung University Tel:
Status of Detector Characterization a.k.a. Calibration & Monitoring Project Year 2 objectives ( → Mar ‘04) 1. Calibration plan (first draft in March.
1 Cosmic Ray Physics with IceTop and IceCube Serap Tilav University of Delaware for The IceCube Collaboration ISVHECRI2010 June 28 - July 2, 2010 Fermilab.
Bergische Universität Wuppertal Jan Auffenberg et al. Rome, Arena ARENA 2008 A radio air shower detector to extend IceCube ● Three component air.
NetScaler Gateway and StoreFront
IceTop Status: 1 David Seckel – 3/30/2003 Laguna Beach Berkeley, CA Status of IceTop: 3.2 Bartol Res. Univ. Delaware: Tom Gaisser, Xinhua Bai,
Configuration and local monitoring
Packaging and Deploying Windows Applications
DAQ Requirements M. Villa 21/02/2011.
Avaya Aura® Media Server Instructions for creating a JIRA
Data stream as an unbounded table
ProtoDUNE SP DAQ assumptions, interfaces & constraints
TRT ROD Data Compression
CALICE Readout Front End FPGA Development
Chapter 8: Monitoring the Network
Lecture 15 PicoBlaze I/O & Interrupt Interface
TPC Electronics Meeting - DDL related Software -
Presentation transcript:

Mar 20, 2005 Trigger Configuration (w/P. Toale, S-H. Seo, D. Swarnkar) D. Seckel, Univ. of Delaware

Trigger configuration, Berkeley, Mar 20, 2005 (Seckel) Outline Philosophy Table More tables Still more tables (blame Pat) Summary (Table of tables)

Trigger configuration, Berkeley, Mar 20, 2005 (Seckel) Philosophy InIce and IceTop Triggers should configure at deployment Drop in trigger classes Hints to GT to allow appropriate time window extention Robust to data interruptions

Trigger configuration, Berkeley, Mar 20, 2005 (Seckel) splice Joiner Data flow through IIT splice Global Trigger Shower Trigger 4-fold, 10  s Calibration IDH Monitoring Logging DAQ control H. Sh. Trigger 5-fold, 100 ns + SF -“Beacons” maintain output frequency - “Payload” scanner and router Drop in sub-trigger w/payload scanner and beacon. - Timestamp and Latency scanner

Trigger configuration, Berkeley, Mar 20, 2005 (Seckel) Deployment actions for XXX Deploy Trigger Module-XXX –Acquire “XXX-config ID” –Acquire List of Subtriggers –Deploy subtriggers Acquire “subtrigger config ID” Create subtrigger object Create scanner, beacon for subtrigger Configure subtrigger –Create input scanners –Create output beacon –Configure XXX

Trigger configuration, Berkeley, Mar 20, 2005 (Seckel) Trigger Types

Trigger configuration, Berkeley, Mar 20, 2005 (Seckel) Table of trigger configurations

Trigger configuration, Berkeley, Mar 20, 2005 (Seckel) SMT sub-trigger configurations

Trigger configuration, Berkeley, Mar 20, 2005 (Seckel) Trigger Data Sources

Trigger configuration, Berkeley, Mar 20, 2005 (Seckel) Readout Request

Trigger configuration, Berkeley, Mar 20, 2005 (Seckel) Time Windows     are instructions to GT Time window is extended to capture early and late event data from other IceCube components For example: InIce trigger with   = enables capture of surfce data.

Trigger configuration, Berkeley, Mar 20, 2005 (Seckel) MBT sub-trigger configurations

Trigger configuration, Berkeley, Mar 20, 2005 (Seckel) Calibration sub-trigger configurations

Trigger configuration, Berkeley, Mar 20, 2005 (Seckel) Data Quality Trigger Needed to capture questionable data flagged by upstream timestamp and latency scanner. Definition - TBD

Trigger configuration, Berkeley, Mar 20, 2005 (Seckel) Summary Lots of tables –Trigger Types –Table of trigger configurations –Tables of sub-trigger configurations SMT sub-trigger configurations MBT sub-trigger configurations Calibration sub-trigger configurations Data quality sub-trigger configurations Shower trigger sub-trigger configurations –Data source & Readout types