Pg 1 Robonaut TIR Overview September 15, 2010 Beth Griggs Robonaut Ops Lead 256-961-1926.

Slides:



Advertisements
Similar presentations
Dr. Rob Ambrose Chief, Software, Robotics and Simulation Division NASA JSC May 2011 Development and Deployment of Robonaut 2 to the International Space.
Advertisements

Cable Probe. Safety First System can conduct electricity Do not use in flammable atmosphere Use proper personal protective equipment.
Located in Indianapolis, Indiana Established 1984
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
2 Fire Fighter Qualifications and Safety Skill Drills.
Assembly / Disassembly / Reassembly Computers. Chapter Objectives After completing this chapter you will: Understand how static electricity can damage.
Automotive Chassis Systems, 5/e By James D. Halderman Copyright © 2010, 2008, 2004, 2000, 1995 Pearson Education, Inc., Upper Saddle River, NJ All.
A-dec 300 Dual Mount on 500 Installation. Agenda ► General Information ► Recommended tools ► Installation ► Follow through install guide ► Hands-on install.
Two-mode Safety and Battery System Service
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
Amateur Radio on the International Space Station (ARISS)
Steering Columns.
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
Pipe Supports and Restraints
C2V2 Technical Requirements and Constraints
Automotive Steering, Suspension and Alignment, 5/e By James D. Halderman Copyright © 2010, 2008, 2004, 2000, 1995 Pearson Education, Inc., Upper Saddle.
Chapter 3 Computer Assembly. 3. Introduction Assembling computers is a large part of a technician's job. This Chapter will teach you how to work in a.
ISS-HAM Slow Scan Television (SSTV) Project A joint AMSAT-NA And MAREX-NA Project.
Medical Consumables Tracking (MCT). Gap We do not have the capability to track medical inventory in a manor that integrates securely with the medical.
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
All logos in this presentation is courtesy of the Florida Institute of Technology Robotics and Spatial Systems Laboratory and the Florida Tech University.
Overview of AMS-02 Changes due the addition of the Permanent Magnet
SPHERES ISS Flight Preparation & Hardware Status 08 July 2002 Steve Sell Stephanie Chen
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Copyright © 2012 American Safety Management Inc. Lockout Tagout.
Laboratory 2 Group 19 The Group of Destiny. User Interface - Debugging Objectives:  Display: Sensor data (telemetry) – including IR sensors, status of.
LAT Transport Container1 GLAST LAT Project8 September 2005 LAT Transport Container Design Review 8 September 2005 LAT Transport Container Design Review.
Easy Reach 7.0 Honda Element Packing List QtyDescriptionPacked 115ft 10ga Red Wire 16ft 10ga Black Wire 140amp Breaker 23/8 Yellow Ring Terminals 25/16.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
1 NOTICE: This document includes information that is proprietary to Composite Technology Development, Inc., and is for the sole use the U. S. Government.
CIR FOMA Calibration Crew 9/24/08 1:30 PRO-CIR ACT-CMD FOMA-BTL-CAL 1 CMD PRO-CIR DEACT-CMD 274 watts 402 watts274 watts This sequence powers CIR and correlates.
EMG Calibration TASK TRAINING Foot/Ground Reaction Forces During Space Flight Peter Cavanagh, PhDNovember 16, 2001 Johnson Space Center, Houston, Texas.
Johnson Space Center, Houston TX Assembly and Disassembly Training Urine Monitoring System (UMS) 1 Familiarization Material for Assembly Task Training.
1 Columbus Control Center - Teams and Responsibilities - Roland Luettgens ESA Columbus Lead Flight Director Tel:
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
Date: September 24, 2007 Allen Taylor/TBE/FD35 Page: 1 HPA Hand Posture Analyzer Hardware Setup KAYSER ITALIA SRL Piazza 185° R.A. Folgore, 2/ Livorno.
MSG Seal Replacement Mission Scenario Pre-Pack List (SOC OCR – ULF 1.1) MSG Front Window Exchange MSG Glove Rings & Feed- through Install MSG.
Cyclops Splinter With SpinSat and Lonestar. Cyclops Splinter With SpinSat and Lonestar Cyclops provides the ISS Program with a method to transfer internally.
Page No. 1 ISS_CM_019 (Rev 08/2009) Robonaut to ISS Project Hardware Overview Sponsoring Org/Office Code: National Lab Office / OZ1 Name of Forum: Ops.
Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama TIR overview for UBNT.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Live Video.
Payload Operations Integration Working Group (POIWG) Increment 31/32 Overview January 24-26, 2011 Charles (Casey) Joyce Robotics.
Urine Monitoring System (UMS) ISS UMS is a redesigned version of the Shuttle UMS.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Payload Systems.
Robonaut Setup and Taskboard Training 5/2/2013 Curtis Kershner/ ER Dennis Bentson/
1 Robonaut: A Humanoid Robotic Assistant for On-Orbit and Planetary Missions Nicolaus Radford Automation, Robotics and Simulation Division NASA/Johnson.
Electronic Detonators
November 29, Frankie Jernigan MSG Integration Investigation Operations Lead EO
Phil Dempsey ISS Vehicle Office July 15, 2014 Inspection Considerations from the ISS Program NASA In-Space Inspection Workshop 2014.
Inc. 26 Robonaut Operations Sponsoring Org/Office Code: OZ National Lab Name of Forum: POIWG Date: 7/28/2010.
UH-60 Load Out on C-5 Aircraft
5/17/2010 Document under Export Control. See page 2. 1 SSCN Structural Launch Enclosure to Effectively Protect Robonaut (SLEEPR) LM CMC Contact Keith.
Chip Scale Atomic Clock Contact Info: Captain Ruiz Perez (281) John Merk (617) Paige McClung (281)
Increment 25/26 Cube Lab Ops TIR Overview Oct. 6, 2010 Four* new Modules (3 Aluminum Modules, 1 LMA pack) MSFC Ops Lead: Andrea Wade,
For Official NASA Use Only
NASA – MSFC, Huntsville, Alabama Muscle Atrophy Research and Exercise System (MARES) Operations Summary Part I/II Karen Somers EO20/ Operations Lead
FlowArm PLTW Motions © 2013 Project Lead The Way, Inc.Computer Integrated Manufacturing.
Bodies In the Space Environment (BISE) Operations Summary Prepared by Amy Jupin Operations Lead EO
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Radiation Environment Monitor Kevin Hargrave EO
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
FlowArm PLTW Motions Computer Integrated Manufacturing
Microscope Close-Out Photos
Easy Reach 7.0 Honda Element 2003
Easy Reach 7.0 Honda Element 2003
LSG Capabilities LSG nomenclature: WV - Work Volume AL - Air Lock
Robotic Arm Project Presentation
SLIPS, TRIPS, AND FALLS (Losing your Balance, Traction or Grip)
1.11: Robot Controller.
Presentation transcript:

Pg 1 Robonaut TIR Overview September 15, 2010 Beth Griggs Robonaut Ops Lead

Pg 2 Hardware – Robonaut and Associated Equipment A Robonaut Upper Torso for use as a robotics testbed on ISS. Upper Torso includes: –Head –Arms –Waist Joint –Backpack Power Supply –Motion Stop Controller Mechanical Interface to ISS –Baseplate interface to Rack Seat Track –Stanchion interface between Torso and Baseplate Task Board with task panels –Reconfigurable mounting board for Robonaut experimental tasks Switches, connectors, handrails, etc. Robonaut Baseplate and Stanchion Task Board with Task Panels

Pg 3 Hardware - SLEEPR Integration into SLEEPR/Clamshell (Structural Launch Enclosure to Effectively Protect Robonaut) SLEEPR mounted on starboard side of PMM and protrudes into aisle Five struts secure Robonaut inside Forty captive screws have to be removed from back panel. Four bolts and a screw must be loosened to remove Robonaut from dovetail fitting on base of SLEEPR. SLEEPR will be discarded without further disassembly and can only fit in HTV2 – this may mean we can’t remove Robonaut from SLEEPR until HTV-2 arrives.

Pg 4 Hardware – Station Support Equipment –UOP Cable Assembly (SEG ; 14’ cable) –PEEK 120 VDC 12 AMP 10' Extension Cable (SEG ) –Ethernet Cable (1F x) –USB Speaker Cable (SEG ) –Unbalanced BNC Cable (SED ) –Advanced Video Interface Unit (SED ) –Internal Camera Port (ICP) Interface Cable (SEG ) –Multiuse Bracket Assembly (SEG ) –Velcro Straps (P/N X, different lengths) –Handrail Equipment Anchor Assembly (HEA) (G11F5121-1) –Seat Track Equipment Anchor Assembly (STEA) (P/N TBD) –SSC (Station Support Computer) T61P Laptop (SEG )

Pg 5 MO-3 Bottom MO-1 Bottom Stowage Configuration Robonaut and the support hardware will be stowed in an MO1 and MO3 bag within the LAB1P1 location when not in use The MO1/MO3 bags will be tethered via bungee/velcro ties in the empty rack bay. These procedures are in development. This stowage configuration has been coordinated with OZ, ISS Stowage and Topology groups. Procedures will need OSO review.

Pg 6 Robonaut Torso Baseplate Task Board Softgoods Task Panel Stanchion (w/ softgoods cover) Stowage Configuration (continued)

Pg 7 Deployed Configuration on ISS Operations LAB1D2 LAB1P2 Inc 27 will likely progress into Task Board operations. Inc 26 will likely only entail Free Space operations. Robonaut will be mounted to LAB1P2 for Free Space AND Task Board ops.

Pg 8 Robonaut Free space Ops – INC 26 OperationObjectiveCrew/GroundNotes/Constraints Stowage ConfigurationRemove Robonaut from launch container & stow in LAB1P1 CrewEmpty LAB1P1 location, OSO Transfer from PMM complete Robonaut On-Orbit Soak Power on Robonaut, establish comm, monitor telemetry, verify functionality. Determine response to 0-G. Mainly ground commanding. Crew will need to physically flip switches, provide feedback on hardware. SSC Load with Robonaut SW must be completed; No Robonaut Movement, cabin video required Robonaut Safety Checkout Verify Safety Controls are place Mainly ground commanding, crew needed to physically maneuver limbs, provide feedback on hardware. Limited movement; cabin video required; ground controlled Robonaut System Checkout (may be repeated several times for various tests) Verify vision capabilities, test joint range of motion Mainly ground commanding, crew needed to physically maneuver limbs, provide feedback on hardware. Head, limb and single joint movement, ground controlled. cabin video required EPO or PAO Opportunities TBDGround and CrewTBD

Pg 9 Robonaut – ISS Interfaces Structural: –Baseplate, Stanchion, Robonaut will be mounted to LAB1P2 –Task Board when in use will be mounted to LAB1D2 Power: –120 VDC from UOP. Power will come from UOP1 and will use a PEEK 10 foot extension cable and a 14 foot power cable. Data: –Joint Station LAN (JSL) (Connected to UIP at Lab1D1) (GigE Video) Thermal: –Robonaut is cooled by forced air flow from fans within the robot and the backpack, therefore interfacing to the cabin air Video: –TeleOps Video will require the standard Lab Cabin Video Pathway (AVIU  US Lab ICP (Internal Camera Port)  CVIU (Common Video Interface Unit)  etc –Node 2 Cabin Video – Positioned to face into US Lab to “see” Robonaut, must use the Node 2 camera because the lab cabin video interface is needed for TeleOps Vision.

Pg 10 Robonaut – ISS Interfaces Telemetry: –Require “Near Real-time” downlink of Robonaut data Bandwidth: No lower than 100kbs Robonaut raw data will be captured off OCA LAN on a new workstation (Robonaut Ground Workstation) in MCC next to Admin PC –Admin PC Usage –Require Admin PC access to Remote Desktop into on-board ISS SSC Client. –Remote Desktop session will be used to control the Robonaut GUI program on ISS SSC Client to remote control Robonaut. –ISS OCA PC Usage –Require OCA PC to uplink new config files or edited script files as necessary to ISS SSC Server.

Pg 11 Robonaut – Data Pathway

Pg 12 JSC TSC PAYCOM CAPCOM FD Robonaut Control* (Admin PC) ISS Crew POD Robonaut Lead Robonaut (US Lab) Command & Telemetry via JSL Voice I/F Robonaut Task * Robonaut Control console may be required to support from MER for initial ops Proposed Real-Time Ops Concept

Pg 13 Robonaut – Potential Scheduling Conflicts Due to the size of Robonaut there are several scheduling guidelines and constraints. The following crew- tended operations shall not be scheduled concurrently: - Avionics-2 (LAB1D1) - Avionics-2 (LAB1D2) - WORF (LAB1D3) - ER-1 (LAB1O2) - ER-2 (LAB1O1) - MELFI-2 (LAB1S1) - MSG (LAB1S2) - CIR (LAB1S3) - MSRR-1 (LAB1O3) - ER-7 (LAB1P2) - FIR (LAB1S4) - PPFS (LAB1P2 and LAB1P3) deployed - SPHERES (aisle bays 1-3)

Pg 14 Scheduling Constraints The PSRP specified a thermal constraint and has limited Robonaut to 2.2 hours from power up to power down. Operations will only occur in the US Lab. Robonaut must be stowed in non-flammable MO-3 bag when not in use. A small portion of "skin" (elbow joint, shoulder joint, portions of glove at wrist) are made of Lycra which is flammable. PEI included the following in PIRN NA-0004: “Robonaut shall not come within 6 inches of any rack face during operations except during ops requiring the Task Board”. However, the PD team has stated they will not sign this PIRN since the PSRP never levied the requirement. MSG Stray light cover will be deployed during Robonaut ops to prevent scratching the Lexan window in case of Robonaut failure.

Pg 15 Robonaut Operational Hazard Controls 1Structural Failure HAZARD DESCRIPTION: Structural failure of the robot HAZARD CONTROLS: Closed volumes inside Robonaut have been assessed to verify that no hazard will result if exposed to a depressurization event 2Structural Failure of Support Hardware HAZARD DESCRIPTION: Structural failure of Robonaut Stanchion, Baseplate, or Task Board could release a large mass, causing injury to the crew or damage to ISS hardware, and inability to properly react applied loads could transmit excessive force to ISS Rack mounting structure causing damage to vehicle hardware. HAZARD CONTROLS: Robonaut Support Hardware is designed to withstand worst-case launch or on-orbit loads, 3Shatterable Material HAZARD DESCRIPTION: Robonaut camera lenses are made of glass HAZARD CONTROLS: The lenses are protected by Robonaut’s face plate and are not subject to loading. 4Fire HAZARD DESCRIPTION: Robonaut contains flammable materials HAZARD CONTROLS: Robonaut is to be stowed in its non-flammable bag when not in use and kept away from ignition sources. 5Touch Temperature HAZARD DESCRIPTION: Robonaut external surfaces can approach temperatures of ~151 o F before the internal temperatures reach the thermal limits of the electronic components. HAZARD CONTROLS:Operating time will be limited for Robonaut.

Pg 16 Robonaut Operational Hazard Controls 6 Electrical Shock HAZARD DESCRIPTION: Electric components pose a shock hazard. HAZARD CONTROLS: Conductive surfaces are double-fault bonded and grounded to Station ground. The braided shield on the power cable provides a secondary ground path. 7Interference with Rapid Egress HAZARD DESCRIPTION: When installed, Robonaut does not obstruct the translation path through the US Lab HAZARD CONTROLS: In the event of an emergency requiring the crew to exit the module, Robonaut can be removed within 30 seconds using quick release mechanisms. 8Uncommanded Motion / Excessive Force HAZARD DESCRIPTION: Robotic operations in the location of crew members and nearby equipment carries the inherent risk of crew injury or hardware damage HAZARD CONTROLS: Robonaut is designed with a robust control architecture that prioritizes human safety. Robonaut has multiple independent controls against exerting excessive force, and it is designed to safe itself in the event of system errors. 9Release of Toxic Fluid from Capacitors HAZARD DESCRIPTION: Robonaut uses various sizes of aluminum electrolytic capacitors. The electrolyte has been assessed as THL 1, requiring 2 levels of containment. HAZARD CONTROLS: Absorbent material has been added to mitigate any electrolyte release. All capacitors are enclosed within either the robot body or the backpack and are not accessible to the crew. In addition, the components are used below their rated voltages, reducing the risk of failure. 10Inadvertent Release of Tools HAZARD DESCRIPTION: Robonaut may use different hand-held tools when interfacing with the Task Board. HAZARD CONTROLS: Release of these tools could create a hazard, so larger tools will be tethered or crew tended..

Pg 17 OTHER ITEMS OF NOTE The SSC Integrated Load V 4.0 that includes Robonaut software must occur prior to ops. (expected early Dec 2010) Robonaut joints (wrist, elbow, shoulder) are covered with flammable lycra, thus the requirement for the MO-3 Bag. A hand-held Motion Stop button will have velcro patches and a 20’ cable such that it can be affixed beyond Robonaut’s max reach. Since Robonaut will be controlled from the PLUTO workstation at JSC, schedulers will need to ensure that scripts can be complete before LOS. We will not ask the crew to operate during LOS. Since PLUTO does not staff weekends, Robonaut is not a candidate for Vol Science. Robonaut must use SSC Server 1. There may be a required wait after the SOAK for data analysis before the SAFETY and SYSTEMS checkouts can begin. However, feedback should be instant from the checkouts. Cable connections are located at the bottom of the Backpack with labels stitched on the soft cover. During setup, the crew has to create a 40” service loop of cables to allow Robonaut to have 225 degree rotation. All cables except the Motion Stop Controller are Common Use Station hardware and are shared. A JOIP is being developed to document coordination between POIC, the Robonaut team and MOD.

Pg 18 Back-up Slides

Pg Aluminum –~30 lbs –19” x 41.25” x 6.36” Task Board Frame is black anodized for maximizing fiducial contrast 6 fiducials Holds 4 removable sub-panels ¼ turn fastener interface 1” x 2” Velcro squares with seat track section Attaches to rack seat track via threaded knobs Task Board

Pg 20 Task Board Panels 6061 Aluminum –Clear anodized –~ 5 lbs –8.65” x 12.65” x 4.31” 5 Sub Panels in work –IVA Task Panel – Un-powered –IVA Task Panel – Powered –Hardware stowage panel –EVA task panel –Softgoods panel Attached to task board frame with 4 quarter turn fasteners

Pg 21 Baseplate 6061 Aluminum –~57 lbs –22” x 41.25” x 4.26” Dovetail Design Concept –Allows for horizontal adjustment –Low profile Attaches to rack seat track with threaded knobs Qty 2 fiducials

Pg 22 Stanchion 6061 Aluminum –~22 lbs –9” x 9” x 26.06” Dovetail Design Concept –Allows for horizontal adjustment Spring plunger interface provides discrete locations along the baseplate –2 threaded knobs provide clamping force for dovetail joint Installs in either orientation –Symmetric Includes stanchion cover –Softgoods cover