MIRI day 3 june 2010 Biography of JWST MIRI SMO FM MIRI day 1.

Slides:



Advertisements
Similar presentations
May 19, 2009JWST Partner's Workshop1 NIRCam Status Marcia Rieke University of Arizona JWST Partner’s Workshop Ottawa, Canada May 19, 2009 JWST-PRES
Advertisements

30-meter cabin refurbishment for a large Field Of View: status of on-going study S.Leclercq 28/04/2008.
1 ATST Imager and Slit Viewer Optics Ming Liang. 2 Optical layout of the telescope, relay optics, beam reducer and imager. Optical Layouts.
NIR INSTRUMENT FOR GLAO Takashi Hattori, Iwata Ikuru (Subaru Telescope)
1 FGS Guider CDR – April 19, 2007 © Copyright 2007 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada FGS Guider.
Week 3.
3. Image motion due to optical element motion
PALM-3000 HOWFS - 2/20/09 C. Baranec. PALM-3000 HOWFS Current optical testing Review of Feb 8 th HOWFS update Detailed future tasks 2.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
1. Common Optics Assembly (COA) Main optics housing riveted on channel housing (with rod) QM delivered
PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010.
IQ and Human Evolution. Readings
Wide-field, triple spectrograph with R=5000 for a fast 22 m telescope Roger Angel, Steward Observatory 1 st draft, December 4, 2002 Summary This wide-field,
PALM-3000 Optical Bench Update Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss Team Meeting #15 10/29/2009.
Spherical Mirrors - Starter
 Design  Manufacturing  Recent X-Ray tests  Status Vadim Burwitz, Peter Friedrich on behalf of the eROSITA team.
Setup of laser tracker on DX side NOTE: X axis along M1s centers, towards SX Z axis along M1-M2 centers, towards M2.
Dennis C. Evans p1 SuperNova/Acceleration Probe 16 November 2001 Optical Analysis & Stray Light Evaluation Optical Analysis and Stray Light Evaluation.
1 DIABLO De-rotated Imager of the Aurora Borealis in Low-Earth Orbit Interim Review 1 Nicole Demandante Laura Fisher Jason Gabbert Lisa Hewitt Lang Kenney.
MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September JWST Status.
Real-Time Phase-Stamp Range Finder with Improved Accuracy Akira Kimachi Osaka Electro-Communication University Neyagawa, Osaka , Japan 1August.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
The Mid-Infrared Instrument (MIRI) Medium Resolution Spectrometer for JWST Martyn Wells MIRI EC & UKATC.
PACS IIDR 01/02 Mar 2001 FPFPU Alignment1 D. Kampf KAYSER-THREDE.
TPAC progress Jamie C 29 th July TPAC1.1 Status Submitted 17 th –Some minor DRC errors found at foundry –Corrected/waived Re-Submitted 23 rd July.
NIRCam ETU Testing at LMATC, Palo Alto Kailash C. Sahu.
High Resolution Echelle Spectrograph for Chinese Weihai 1m Telescope. Leiwang, Yongtian Zhu, Zhongwen Hu Nanjing institute of Astronomical Optics Technology.
DL – IFU (Prieto/Taylor) Slicer: –25mas sampling … 0.9mm slices ~f/250 (assuming no anamorphism) Detector = 2k array of 18um pixels –Slit subtends 1-pixel.
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 BTFI Optics (Keith Taylor)
MARS Design Review PP-1 Requirements Definition Performance: –Tip/Tilt error < 0.06″ rms mirror coordinates 0.12″ rms image coodinates 0.28″ fwhm image.
SPIE Optics for EUV, X-Ray, and Gamma-Ray Astronomy VI
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
MIRI Optical System CDR, 6 th & 7 th December 2006 Mid InfraRed Instrument 07-1 Optical System Critical Design Review (CDR) TIPS Presentation: Margaret.
Basic Optical Devices Part 1 Mirrors, Prisms, Diffraction Gratings and Spectroscopes.
PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array1/16 Ch. Hartinger / L. Barl Ge:Ga Detector Arrays.
SEVIRI Scan Mirror M. Lampton UCB SSL Oct SEVIRI Spinning Enhanced Visible IR Imager Main instrument aboard MSG-1 (Meteosat Second Generation) Zerodur.
Apr 17-22, NAOJ External alignment with X-Ray Telescope (XRT) and EUV Imaging Spectrometer (EIS) Y. Katsukawa (NAOJ) and SOT team.
Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA MIRI VM2 Testing Scott Friedman and the MIRI Test Team (special thanks to Paul Eccleston, Alistair.
1 MIRI Hardware (from Oct-Dec NPM reports)‏ Fred Lahuis (NPM input from Rieks Jager)‏ SRON MIRI NL Meeting Leiden, 6 th January 2010.
Status of the ITS Alignment Monitoring System First results By Bjørn S. Nilsen The Ohio State University.
Wind Lidar Working Group, 29 June 2005 Welches, OR Doppler Lidar Scanning Telescope Technology Geary Schwemmer Meeting of the Working Group on Space-based.
NIRSpec IFU Eric Prieto Final Presentation Definition Phase May, 11th – ESTEC.
Periscope Configuration
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
14FEB2005/KWCAE2-UsersGroup Astro-E2 X-Ray Telescopes XRT Setup & Structure Performance Characteristics –Effective Area –Angular Resolution –Optical Axes.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
The Field Camera Unit Results from technical meeting S. Scuderi INAF – Catania.
STC "VOSKHOD", PROJECT "SPECTR-UV", JUNE 2006 Next slide Next slide Previous slide Possible layouts of Field Cameras.
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
Geometric Optics: Mirrors and Lenses. Mirrors with convex and concave spherical surfaces. Note that θ r = θ i for each ray.
Development of Micro-Pore Optics at NAOC MPO research group X-ray Imaging Laboratory, NAOC Presented by Chen Zhang.
The reading is 7.38 mm. The reading is 7.72 mm.
IBWS 2006, VLAŠIM1 OPTICON OPTICAL REPLICATION EXPERIMENTS REVIEW Veronika Semencová, Libor Švéda, Adolf Inneman, René Hudec, Ladislav Pína, Michaela Skulinová.
Update on electron spectrometer measurements Introduction Setup, measurements carried out Some raw images Results and conclusions L. Deacon, M. Wing (UCL)
AO Series 10 Illuminator pattern
4x8 Mosaic Camera Development
30-Nov-2006 Jean-Marc Defise - CSL
Summary Single Object & Time Series Spectroscopy Jeff Valenti JWST Mission Scientist Space Telescope Science Institute.
عمل الطالبة : هايدى محمد عبد المنعم حسين
آشنايی با اصول و پايه های يک آزمايش
كار همراه با آسودگي و امنيت
التعامل مع ضغوطات العمل إعداد وتقديم إقبال المطيري
Let A = {image} and B = {image} . Compare A and B.
James Webb Space Telescope
Find a power series representation for the function {image}
The Image The pixels in the image The mask The resulting image 255 X
Types of Errors And Error Analysis.
Find a power series representation for the function {image}
Evaluate the integral {image}
Presentation transcript:

MIRI day 3 june 2010 Biography of JWST MIRI SMO FM MIRI day 1

3 june 2010 Design evolution 2

MIRI day 3 june

MIRI day 3 june 2010 MIRI development 4

MIRI day 3 june 2010 EQMm and EQMg 5

MIRI day 3 june 2010 STM 6

MIRI day 3 june 2010 QM 7

MIRI day 3 june 2010 VM 8

MIRI day 3 june 2010 MIRI VM tests 9

MIRI day 3 june 2010 Improvements l Response folding flat l Response M1-1 l Integrate mounting points in structure l Peripheral mounting -No bolt heads in optics box l Additional baffles l Closed covers 10

MIRI day 3 june 2010 Response folding flat 11

MIRI day 3 june 2010 Response structure 12 3*σ rms [ N/mm 2 ] 3*σ rms [N/mm 2 ] SimplifiedReinforce d factor Full Recalculat ed Stress in Mirror

MIRI day 3 june 2010 Integrate mounting points in structure 13

MIRI day 3 june 2010 No bolt heads in optics box 14

MIRI day 3 june 2010 SMO FM integration 15

MIRI day 3 june 2010 SMO FM 16

MIRI day 3 june 2010 SMO FM results: Focus 17 Series worst channel offset [mm] focal pos. errors [mm] worst focus offset [mm] error budget [mm] pass or fail? SW#10.023±0.028±0.051±0.095pass SW#20.023±0.028±0.051±0.095pass LW#10.042±0.028±0.070±0.095pass LW#20.028±0.028±0.056±0.095pass

MIRI day 3 june 2010 SMO FM results: Image Quality 18

MIRI day 3 june 2010 FM SMO results: Bore Sight 19 SMO status channel worst deviation X [pixels] worst deviation Y [pixels] after integration 1 73 after vibration73 after TVC73 after integration 2 54 after vibration73 after TVC72 after integration after vibration96 after TVC107 after integration 4 73 after vibration73 after TVC73

MIRI day 3 june 2010 FM “challenges” 20

MIRI day 3 june 2010 GWA FM 21

MIRI day 3 june 2010 MIRI FM 22