Procedures for detecting vacuum leaks in the LHC LTC open action from 9.2.2005/36. LTC Frank Zimmermann, LHCCWG 23 October 2007.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
MERIT pre-installation review: Preliminary conclusions A.Fabich.
IR vacuum M. Sullivan PEP-II meeting Feb. 22, 2007.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
LHC VACUUM SYSTEM: 2012 REVIEW AND 2014 OUTLOOK G. Lanza, V. Baglin, G. Bregliozzi, J.M. Jimenez EVIAN 2012.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
WP 13 : Beam Diagnostics Conceptual Specifications Rhodri Jones (BE/BI)
LHC Commissioning WG, 22/05/2007 LHC Systems Cryogenics….as seen by “Beam Handlers” G. Arduini, S. Redaelli Many thanks to: A. Butterworth, S. Fartoukh,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Vacuum and Cryogenics observations for different bunch spacing J.M. Jimenez On behalf of CRG and VSC Groups with the contributions of G. Arduini, V. Baglin,
1 Electron Cloud in LHC V. Baglin CERN AT-VAC, Geneva 1. Mecanism and Recipies 2. LHC Vacuum Chambers 3. Diagnostics 4. Conclusions Vincent Baglin Electron.
LTC Extended days, 03 March’08 J.M. Jimenez, AT Vacuum Group LHC Vacuum commissioning J.M. Jimenez On behalf of AT-VAC.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
Eva Barbara Holzer IEEE NSS, Puerto Rico October 26, Beam Loss Monitoring System of the LHC Eva Barbara Holzer, CERN for the LHC BLM team IEEE Nuclear.
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
YONG WANG, BO ZHAN, GJIE WANG National Synchrotron Radiation Laboratory University of Science and Technology of China Key vacuum technologies.
Expected Quench Levels of the Machine without Beam: Starting at 7 TeV ? P. Pugnat CERN, Geneva, Switzerland LHC Project Workshop Chamonix XV, Tuesday 24.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
1 LHC vacuum Rossano Giachino Acknowledgments Jimenez,V.Baglin,J.C.Billy,I.Laugier Rossano Giachino November 2007.
Beam induced heating assessment on LHC beam screens Arcs + DSs + ITs L. Tavian LBOC, 27 September 2011.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Beam screens in IT phase 1
D. Bozzini, AT/MEL/EM, Chamonix Workshop XIV, January Chamonix Workshop XIV Session 4 – Other Issues affecting Beam Commissioning 1 Electrical Quality.
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
LHC Scrubbing Runs J.M. Jimenez On behalf of the Electron Cloud Study Team, a Collaboration between AT and AB Departments.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
4/27/06 1 US LHC ACCELERATOR RESEARCH PROGRAM brookhaven - fermilab – berkeley - slac US LARP Inner Triplet Cryogenics and Heat Transfer LARP Collaboration.
GLA2011 The cryogenic systems of the LHC experiments Johan Bremer on behalf of TE/CRG, ATLAS collaboration and CMS collaboration.
Heat loads and cryogenics L.Tavian, D. Delikaris CERN, Cryogenics Group, Technology Department Accelerators & Technology Sector Friday, October 15, 20101HE-LHC'10.
FCC Week 2015, Washington Cooling the FCC beam screens
The integration of 420 m detectors into the LHC
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
Can we change a magnet without warming-up a full arc ? Serge Claudet, With help from P. Cruikshank & J-P. Tock (Chamonix Jan’10)
AT-VAC SPC Nicolaas KOS Beam Screens for Inner Triplet Magnets LHC Upgrade Phase 1 Nicolaas KOS  LHC Upgrade phase 1  Inner triplet BS Requirements.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
E.B. Holzer BLM Meeting: Q & A March 20, Questions and Answers.
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
Workshop on cryogenic & vacuum sectorisation of the SPL Vacuum Sectorisation Paul Cruikshank, CERN Technology Department (TE) Vacuum Surfaces & Coatings.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
Vacuum Cleaning / Scrubbing measurements in the LHC J.M. Jimenez on behalf of G. Arduini, V. Baglin, G. Bregliozzi, P. Chiggiato, G. Lanza, OP.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Beam screen cooling: scaling from LHC to FHC Philippe Lebrun FHC meeting on beam pipe design, CERN 20 December 2013.
ALIGNMENT OF THE NEW TRIPLETS
Cryogenic behavior of the cryogenic system
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Feasibility and implication of installation of the string test in SM18 with a slope M. Bajko WP16.
HEL – Safety aspects Christelle Gaignant
S. Claudet, Daniel Berkowitz & A. Perin (TE-CRG)
The LHC - Status Is COLD Is almost fully commissioned
Consequences of warming-up a sector above 80 K
Electron cloud & vacuum pressure observations: 2011 proton run
Accelerator System - Vacuum
Daniel Berkowitz (TE-CRG)
SNS Operational History
J.M. Jimenez On behalf of TE-VSC group
TEST PLANS for HL LHC IT STRING
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
Brief report of the hardware commissioning activities
Cryogenic behavior of the magnet
Review of Quench Limits
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

procedures for detecting vacuum leaks in the LHC LTC open action from /36. LTC Frank Zimmermann, LHCCWG 23 October 2007

“Issues Effecting the Efficiency of Beam Commissioning (LTC Follow-Up) Chamonix XIV January 2006”, Steve Myers

revisiting the problem  He leak in cryogenic temperature environment leads to He pressure wave that may span several tens of meter without being detected; for large surface coverage He pressure reaches 17 Torr (saturated vapor pressure)!  average He gas density over 1 meter must be < He/m 3 to avoid quench with nominal p 7 TeV - equivalent to 33 nTorr at 1.9 K or 420 nTorr measured at 300 K (p~T 1/2 )  after quench: quenched magnet identified by triggered diode; cold bore warmed up to > K; He flushed to nearest unquenched magnet & condensed over ~ 10 m Vincent Baglin, Chamonix XIV

diagnostics vacuum gauges: placed every 3 or 4 cells ( m) i.e. 6 to 8 gauges per arc BLMs: every 53 m at each arc quadrupole and inner triplet power in cold masses: ~ 1 W/m over one cell can be measured (local quench level ~ 9 W/m at 7 TeV), needs ~6 h mobile vacuum gauges or residual gas analyser: can be installed locally, in SSS, every 53 m, for leak detection (→ vacuum wish : spread the quench till the nearest SSS) mobile radiation monitors: 32 can be installed per cell, sensitive down to “50 nTorr” (at which temperature?), needs ~¼ h [Thijs] warm up of cold bore to 4.2 K with He pump out for leaks < Torr.l/s existence, level and position of He leak shall be CLEARLY identified before intervention at capillaries or exchanging magnet Vincent Baglin, Chamonix XIV

sensitivity ranking radiation monitors (mobile, installation time ~1 day) cryogenic heat load BLMs vacuum gauges typically sensitivity decreases by factor 5-10 between two successive diagnostics tools listed above not discussed by Vincent: “snake” BLMs [Jeanneret] debunching and measuring e- current on biased BPMs (as in ISR & AA) [Poncet] notice: it seems to be more difficult to measure high leak rates than low ones?!

BLMs fixed BLMs: at each quad 3 monitors per beam mobile BLMs: 2 spare channels per card at each arc quad; more complicated in the LSS because of more elements Laurette Ponce, LHCCWG,

Alain Poncet’s proposal

Other ideas: use reflectometer to find local He bumps Fritz Caspers, today’s coffee

questions/actions can we indeed bias the BPMs? do we have the mobile radiation monitors? are the additional arc gauges and arc RGAs available? is it easy to access information on cryo heat load per cell? do we have snake BLMs? assess reflectometer sensitivity