These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.

Slides:



Advertisements
Similar presentations
Software Engineering: A Practitioner’s Approach Chapter 25 Process and Project Metrics copyright © 1996, 2001, 2005 R.S. Pressman & Associates, Inc.
Advertisements

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
Project Estimation: Metrics and Measurement
COSC 4406 Software Engineering
Chapter 4 Software Process and Project Metrics
1 Estimating Software Development Using Project Metrics.
Metrics. A Good Manager Measures measurement What do we use as a basis? size? size? function? function? project metrics process metrics process product.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
Chapter 4 Software Process and Project Metrics
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
Chapter 22 Process and Project Metrics
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
Process and Project Metrics
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
Metrics for Process and Projects
Metrics for Process and Projects
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
Software Metrics.
Metrics Project and Process Metrics. Why do we measure? Assessing project status Allows us to track risks Before they go critical Adjust workflow See.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
Software Engineering II - Topic: Software Process Metrics and Project Metrics Instructor: Dr. Jerry Gao San Jose State University
A Good Manager Measures
Software Process and Product Metrics
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
1 These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
Software Engineering Software Process and Project Metrics.
Chapter 6 : Software Metrics
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
1 Chapter 4 Software Process and Project Metrics.
Software Project Management Lecture # 3. Outline Chapter 22- “Metrics for Process & Projects”  Measurement  Measures  Metrics  Software Metrics Process.
Software Metrics – part 2 Mehran Rezaei. Software Metrics Objectives – Provide State-of-art measurement of software products, processes and projects Why.
Lecture 4 Software Metrics
Computing and SE II Chapter 15: Software Process Management Er-Yu Ding Software Institute, NJU.
Chapter 3: Software Project Management Metrics
1 Software Engineering: A Practitioner’s Approach Chapter 25 Process and Project Metrics Software Engineering: A Practitioner’s Approach Chapter 25 Process.
SOFTWARE PROCESS AND PROJECT METRICS. Topic Covered  Metrics in the process and project domains  Process, project and measurement  Process Metrics.
1 Software Engineering: A Practitioner’s Approach, 7/e Chapter 2 Process: A Generic View Software Engineering: A Practitioner’s Approach, 7/e Chapter 2.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
1 Software Engineering: A Practitioner’s Approach, 6/e Chapter 15a: Product Metrics for Software Software Engineering: A Practitioner’s Approach, 6/e Chapter.
Hussein Alhashimi. “If you can’t measure it, you can’t manage it” Tom DeMarco,
Advanced Software Engineering Lecture 4: Process & Project Metrics.
1 Lecture 12: Chapter 16 Software Quality Assurance Slide Set to accompany Software Engineering: A Practitioner’s Approach, 7/e by Roger S. Pressman Slides.
Chapter 22 Metrics for Process and Projects Software Engineering: A Practitioner’s Approach 6 th Edition Roger S. Pressman.
Software Project Management Lecture # 3. Outline Metrics for Process and Projects  Introduction  Software Metrics Process metrics Project metrics Direct.
1 These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
1 Software Engineering: A Practitioner’s Approach Chapter 25 Process and Project Metrics Software Engineering: A Practitioner’s Approach Chapter 25 Process.
Chapter 22 Process and Project Metrics
Software Engineering (CSI 321)
Chapter 4 Software Process and Project Metrics
Software Project Sizing and Cost Estimation
Why Do We Measure? assess the status of an ongoing project
For University Use Only
Software Engineering: A Practitioner’s Approach Chapter 25 Process and Project Metrics copyright © 1996, 2001, 2005 R.S. Pressman & Associates, Inc.
Why Do We Measure? assess the status of an ongoing project
Chapter 25 Process and Project Metrics
Software Engineering: A Practitioner’s Approach, 6/e Chapter 22 Process and Project Metrics copyright © 1996, 2001, 2005 R.S. Pressman & Associates,
Software metrics.
Why Do We Measure? assess the status of an ongoing project
Process and Project Metrics
Why Do We Measure? assess the status of an ongoing project
Chapter 32 Process and Project Metrics
Chapter 22 Process and Project Metrics
Metrics for Process and Projects
Presentation transcript:

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Software Engineering: A Practitioner’s Approach, 6/e Chapter 22 Process and Project Metrics Software Engineering: A Practitioner’s Approach, 6/e Chapter 22 Process and Project Metrics copyright © 1996, 2001, 2005 R.S. Pressman & Associates, Inc. For University Use Only May be reproduced ONLY for student use at the university level when used in conjunction with Software Engineering: A Practitioner's Approach. Any other reproduction or use is expressly prohibited.

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Until you can measure something and express it in numbers, you have only the beginning of understanding. - Lord Kelvin

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Until you can measure something and express it in numbers, you have only the beginning of understanding. - Lord Kelvin Non-software metrics you use everyday: - Gas tank scale - Speedometer - Thermostat in your house - Battery monitor in your laptop What would happen if instead these were not numeric? What other examples do you have? Gas Tank ☐ A Lot ☐ Some  A little Gas Tank ☐ A Lot ☐ Some  A little

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Until you can measure something and express it in numbers, you have only the beginning of understanding. - Lord Kelvin The problem is non-numeric measurements are subjective… they mean different things to different people. Numbers are objective… they mean the same thing to everyone! When your friend says “oh yeah, John/Jane Doe is super attractive, you should go our with him/her”… that is a subjective measurement… so, you ask “Send me a photo”. Why? Because the subjective term “super attractive” has vastly different meanings for different people!

Metrics for software When asked to measure something, always try to determine an objective measurement. If not possible, try to get as close as you can! When asked to measure something, always try to determine an objective measurement. If not possible, try to get as close as you can! These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001,

6 A Good Manager Measures measurement What do we use as a basis? size? size? function? function? project metrics process metrics process product product metrics

We need a basis to say 20 defects per X lines of code. Why is this important? A Because lines of code equals cost A Because lines of code equals cost B We want our metrics to be valid across projects of many sizes B We want our metrics to be valid across projects of many sizes C Because you just caused me to die in Halo 3… stop asking these questions! C Because you just caused me to die in Halo 3… stop asking these questions! D Because this helps up understand how big our program is D Because this helps up understand how big our program is These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001,

8 Why Do We Measure? assess the status of an ongoing project track potential risks uncover problem areas before they go “critical,” adjust work flow or tasks, evaluate the project team’s ability to control quality of software work products.

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Process versus Project Metrics Process Metrics - Measure the process to help update and change the process as needed across many projects Process Metrics - Measure the process to help update and change the process as needed across many projects Project Metrics - Measure specific aspects of a single project to improve the decisions made on that project Project Metrics - Measure specific aspects of a single project to improve the decisions made on that project Frequently the same measurements can be used for both purposes Frequently the same measurements can be used for both purposes

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Process Measurement We measure the efficacy of a software process indirectly. We measure the efficacy of a software process indirectly. That is, we derive a set of metrics based on the outcomes of the process That is, we derive a set of metrics based on the outcomes of the process Outcomes include Outcomes include measures of errors uncovered before release of the software measures of errors uncovered before release of the software defects delivered to and reported by end-users defects delivered to and reported by end-users work products delivered (productivity) work products delivered (productivity) human effort expended human effort expended calendar time expended calendar time expended schedule conformance schedule conformance many others… many others… We also derive process metrics by measuring the characteristics of specific software engineering tasks. We also derive process metrics by measuring the characteristics of specific software engineering tasks.

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Process Metrics Guidelines Use common sense and organizational sensitivity when interpreting metrics data. Use common sense and organizational sensitivity when interpreting metrics data. Provide regular feedback to the individuals and teams who collect measures and metrics. Provide regular feedback to the individuals and teams who collect measures and metrics. Don’t use metrics to appraise individuals. Don’t use metrics to appraise individuals. Work with practitioners and teams to set clear goals and metrics that will be used to achieve them. Work with practitioners and teams to set clear goals and metrics that will be used to achieve them. Never use metrics to threaten individuals or teams. Never use metrics to threaten individuals or teams. Metrics data that indicate a problem area should not be considered “negative.” These data are merely an indicator for process improvement. Metrics data that indicate a problem area should not be considered “negative.” These data are merely an indicator for process improvement. Don’t obsess on a single metric to the exclusion of other important metrics. Don’t obsess on a single metric to the exclusion of other important metrics.

If I calculate the number of defects per developer and rank them, then using that rank assign salary raises based on that. A. This is good A. This is good B. This is bad B. This is bad C. Helloo…. Halo 3? Stop it. C. Helloo…. Halo 3? Stop it. These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001,

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Software Process Improvement SPI Process model Improvement goals Process metrics Process improvement recommendations Make your metrics actionable!

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Typical Process Metrics Quality-related Quality-related focus on quality of work products and deliverables focus on quality of work products and deliverables Productivity-related Productivity-related Production of work-products related to effort expended Production of work-products related to effort expended Statistical SQA data Statistical SQA data error categorization & analysis error categorization & analysis Defect removal efficiency Defect removal efficiency propagation of errors from process activity to activity propagation of errors from process activity to activity Reuse data Reuse data The number of components produced and their degree of reusability The number of components produced and their degree of reusability Within a single project this can also be a “project metric”. Across projects this is a “process metric”. Within a single project this can also be a “project metric”. Across projects this is a “process metric”. Correctness Maintainability Integrity Usability Earned Value Analysis Defects found in this stage This Stage + Next Stage Severity of errors (1-5) MTTF (Mean time to failure) MTTR (Mean time to repair)

Can you calculate a metric that records the number of ‘e’ that appear in a program? A. Yes B. No Should you calculate the number of ‘e’ in a program? Should you calculate the number of ‘e’ in a program? A. Yes A. Yes B. No B. No These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001,

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Effective Metrics (ch 15) Simple and computable Simple and computable Empirically and intuitively persuasive Empirically and intuitively persuasive Consistent and objective Consistent and objective Consistent in use of units and dimensions Consistent in use of units and dimensions Programming language independent Programming language independent Should be actionable Should be actionable

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Actionable Metrics Actionable metrics (or information in general) are metrics that guide change or decisions about something Actionable: Measure the amount of human effort versus use cases completed. Actionable: Measure the amount of human effort versus use cases completed. Too high: more training, more design, etc… Too high: more training, more design, etc… Very low: maybe we can shorten the schedule Very low: maybe we can shorten the schedule Not-Actionable: Measure the number of times the letter “e” appears in code Not-Actionable: Measure the number of times the letter “e” appears in code Think before you measure. Don’t waste people’s time!

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Project Metrics used to minimize the development schedule by making the adjustments necessary to avoid delays and mitigate potential problems and risks used to minimize the development schedule by making the adjustments necessary to avoid delays and mitigate potential problems and risks used to assess product quality on an ongoing basis and, when necessary, modify the technical approach to improve quality. used to assess product quality on an ongoing basis and, when necessary, modify the technical approach to improve quality. every project should measure: every project should measure: Inputs —measures of the resources (e.g., people, tools) required to do the work. Inputs —measures of the resources (e.g., people, tools) required to do the work. Outputs —measures of the deliverables or work products created during the software engineering process. Outputs —measures of the deliverables or work products created during the software engineering process. Results —measures that indicate the effectiveness of the deliverables. Results —measures that indicate the effectiveness of the deliverables.

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Typical Project Metrics Effort/time per software engineering task Effort/time per software engineering task Errors uncovered per review hour Errors uncovered per review hour Scheduled vs. actual milestone dates Scheduled vs. actual milestone dates Changes (number) and their characteristics Changes (number) and their characteristics Distribution of effort on software engineering tasks Distribution of effort on software engineering tasks

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Metrics Guidelines Use common sense and organizational sensitivity when interpreting metrics data. Use common sense and organizational sensitivity when interpreting metrics data. Provide regular feedback to the individuals and teams who have worked to collect measures and metrics. Provide regular feedback to the individuals and teams who have worked to collect measures and metrics. Don’t use metrics to appraise individuals. Don’t use metrics to appraise individuals. Work with practitioners and teams to set clear goals and metrics that will be used to achieve them. Work with practitioners and teams to set clear goals and metrics that will be used to achieve them. Never use metrics to threaten individuals or teams. Never use metrics to threaten individuals or teams. Metrics data that indicate a problem area should not be considered “negative.” These data are merely an indicator for process improvement. Metrics data that indicate a problem area should not be considered “negative.” These data are merely an indicator for process improvement. Don’t obsess on a single metric to the exclusion of other important metrics. Don’t obsess on a single metric to the exclusion of other important metrics. Same as process metrics guidelines

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Typical Size-Oriented Metrics errors per KLOC (thousand lines of code) errors per KLOC (thousand lines of code) defects per KLOC defects per KLOC $ per LOC $ per LOC pages of documentation per KLOC pages of documentation per KLOC errors per person-month errors per person-month Errors per review hour Errors per review hour LOC per person-month LOC per person-month $ per page of documentation $ per page of documentation

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Typical Function-Oriented Metrics errors per Function Point (FP) errors per Function Point (FP) defects per FP defects per FP $ per FP $ per FP pages of documentation per FP pages of documentation per FP FP per person-month FP per person-month

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, But.. What is a Function Point? Function points (FP) are a unit measure for software size developed at IBM in 1979 by Richard Albrecht Function points (FP) are a unit measure for software size developed at IBM in 1979 by Richard Albrecht To determine your number of FPs, you classify a system’s features into five classes: To determine your number of FPs, you classify a system’s features into five classes: Transactions - External Inputs, External Outputs, External Inquires Transactions - External Inputs, External Outputs, External Inquires Data storage - Internal Logical Files and External Interface Files Data storage - Internal Logical Files and External Interface Files Each class is then weighted by complexity as low/average/high Each class is then weighted by complexity as low/average/high Multiplied by a value adjustment factor (determined by asking questions based on 14 system characteristics Multiplied by a value adjustment factor (determined by asking questions based on 14 system characteristics

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, But.. What is a Function Point? CountLowAverageHighTotal External Input x3x4x6 External Output x4x5x7 External Inquiries x3x4x6 Internal Logic Files x7x10x15 External Interface Files x5x7x10 Unadjusted Total: Value Adjustment Factor: Total Adjusted Value:

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Function Point Example

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Comparing LOC and FP Representative values developed by QSM

At IBM in the 70s or 80s (I don’t remember) they paid people per line- of-code they wrote What happened? What happened? A. The best programmers got paid the most A. The best programmers got paid the most B. The worst programmers got paid the most B. The worst programmers got paid the most C. The sneakiest programmers, got paid the most C. The sneakiest programmers, got paid the most D. The lawyers got paid the most D. The lawyers got paid the most These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001,

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Why Opt for FP? Programming language independent Programming language independent Used readily countable characteristics that are determined early in the software process Used readily countable characteristics that are determined early in the software process Does not “penalize” inventive (short) implementations that use fewer LOC that other more clumsy versions Does not “penalize” inventive (short) implementations that use fewer LOC that other more clumsy versions Makes it easier to measure the impact of reusable components Makes it easier to measure the impact of reusable components Other options: COCOMO, Planning Poker, SLIM, Story Points (remember Scrum?), many others… Other options: COCOMO, Planning Poker, SLIM, Story Points (remember Scrum?), many others…

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Object-Oriented Metrics Number of scenario scripts (use-cases) Number of scenario scripts (use-cases) Number of support classes ( Number of support classes (required to implement the system but are not immediately related to the problem domain) Average number of support classes per key class (analysis class) Number of subsystems (an aggregation of classes that support a function that is visible to the end-user of a system)

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, WebEngineering Project Metrics Number of static Web pages (the end-user has no control over the content displayed on the page) Number of dynamic Web pages (end-user actions result in customized content displayed on the page) Number of internal page links (internal page links are pointers that provide a hyperlink to some other Web page within the WebApp) Number of persistent data objects Number of external systems interfaced Number of static content objects Number of dynamic content objects Number of executable functions

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Measuring Quality Correctness — the degree to which a program operates according to specification Correctness — the degree to which a program operates according to specification Maintainability—the degree to which a program is amenable to change Maintainability—the degree to which a program is amenable to change Integrity—the degree to which a program is impervious to outside attack Integrity—the degree to which a program is impervious to outside attack Usability—the degree to which a program is easy to use Usability—the degree to which a program is easy to use Verified non-conformance with reqmts KLOC Verified non-conformance with reqmts KLOC MTTC Mean time to change: time to analyze, design, implement and deploy a change MTTC Mean time to change: time to analyze, design, implement and deploy a change threat probability security - likelihood of repelling attack Integrity =  1-(threat*(1-security)) E.g. t=0.25, s= > I=0.99 threat probability security - likelihood of repelling attack Integrity =  1-(threat*(1-security)) E.g. t=0.25, s= > I=0.99 Many options. See ch 12

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Defect Removal Efficiency DRE = E /(E + D) E is the number of errors found before delivery of the software to the end-user D is the number of defects found after delivery.

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Defect Removal Efficiency DRE = E /(E + D) Defects found during phase: Requirements (10) Design (20) Construction Implementation (5) Unit Testing (50) Testing Integration Testing (100) System Testing (250) Acceptance Testing (5) By Customer (10) 10 / ( ) = 33% 20 / ( ) = 28% 5 / (5 + 50) = 9% 50 / ( ) = 33% 100 / ( ) = 28% 250 / ( ) = 98% 5 / (5 + 10) = 33% 10 / ( ) = 33% What are the rest?

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Metrics for Small Organizations time (hours or days) elapsed from the time a request is made until evaluation is complete, t queue. effort (person-hours) to perform the evaluation, W eval. time (hours or days) elapsed from completion of evaluation to assignment of change order to personnel, t eval. effort (person-hours) required to make the change, W change. time required (hours or days) to make the change, t change. errors uncovered during work to make change, E change. defects uncovered after change is released to the customer base, D change.

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Establishing a Metrics Program Set Goals Identify your business goals. Identify what you want to know or learn. Identify your subgoals. Identify the entities and attributes related to your subgoals. Formalize your measurement goals. Determine indicators for goals Identify quantifiable questions and the related indicators that you will use to help you achieve your measurement goals. Identify the data elements that you will collect to construct the indicators that help answer your questions. Define Measurements Define the measures to be used, and make these definitions operational. Identify the actions that you will take to implement the measures. Prepare a plan for implementing the measures.

Metrics give you information! Metrics about your process help you determine if you need to make changes or if your process is working Metrics about your process help you determine if you need to make changes or if your process is working Metrics about your project do they same thing Metrics about your project do they same thing Metrics about your software can help you understand it better, and see where possible problems may lurk. Let’s see the complexity measurement (after a few questions…) Metrics about your software can help you understand it better, and see where possible problems may lurk. Let’s see the complexity measurement (after a few questions…) These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001,

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Questions What are some reasons NOT to use lines of code to measure size? What are some reasons NOT to use lines of code to measure size? What do you expect the DRE rate will be for the implementation (or construction) phase of the software lifecycle? What do you expect the DRE rate will be for the implementation (or construction) phase of the software lifecycle? What about for testing? What about for testing? Give an example of a usability metric? Give an example of a usability metric? According to the chart, Smalltalk is much more efficient than Java and C++. Why don’t we use it for everything? According to the chart, Smalltalk is much more efficient than Java and C++. Why don’t we use it for everything?