L4: GP TOOLS / 1 Asian Productivity Organization, Tokyo Brainstorming Idea 1 Supporting Idea 1 Extension to Idea 1 Opposing Idea 1 Idea 2 Idea 3 based.

Slides:



Advertisements
Similar presentations
Practical Aspects of Thorough and Effective Inspections.
Advertisements

TECHNICAL ANALYSIS.
PRODUCTION FUNCTIONAL MANAGEMENT Creation of utilities by converting raw material to final product by various scientific methods and regulations Very important.
Comparing Merchandising and Manufacturing Activities
Planning Production Activity Preview Planning Manufacturing Facilities Quantitative Tools in Production Planning Production Planning and Control Flexible.
L5: GP TECHNIQUES / 1 Asian Productivity Organization, Tokyo Organization of the GP Techniques.
Equipment and Facilities. 154 Plan Review The local health department must assess your facility and equipment before: –Beginning construction of a food.
Software and hardware complex of experimental plant for pulp and paper production Master student of MMA department : Anton Kaverin Perm National Research.
PLANT DESIGN (I) Prof. Dr. Hasan farag.
Treatment Plant Ozone Retrofit Program California Unified Program 8 th Annual Training Conference February 8, 2006 Presented by: Paul G. Beswick Metropolitan.
Problem Solving Tools INSY 3021 Auburn University Spring 2008.
Improving Productivity & Quality
ENVE 420 Industrial Pollution Control Wastewater Sources in an Industry Dr. Aslıhan Kerç.
Water Treatment Plant #3 Concentration Utilization at Water Treatment Plant #1.
1 Role of Information Technology in Water and Wastewater Management From Water Quality, Performance & Technical Information Management to Finance and Asset.
Key Elements of a Safe Water Supply An Adequate and Protected Water Source A Secondary Supply A Quality Treatment System An Adequate Finished Water Storage.
By : Jaime Medina Robles Mecatronics Engineering English 9 th Level Teacher: Alejandra Acosta.
Water Conservation in SMEs through Small and medium enterprise.
SchedulingProducingControllingSchedulingProducingControlling.
How to reduce water consumption and reduce costs
Lean and Clean—Friend or Foe? Great Lakes Regional Pollution Prevention Roundtable.
Food Manufacture Equipment and Unit Operations. Processing Equipment Food manufacturing plants contain equipment that carries out the same tasks as those.
Progress Report – Week 9 Section AC, Group 2 Presented by Andrew Amodei Teammates: David Bergsman, Michael Huang, Elizabeth Lam May 24 th, 2012.
FERTILISER QUALITY CONTROL AGRICULTURAL INFORMATICS DIVISION NATIONAL INFORMATICS CENTRE DEPARTMENT OF INFORMATION TECHNOLOGY MINISTRY OF COMMUNICATIONS.
My Coursework self help Edexel GCSE Design and Technology Food Technology Unit 1; Creative Design and Make Activities Controlled assessment 60% of your.
FLUID SYSTEMS Ecomax Industries: Plot No. F - 31, Ranjangaon MIDC
ECONOMIC RESOURCES Also called: Factors of Production and Economic Inputs.
Chapter 13 Area Allocation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand the concept.
Clean Air Act Section 111(d) Indiana State Bar Association Utility Law Section September 4, 2014 Thomas W. Easterly, P.E., BCEE Commissioner IN Department.
Technical Analysis. Technical analysis of a project idea includes an in depth study of all technical aspects related to Technical analysis of a project.
By : Jaime Medina Robles Mecatronics Engineering English 9 th Level Teacher: Alejandra Acosta.
Process Analysis CHAPTER 5. Learning Objectives 1. Recognize three basic types of processes: a serial flow process, parallel processes (such as what happens.
Water Treatment for the Recycling of Process Rinse Water
SchedulingProducingControllingSchedulingProducingControlling.
OVERVIEW OF TOOLS & TECHNIQUES: GREEN PRODUCTIVITY R. C. Monga 2nd World Conference on Green Productivity 10 December 2002.
Considerations and operational challenges in choosing Membrane Filtration for a Water Treatment Plant Upgrade Ed Cross Division Manager, Water Supply and.
Chapter 1 Introduction to Operations Management. Production and Operations Management Definition: Managing the activities involved in converting inputs.
TRIPARTITE PARTNERSHIP PROJECT Proposed Interventions for Ashaiman Pilot Project Improved WASH Services Delivery to Slums in Ashaiman.
Case Study 3.1 WP Inc MGMT 580 – Quality Management and Statistics Group 3: Cody Groves, Bruce Kastner, & Heather Moore.
SchedulingProducingControllingSchedulingProducingControlling.
Facility Design Issues. Back to the course objectives... Forecasting Strategic Planning Aggregate Production Planning Disaggregation Production Scheduling.
PROCESS DESIGN DEVELOPMENT
Desalination for Drinking Water Purposes TCEQ Trade Fair David A. Williams, P.E Robert W. Sims, P.E. Austin, Texas May, 2016.
Product Development Chapter 12. Vocabulary Research and development (R&D): the process of gathering information and using that information to develop.
FLOW CHART OF INDUSTRIAL PROCESSING
Welcome to American-Bath Wastewater Treatment Plant.
IIMM, Bangalore Branch1.  They are ;  1)PRODUCTION  a)Production of H.D.P.E Pipes  b)Production of Tanks  2)STORE  3)MAINTAINANCE  4)DAISPATCHING.
PRODUCTION MANAGEMENT
OPS 571 help / ops571helpdotcom
Effluent Treatment Plant. Introduction The effluent treatment plant (ETP) is a method that is used to treat the emanation coming out from many areas of.
Flowsheeting: What is a flowsheeet Importance of flowsheet
How Water Flows Through the Plant
Green Design Model Green Businesses Green Businesses Evaluation and
SOM 464 Manufacturing Resource Planning
Closed loop cooling system Plant closed loop cooling
What is a Process Flow Diagram (PFD)?
Process Design and Analysis
LOGISTIC AND THE TRANSPORT
Manufacturing Facilities Design and Analysis:
Chapter 5 Process Analysis.
Sources of water Rain Snow Water is needed for drinking Uses of water Water is needed for drinking.
A B C TOWER BLOCK TOOL KIT BLOCK TOWER TOOL KIT
Pre formulation study & requirement of raw material
Summer Training Industrial Engineering Department
Manufacturing Production Planning
Introduction to Business Lecture 35
Evaluating and Improving a Manufacturing System Mock Preparation
APPLICATION OF ROTO PUMPS IN
Chapter 5 Process Analysis.
SUSTAINABLE WATER AND ENERGY FOR MUNICIPALITIES
Presentation transcript:

L4: GP TOOLS / 1 Asian Productivity Organization, Tokyo Brainstorming Idea 1 Supporting Idea 1 Extension to Idea 1 Opposing Idea 1 Idea 2 Idea 3 based on 1 and 2 Supporting Idea 3 Idea 4

L4: GP TOOLS / 2 Asian Productivity Organization, Tokyo Flow Charts

L4: GP TOOLS / 3 Asian Productivity Organization, Tokyo Process Flow Diagram (PFD)

L4: GP TOOLS / 4 Asian Productivity Organization, Tokyo N ETP Finished Product Storage Raw Material Storage Manufacturing Process Line Prod. Capacity 10,000 product items per day Administrative Block Quality Control and Final Packaging Proposed Production line of capacity 10,000 product items per day Utilities Laboratories Toilet Block 30m Stack for emissions Central Highway 05 Main Entrance 100m100.5m101m Municipal Water Supply EntryExit 05 metres Scale m Plant Layout

L4: GP TOOLS / 5 Asian Productivity Organization, Tokyo Eco-maps

L4: GP TOOLS / 6 Asian Productivity Organization, Tokyo Eco-maps to identify problem areas

L4: GP TOOLS / 7 Asian Productivity Organization, Tokyo Concentration Diagrams Plating bath 1 Plating bath 2 Recovery tank Filter Work Jobs Cleaning area Location of spillage during each monitoring Problem Area