Rodent Research-1 POIWG #35 Splinter. ARC Rodent Research (RR) Points of Contact Mission Overview On-orbit Operations Rodent Research Flight Rules Off-Nominal.

Slides:



Advertisements
Similar presentations
APOLLO 13 Safety Message Bob Sieck Odyssey Spacecraft NASA Project Engineer April 1970.
Advertisements

CO₂ Euthanasia Procedure October AVMA Guidelines for the Euthanasia of Animals: 2013 Edition Small Laboratory rodents: mouse, rat, hamster, gerbil,
Rodent Habitat (RH) & Rodent Research (RR) Concept of Operations December 2013 ARC/Cecilia Wigley Rodent Research Operations Manager JSC/Brienne Shkedi.
Daniel Graves –Project Lead James Reepmeyer – Lead Engineer Brian Smaszcz– Airframe Design Alex Funiciello – Airfoil Design Michael Hardbarger – Control.
PErforM for work teams Insert presenters names and titles.
The Vision for Space Exploration – Challenge & Opportunity ISS Panel Report Robert D. Cabana ISS Panel Chair March 30, 2005.
Navigating SSEP Experiments from Selection to Flight SSEP National Conference 2012 July 2, 2012 Dr. Harri Vanhala National Center for Earth and Space Science.
DoD Information Technology Security Certification and Accreditation Process (DITSCAP) Phase III – Validation Thomas Howard Chris Pierce.
2013 NASA Safety and OH Directors’ Meeting Kennedy Space Center, FL 2013 NASA Safety and OH Directors’ Meeting Kennedy Space Center, FL “Moving Forward.
Chapter 15 Design, Coding, and Testing. Copyright © 2005 Pearson Addison-Wesley. All rights reserved Design Document The next step in the Software.
1 08 January 2015 Stephen Horan Cube Quest Kick-off: Communications Rules PI for Avionics Space Technology Mission Directorate.
LSU 10/09/2007System Design1 Project Management Unit #2.
AIRCRAFT HANDLING Part 4 Flight Preparation.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Release & Deployment ITIL Version 3
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Agenda Teams Responsibilities Timeline Homework and next steps.
David N. Wozei Systems Administrator, IT Auditor.
Transition to 6-person crew ASE conference, Praha Oct 8, 2009 Andreas Schön, ESA All dates used in this presentation are examples only, they do not necessarily.
1 Description and Benefits of JWST Commanding Operations Concept TIPS/JIM Meeting 17 July 2003 Vicki Balzano.
LSU 01/17/2006Spring LaACES Schedule For the semester and the next few weeks.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
DRP World Class Operations - Impact Workshop Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products.
03/11/021 Spaceport Vision Team Members. 03/11/022 Systems Definition Spaceport System Spaceport Stakeholder Needs High-Level Trade Study Performance.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
BSBCMN205A Use Business Technology Introduction 1 Select and Use Technology.
An Introduction to Transportation Systems
Communication, Navigation, and Networking reConfigurable Testbed (CoNNeCT): An International Space Station National Lab Ann P. Over Project Manager NASA.
Judges Score Card Overview Mark Turner NASA Ames Research Center.
Part 117 Flight and Duty Limitations and Rest Requirements: Flightcrew Members.
03/20/021 Spaceport Vision Team Members Organizations that contributed: Air Force NASA NCSS FAA Industry University Etc.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama BRIC-17 TIR Overview Aug 28, 2012 Tony Cox EO20.
Notes on this template You may reformat this to fit your design, but make sure you cover the information requested in this template. Presentations should.
Johnson Space Center, Houston TX Assembly and Disassembly Training Urine Monitoring System (UMS) 1 Familiarization Material for Assembly Task Training.
1 Columbus Control Center - Teams and Responsibilities - Roland Luettgens ESA Columbus Lead Flight Director Tel:
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
MSG Seal Replacement Mission Scenario Pre-Pack List (SOC OCR – ULF 1.1) MSG Front Window Exchange MSG Glove Rings & Feed- through Install MSG.
EMCS Facility Status Thomas Niedermaier. This document is the property of Astrium. It shall not be communicated to third parties without prior written.
1 Increment 1 Lessons Learned Many things are not happening as predicted. Major differences are: –Scheduling and stowage –Turnaround times for troubleshooting.
NanoRacks, LLC Michael D. Johnson (832) Page No. 1 NanoRacks, LLC Cube Lab Cube Lab Ops TIM – Cube Lab Introduction 11/19/2009 Michael D. Johnson.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Approved for Public Release; Distribution is Unlimited Ricardo Rodriguez.
Urine Monitoring System (UMS) ISS UMS is a redesigned version of the Shuttle UMS.
Note: The first status check should occur on the launch flight day prior to crew pre-sleep. This is the only feedback the Glacier team has that the Glacier.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Payload Systems.
Baseline Review 05/20/14 PARC/Martha Cash RapidScat EPF-SDX INSTALLATION-HEATERS ON ADAPTER and INSTRUMENT Crew Commanding Unattended Time Critical External.
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
1 Infrastructure Trial Running a Dress Rehearsal.
GRAVI2 POIWG #34, July 24 th 2013 Abdul Basit Mohammad N-USOC-NOT-ABM-028, Abdul Basit Mohammad1.
NON-PROPRIETARY July NASA Ames Research Center ARC ISS Utilization Office Cell Bio Tech Demo Payload Overview POIWG MSFC July 25, 2012.
JAXA Rodent Experiment Requirements Futoshi MATSUNAGA (JAXA IS)
National Aeronautics and Space Administration Fruit Fly Lab – 01 Op TIM Payload Team Kevin Martin Matthew Lera Sharmila Bhattacharya Zhe Lu Ops Lead Crissy.
Lisa Prendergast EO20/ Operations Lead January
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama ISS HAM TIR OVERVIEW (Kenwood in SM only) Kathy.
NASA – MSFC, Huntsville, Alabama Muscle Atrophy Research and Exercise System (MARES) Operations Summary Part I/II Karen Somers EO20/ Operations Lead
ESA Payload Operations Overview: MSL August 07, 2009 / POIC-MSFC.
Payload Operations and Integration Center MSFC Daily Summary for PDs.
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Ground Powerup 1 1.Scheduled by OCR. 16:00 GLACIER#-DNLK-CMD GLACIER#-HW-DRY GLACIER#-HW-PWR.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
CPCG-HM Overview POIWG July 26, 2012 Brittney Macon 1.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Radiation Environment Monitor Kevin Hargrave EO
MOL Mission Operations Laboratory MOL Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Increment 12 On-Orbit Operations.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Japanese Experiment Module (JEM) Airlock Overview Jimmy Whitaker ISS.
Payload Inventory Management & Stowage Operations Processes 10/19/99 Point of Contact Gordon Boswell MSFC/POIF/OI (256)
Adopting the Python language for On-board Programmable Payload Autonomy Steven Doran 2016 Flight Software Workshop 12/14/2016.
Knowing When to Stop: An Examination of Methods to Minimize the False Negative Risk of Automated Abort Triggers RAM XI Training Summit October 2018 Patrick.
Presentation transcript:

Rodent Research-1 POIWG #35 Splinter

ARC Rodent Research (RR) Points of Contact Mission Overview On-orbit Operations Rodent Research Flight Rules Off-Nominal Overview POIWG #35 (January 30,2014)NASA Ames Research Center2 Agenda

POIWG #35 (January 30,2014)NASA Ames Research Center3 RR Points of Contact Cecilia Wigley NASA RR Operations and Integrations Lead Marla Smithwick Lockheed RR Operations Lead Ann Kapusta Lockheed RR Operations Engineer Ryan Fisher Lockheed RR Operations Engineer

POIWG #35 (January 30,2014)NASA Ames Research Center4 Mission Overview Rodent Research 1 has two different investigations using a total of 20 mice – NASA (10 mice) Objectives: – Validate hardware can deliver and maintain healthy animals – On-orbit activities can be performed – Assess RNA quality in fixed samples (spleen) – Perform biochemical quality of frozen samples (liver) – Compare carcass weights to the body weights of mice prior to launch – CASIS (10 mice) The CASIS experiment flies two different strains of mice: – 5 mice lack a gene involved in muscle wasting (Knockout (KO)) – 5 mice are control mice (Wild Type (WT)) Objectives: – Evaluate muscle atrophy under microgravity conditions – Focuses on the lower limbs (hindlimbs) – Assess molecular changes

POIWG #35 (January 30,2014)NASA Ames Research Center5 On-Orbit Operations The objectives for both investigations on RR1 will be accomplished on an 30 day (approximate) mission RR1 will launch on SpX4 with samples and hardware returning on SpX4 and SpX5 All twenty mice will launch in 1 Transporter on SpX4 and will be transferred to 2 Habitats (10 mice each) for 30 day habitation on-orbit All RR1 activities required 60 hours of crewtime – Currently scheduled for Increment 39/40 – Requires 2 crew members (Swanson, Wiseman)

POIWG #35 (January 30,2014)NASA Ames Research Center6 RR1 On-Orbit Timeline

POIWG #35 (January 30,2014)NASA Ames Research Center7 On-Orbit Sessions (1 of 5) Animal Transfer SchedulingNo later than 48 hours from Dragon hatch opening No later than 10 days from animal load into Transporter Crew Time4.5 Hours Number of Crew2 DescriptionUsing the Access Unit 20 mice will be transferred from the Transporter into two Habitats. Each Habitat will have 10 mice, five 5 per side. CASIS mice will be sorted based on ear notching. Water Check Scheduling3 days after Animal Transfer and every 3 days thereafter for a total of 4 water checks Crew Time20 Minutes Number of Crew1 DescriptionCrew member checks for obvious signs of water box leak/failure

POIWG #35 (January 30,2014)NASA Ames Research Center8 On-Orbit Sessions (2 of 5) MSG Setup SchedulingASAP after Animal Transfer Crew Time1 Hour Number of Crew1 DescriptionDestow RR1 support hardware Setup the MSG for dissection operations Practice Session SchedulingWithin 5 days of the CASIS Dissection operations Crew Time2 Hours Number of Crew2 DescriptionTime allocated to allow crewmembers to practice dissection operations in the MSG using no live animals

POIWG #35 (January 30,2014)NASA Ames Research Center9 On-Orbit Sessions (3 of 5) CASIS Dissection (Day 1) SchedulingMinimum 21 days on-orbit As close as possible to SpX 4 return Crew Time6.5 Number of Crew2 Description2 KO mice euthanized and dissected (morning) 3 WT mice euthanized and dissected (afternoon) CASIS Dissection (Day 2) SchedulingWithin 3 days of CASIS Dissection (Day 1) Crew Time6.5 Number of Crew2 Description2 WT mice euthanized and dissected (morning) 3 KO mice euthanized and dissected (afternoon)

POIWG #35 (January 30,2014)NASA Ames Research Center10 On-Orbit Sessions (4 of 5) Tissue Transfer SchedulingCASIS Dissection + 48 Hours (± 6 hours) NASA Dissection + 2 days-2 weeks [Spleen only] Crew Time1.5 Hours (repeated once) Number of Crew1 DescriptionHindlimb samples fixed in formalin must be transferred to ethanol Spleen samples will be transferred to -95C MELFI (one day only) NASA Dissection and Euthanization Scheduling30-32 days from Animal Transfer After SpX4 Undock Crew Time6.5 Hours Number of Crew2 Description2 mice are euthanized and dissected 8 mice are euthanized

POIWG #35 (January 30,2014)NASA Ames Research Center11 On-Orbit Sessions (5 of 5) Habitat Stow SchedulingA minimum of 5 days after animals are removed Crew Time1 Hour Number of Crew1 DescriptionDouble bag and stow Habitats for return on SpX4 or SpX5 MSG Clean-Up SchedulingAfter all Rodent activities with live animals are completed Crew Time1 Number of Crew1 DescriptionRemove and clean all RR1 hardware from MSG and clean

LSAH setup in the MSG is scheduled to be done prior to SpX4 docking Crew briefings/procedure reviews are scheduled before every major activity CASIS Habitat might not be powered for the full 5 days after dissection in order to ensure the Habitat comes down on SpX4 EVAs – Best effort should be made to plan payload operations such that they will not affect EVAs – Concern from flight surgeon that potential mouse bite from RR operations could affect crew’s ability to participate fully in EVA – No documented constraints from flight surgeon on RR Operations in relation to EVA activities POIWG #35 (January 30,2014)NASA Ames Research Center12 Other Scheduled Items

POIWG #35 (January 30,2014)NASA Ames Research Center13 Flight Rules 1.All animals must be transferred out of the Transporter within 10 days of loading 2.If the EXPRESS Laptop Computer (ELC) crashes during crew sleep and cannot be restarted by ground crew, the crew will be woken up to restart the ELC or move to safe haven within 2 hours 3.If rack power goes down and cannot be resolved within 2 hours, the Habitat(s) will have to be transferred to the safe haven locations 4.In the event of a hardware failure which may affect animal welfare, the crew will be required to respond within a 12 hours 5.If the chief veterinarian determines an animal is distressed, the animal must be euthanized within 24 hours of identification 6.The CASIS animals (n=10) must all be euthanized and processed within 3 days 7.SPHERES payload must not operate in the same module as live animals 8.Once the Transporter and Habitats have had animals in them the Access Unit must be attached any time the unit lids are opened 9.The MSG must be available at all times when live animals are on-board to allow for euthanization of distressed animal on short notice

POIWG #35 (January 30,2014)NASA Ames Research Center14 Payload Regulations 1.Neither the Transporter nor the Habitats shall go longer than 30 minutes without power during nominal operations when animals are inside 2.The MSG will be setup with the LSAH prior to vehicle docking with animals

PRO Off-Nominal Inputs Off-Nominal Categorization – Heat Map – Category Definitions – Off-Nominal List (ONL) Impacts to PRO POIWG #35 (January 30,2014)NASA Ames Research Center15 Off Nominal Overview

Rack Power Failure – PRO had 2 hours for troubleshooting without any effect on animal welfare – If after 2 hours, problem could not be resolved the unit(s) should be moved to Safe Haven location Requires crew member activity May result in having to wake the crew – Payload Team should be informed immediately upon loss of power Station Power Failure/Load Shed – 12 hour maximum to allow for troubleshooting – Contact Payload Team immediately to discuss possible resolutions – After 12 hours, animals may have to be processed/euthanized POIWG #35 (January 30,2014)NASA Ames Research Center16 PRO Off-Nominal Input

POIWG #35 (January 30,2014)NASA Ames Research Center17 Off-Nominal Heat Map

Impact Range: Category Description:Rational for impact:Response Implications: 5 Loss of immediate life support (power, fans, software) [Loss: Specimen Life, Infrastructure, Crew Time] Lack of air circulation in 0G can result in asphyxiation of animals Unknown timeline for possible asphyxiation (30min – 12 hours); situation involves Immediate: trouble shooting, Intermediate: Monitoring, Ultimately: decision to terminate of experiment 4-3 Loss of intermediate life support (water, distressed animals) Stressed animals or interruption of water services can result in an unsustainable environment Immediate action not necessary; intermediate trouble shooting; ultimately determine corrective action or termination of experiment 2 Loss of secondary support capabilities (video monitoring, communications, habitat lights, operational flow) Loss of secondary services can result in an sustainable environment that increase impact to crew time Immediate action not necessary; intermediate trouble shooting; ultimately determine corrective action or termination of experiment 1Loss of tertiary support capabilities (disposable glove bag, etc) Loss of tertiary services can result in an sustainable environment that could increase impact to crew time Immediate action not necessary; intermediate trouble shooting; ultimately determine corrective action or termination of experiment POIWG #35 (January 30,2014)NASA Ames Research Center18 Off-Nominal Categories

POIWG #35 (January 30,2014)NASA Ames Research Center19 Off-Nominal Events (1 of 2) * Schedule impact items marked with an asterisk may require activities to be rescheduled or may need additional/ unplanned crew time for resolution

POIWG #35 (January 30,2014)NASA Ames Research Center20 Off-Nominal Events (1 of 2) * Schedule impact items marked with an asterisk may require activities to be rescheduled or may need additional/unplanned crew time for resolution

PRO Actions: – ONL ID 4: Habitat Loss of Fan (all 4 fans) – ONL ID 7: Habitat Loss of Power – ONL ID 16 & 19: Software Program Frozen or Loss of Communication – ONL ID 10 & 17: Temperature Telemetry Lost or Out of Limits All entail a PRO initiated Power Reset – If Power Reset does not resolve issue PRO to contact Payload Team to initiate secondary contingency Currently vetting telemetry ranges based on animal test data All other Off-Nominal Events can be handled by the Payload Team during business hours and may include PRO participation POIWG #35 (January 30,2014)NASA Ames Research Center21 MSFC Ops Center Impacts