1 Back-Of-Crate : BOC Status Oct, 2002 BOC is the optical fibre interface for the ROD Receives module control data from ROD, performs clock-data encoding,

Slides:



Advertisements
Similar presentations
02/06/2014James Leaver Slink Transition Card. 02/06/2014James Leaver Slink Transition Card Simple 6U board: –Provides interface between FED and Slink.
Advertisements

Questionnaire Response
GCT Source Card Status John Jones Imperial College London
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
IEEE10/NSS R. Kass N A. Adair, W. Fernando, K.K. Gan, H.P. Kagan, R.D. Kass, H. Merritt, J. Moore, A. Nagarkar, S. Smith, M. Strang The Ohio State.
Richard Kass IEEE NSS 11/14/ Richard Kass Radiation-Hard ASICs for Optical Data Transmission in the ATLAS Pixel Detector K.E. Arms, K.K. Gan, M.
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Uli Schäfer JEM Status and plans Hardware status JEM0 Hardware status JEM1 Plans.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
Cluster Processor Module : Status, test progress and plan Joint Meeting, Mainz, March 2003.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
Opto Harness FDR 19/10/01 T. Weidberg1 Opto Harness FDR Scope and aims of review, system overview Available documentation Status of Project & Schedule.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Target Controller Electronics Upgrade Status P. Smith J. Leaver.
Production and Testing Status V. Fisch, T. Kiss, T. Tölyhi, V. Veszprémi BPIX Supply Tube Electronic Boards.
LightABLE Production Status ID Week October 2014 Tony Weidberg1.
Fabrication & Assembly of Opto-Rx12 Modules for CMS- Preshower S. K. Lalwani Electronics Division Bhabha Atomic Research Centre Mumbai –
U niversity of S cience and T echnology of C hina Design for Distributed Scheme of WCDA Readout Electronics CAO Zhe University of Science and Technology.
David Nelson IBL Data & TTC Transmission Baseline February 25, IBL Data and TTC Transmission Baseline Presented by David Nelson
R. KassIEEE05/Puerto Rico N Radiation-Hard Optical Link for the ATLAS Pixel Detector Richard Kass The Ohio State University W. Fernando, K.K. Gan,
R. KassIEEE04/Rome 1 Radiation-Hard ASICs for Optical Data Transmission in the ATLAS Pixel Detector Richard Kass The Ohio State University K.E. Arms, K.K.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Pixel Upgrade Plans ROD/BOC PRR July 17, 2013 T. Flick University of Wuppertal.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
ATLAS Pixel Upgrade Phase 0 (IBL) ACES Workshop , CERN T. Flick University Wuppertal for the IBL collaboration.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
David Cussans, AIDA/CALICE DAQ Palaiseau, 10 Nov 2011 Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Etam Noah, CERN15 th September 2004Qualification of the CMS Digital Optohybrid Outline: CMS optical digital control links DOH components DOH history and.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
FED Overview VME-FPGA TTCrx BE-FPGA Event Builder Buffers FPGA Configuration Compact Flash Power DC-DC DAQ Interface 12 Front-End Modules x 8 Double-sided.
Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory28 March 2003 FED Project Plan 2003 FED Project aiming to satisfy 2 demands/timescales: Module.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
Optical Readout and Control Interface for the BTeV Pixel Vertex Detector Optical interface for the PCI board –1.06 Gbps optical link receiver –Protocol.
Michał Dwużnik, for the SCT collaboration
1 ATLAS Lehman Review, Silicon ROD Douglas Ferguson, Richard Jared, John Joseph and Lukas Tomasek Wisconsin May 21 to May 23, 2003.
July 17, 2013 CERN T. Flick University of Wuppertal.
Bart Hommels (for Matthew Wing) EUDET ext. steering board JRA3 DAQ System DAQ System Availability updates: – DIF: Detector Interface – LDA:
DPF 2011 R. Kass 1 P. Buchholz, A. Wiese, M. Ziolkowski Universität Siegen OUTLINE Introduction Result on 4-channel Driver/Receiver with Redundancy Design.
Implementing a 10 Gb/s VCSEL Driven Transmitter for Short Range Applications Irfan N. Ali Michael C. Clowers David S. Fink Sean K. Garrison Jeff A. Magee.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
SRS Trigger Processor Option Status and Plans Sorin Martoiu (IFIN-HH)
24th October 2003 M. Noy, Imperial College London0 M. Noy FED Project Status.
1 Preparation to test the Versatile Link in a point to point configuration 1.Versatile Link WP 1.1: test the Versatile Link in a point to point (p2p) configuration.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory30 July 2001 CMS Tracker FED CMS Tracker System.
Opto Working Group Meeting Summary Tuesday 8 March 2011 Tobias Flick and Francois Vasey.
Standard electronics for CLIC module. Sébastien Vilalte CTC
1 Status report on the LAr optical link 1.Introduction and a short review. 2.The ASIC development. 3.Optical interface. 4.Conclusions and thoughts Jingbo.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
LECC2003: The 96 Chann FED Tester: Greg Iles30 September The 96 channel FED Tester Outline: (1) Background (2) Requirements of the FED Tester (3)
SCT Links Operation Performance from QA and operation
Next generation rad-hard links
Old ROD + new BOC design plans
BOC1 Run Thru: Agenda 14h30 Start CB Local Meeting 16h00 Break for Tea
Presentation transcript:

1 Back-Of-Crate : BOC Status Oct, 2002 BOC is the optical fibre interface for the ROD Receives module control data from ROD, performs clock-data encoding, sends down fibres Receives module data on fibres, and formats data for the ROD input Provides individual data delays and other timing functions Houses the S-Link interface Overview BOC prototype, (BOC-0 ): BOC-0 was the proof-of-principle board Testing showed: Communication with ROD works fine TX: Clock and Command stream OK RX: Data Stream OK Eye pattern good Timing measurement procedure OK De-muxing of PIXELS 80 MS/s data demonstrated

2 BOC1: BOC1 is the pre-production prototype: Uses production compatible components Should move seamlessly into production Changes from BOC0: A (remarkably small) number of PCB fixes Reduce PCB depth to 220 mm (was 240 mm) Add Power Monitor and Power-up Reset Major Revision of Clock Circuits: PLL with fail-safe provisions Increase range of fine clock delay to 10ns in 10ps steps All PECL & LVDS implementation (other then delay chips) Should give reduced short-term jitter and guaranteed mark-space All RX streams to have Pixel data de-muxing ability Move to New OptoElectronics and ASICs: see later slide Back-Of-Crate : BOC Status Oct, 2002

3

4 BOC1 Data RX Section Clock S-Link Clock & Command

5 New Opto and ASICs VCSEL12 and PIN12 arrays by Academica Sinica of Taiwan: BPM12 Clock/Data Encoder/Driver - MAJOR rework of BPM4: 12 streams rather than 4 Drives common cathode lasers Many other improvements DRX12 Receiver already a proven component New Opto Plug-In Modules by Academica Sinica: Optical Transmitter Plug-In “OptoTX”: BPM12 + VCSEL12 + DACs for I Control 12 streams per module 4 modules per BOC - providing 48 fibre drivers per BOC Optical Receiver Plug-In “OptoRX” : DRX12 + PIN12 + Threshold DACs 12 streams per module 8 modules per BOC - providing 96 fibre receivers per BOC New versions with Samtec connector being designed - more rugged, easier to assemble and use Back-Of-Crate : BOC Status Oct, 2002

6 BOC1 Status: PCB manufactured (11 off) Parts delivered (for 11 BOCs) (excluding optical modules) First board assembled and extensively tested 3 more assembled, ready for test (Cambridge, LBL & Oxford) Received 5 TX & 4 RX Opto Plug-Ins 10 TX & 10 RX Opto Plug-Ins with new connector awaited Fabrication limited by lack of optical modules Testing: The optical clock and command path functioning OK The optical received data path functioning OK The pixel specific part of the BOC1 yet to be tested. Combined tests of ROD-with-BOC0 driving single SCT detector module well advanced ROD-with-BOC1 work about to be started at Cambridge & LBL Back-Of-Crate : BOC Status Oct, 2002

7 Delay Chip Circuit Changes BOC uses 26 PHOS4 Quad Programmable Delay chips (designed by CERN Micro-Electronics Group) for Data alignment and for Clock Generation. These work very well, and are indispensable. But under some circumstances the chips’ delay-locked-loop can get in an anomalous state, yielding around twice the expected delays. A method of forcing them out of this state has been found. A number of simple BOC design changes are planned: Added circuitry to allow the delivered delays to be measured Clock circuitry change to provide the “Remedial Action” on demand Control circuitry change to implement the dummy I2C Reset recommended in the PHOS4 data sheet shortly after power-up Back-Of-Crate : BOC Status Oct, 2002

8 Immediate Schedule: A number of circuit changes - mostly very minor - are planned; none invalidate the use of the existing BOC1 for Atlas development and commissioning work The 11 BOC1 cards will be populated as required, and are expected to meet Atlas needs until Spring 2003 Small numbers (~20) of Opto Plug-Ins will suffice until late ‘02 A converter card will be made to use the new, connectorized Opto Plug_Ins on the current 11 BOC1 cards. Back-Of-Crate : BOC Status Oct, 2002 Moving to the Production Version: The Artwork will be upgraded as soon as the fibre retention and laser safety interlock details have been decided. Other changes will probably arise from the User Evaluation. New PCBs manufactured after User Evaluation and Review Plans