Proton Driver Status Bob Kephart Proton Driver Physics Workshop Oct 6, 2004.

Slides:



Advertisements
Similar presentations
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
Advertisements

Plans for a Proton Driver Bob Kephart January 12, 2004.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
Here’s What I Won’t Talk About Enrico Fermi’s (1954) Space-Based World Machine Bill Foster Sulak Festschrift October 22, 2005.
1 M. Popovic NFMC Collaboration Meeting IIT Muon (Pre)Acceleration for 8 GeV Proton Driver Linac Milorad Popovic FNAL 14-March.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Fermilab Implementation of DOE Critical Decision Process FRA Project Management System Presentation by L Edward Temple Jr Head, Office of Project Management.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
ANL-FNAL Collaboration on High Intensity Neutrino Source Activities G. Apollinari Introduction Collaboration Activities ‘05-’07 Achievements ’07-’10 Plans.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
F Project X Overview Dave McGinnis October 12, 2007.
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Driver Status Bob Kephart August 25, 2004.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
Proton Driver Main Linac Parameter Optimization G. W. Foster Proton Driver General Meeting Jan 19, 2005.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Fermilab Proton Driver Project Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim,
Jan 12, 2005G.W.Foster - Proton Driver General Meeting Proton Driver General Meeting Kick-off Presentation G. W. Foster PD General Weekly Meeting Jan 12,
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
DTL Option for MEIC Ion Injection Jiquan Guo, Haipeng Wang Jlab 3/30/
Proton Driver Resources & Schedule (R&D Plan) Rich Stanek May 10, 2005.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
Project X RD&D Plan 325 MHz Linac including High Intensity Neutrino Source (HINS) Program Bob Webber AAC Meeting February 3, 2009.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Fermilab SRF Linac Development Steve Holmes Workshop on High Intensity Proton Accelerators October 19, 2009.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
U.S. Plans for High Power Proton Drivers Steve Holmes Fermilab Workshop on Physics with a Multi-MW Proton Source CERN May 25, 2004.
The Fermilab Roadmap, Project X, and Muon Facilities Steve Holmes NFMCC Meeting March 17, 2008.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
Accelerator Division View Sergei Nagaitsev DOE Independent Project Review of PIP-II 16 June 2015.
Project X/ILC/SRF Integrated Plan Steve Holmes Fermilab DOE Annual Science & Technology Review July 12-14, 2010.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Welcome! Robert Zwaska 23 November 2015 Workshop on Booster Performance and Enhancements.
Steve Holmes DNP Meeting/Santa Fe November 6, 2010 Project X: A Multi-MW Proton Source at Fermilab.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
UK Neutrino Factory Conceptual Design
Head, Office of Project Management Oversight (OPMO)
Muon Acceleration using 8 GeV Proton Driver Linac
Superbeams with SPL at CERN
XFEL Project (accelerator) Overview and recent developments
Introduction to Jefferson Lab
LAL meeting on e+ studies, Oct. 2010
The SPL-based Proton Driver at CERN
SNS-PPU upgrades the existing accelerator structure
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

Proton Driver Status Bob Kephart Proton Driver Physics Workshop Oct 6, 2004

Fermilab Technical Division Oct 6, 2004Proton Driver Physics Workshop2 Outline Fermilab Long Range Plan –Linear Collider and Proton Driver recommendations –PD Working Group Considerations –Proton Driver studies (Synchrotron, SCRF LINAC ) Charge to Proton Driver Leadership Recent Developments –R&D funding –ITRP recommendation vs PD Timescale –DOE approval process –Technically limited schedule vs funding limited schedule Conclusions

Fermilab Technical Division Oct 6, 2004Proton Driver Physics Workshop3 Fermilab: Long Range Plan The Fermilab Director established the Fermilab Long Range Planning Committee (FLRPC) in the spring of Excerpt from the charge to the LRP committee: “ I would like the Long-range Planning Committee to develop in detail a few realistically achievable options for the Fermilab program in the next decade under each possible outcome for the linear collider. ….“ It was clear from the start that a new intense proton source to serve long baseline neutrino experiments and to provide other new physics options at Fermilab was one such option… A FLRPC working group was charged to explore this option. (RDK chairman) We made recommendations to the full LRP committee that were subsequently adopted in the final FLRPC report

Fermilab Technical Division Oct 6, 2004Proton Driver Physics Workshop4 The Fermilab Long Range Plan The committee report is available at: The vision expressed in that report is that Fermilab will remain the primary site for accelerator-based particle physics in the U.S. in the next decade and beyond. –As host to a linear collider Fermilab would be established as a world center for the physics of the energy frontier for decades. –If the linear collider is constructed elsewhere, or delayed, Fermilab would strive to become a world center of excellence in neutrino physics, based on a (SClinac) multi-MW “Proton Driver”, still with significant LC participation. Fermilab is pursuing linear collider and proton driver R&D in parallel. The cold decision allows close alignment of these paths.

Fermilab Technical Division Oct 6, 2004Proton Driver Physics Workshop5 PD Working Group: Several studies have had the goal of understanding the limitations of the existing source and suggesting upgrades Proton Driver Design Study I: –16 GeV Synchrotron (TM 2136) Dec 2000 Proton Driver Design Study II (draft TM 2169) :  8 GeV Synchrotron May 2002  2 MW upgrade to Main Injector May 2002  8 GeV Superconducting Linac: Feb 2004 Proton Team Report (D Finley): Oct 2003 –Report: –Limitations of existing source, upgrades for a few 10’s of $ M. –“On the longer term the proton demands of the neutrino program will exceed what reasonable upgrades of the present Booster and Linac can accommodate  FNAL needs a plan to replace its aging LINAC & Booster with a new more intense proton source (AKA a Proton Driver) Reviewed PD Physics Case and Various Studies of the FNAL Proton Source

Fermilab Technical Division Oct 6, 2004Proton Driver Physics Workshop6 Proton Driver Studies The linac and booster are “old” and will need to be replaced “soon” Desire for intense proton sources for long baseline neutrino physics High Level Parameters – MW beam power at 8 Gev –2.0 MW beam power at 120 GeV –6 x power of current Main Injector Two Possible implementations –8 GeV Synchrotron –8 GeV SCRF Linac FLRPC: Linac is preferred –Better performance –Flexibility –LC connection (TESLA technology)

Fermilab Technical Division Oct 6, 2004Proton Driver Physics Workshop7 PD: 8 GeV SC Linac Design concept originated with Bill Foster at FNAL –Observation: $/ GeV for SCRF has fallen dramatically  Can consider a solution in which H- beam is accelerated to 8 GeV in a SC linac and injected directly into the Main Injector Why an SCRF Linac looks attractive: –Probably simpler to operate vs. two machines (i.e. linac + booster) –Produces very small emittances vs. a synchrotron (small halo & losses in MI) –Can delivers high beam power simultaneously at 8 & 120 GeV –Many components exist (fewer parts to design vs new booster synchrotron) Use “TESLA” klystrons, modulators, and cavities/Cryo modules Exploit development/infrastructure from RIA, SNS, JLAB, JPARC etc –Can be “staged” to limit initial costs & grow with neutrino program needs Following the FLRPC recommendations FNAL started an effort to develop the SCRF linac design … ( cost is an issue ) Such a machine might have many different missions  growth potential for the future if the Physics case exists…

Fermilab Technical Division Oct 6, 2004Proton Driver Physics Workshop8 8 GeV Superconducting Linac ~ 700m Active Length 8 GeV Linac X-RAY FEL LAB 8 GeV neutrino Main MW Anti- Proton SY-120 Fixed- Target Neutrino “Super- Beams” NUMI Off- Axis & Long-Pulse Spallation Source Neutrino Target Neutrinos to “Homestake” Short Baseline Detector Array Target and Muon Cooling Channel Bunching Ring Recirculating Linac for Neutrino Factory VLHC at Fermilab Damping Rings for FNAL With 8 GeV e+ Preacc. 1% LC Systems Test

Fermilab Technical Division Oct 6, 2004Proton Driver Physics Workshop9 Baseline 2 MW 8 GeV LINAC DTL 1DTL 2DTL 3DTL 4DTL5DTL6RFQ Modulator (7 total) 325 MHz Klystrons 2.5 MW H - B=0.47 B=0.61 B=0.81 Modulator Warm Copper Drift Tube Linac 325 MHz MeV Beta=1 Modulator Beta=1 Modulator 12 cavites/ Klystron 1300 MHz Beta=1 36 Klystrons (2 types) 31 Modulators 10 MW ea. 7 Warm Linac Loads 48 Cryomodules 384 Superconducting Cavities 8 GeV 2 MW LINAC Squeezed Tesla cavities 1300 MHz GeV "TESLA" LINAC 24 Klystrons 288 cavites in 36 Cryomodules 5 TESLA Klystrons, 10 MW each 96 cavites in 12 Cryomodules

Fermilab Technical Division Oct 6, 2004Proton Driver Physics Workshop10 Linac Cost Optimizations & Options Staging: Extend Klystron Fanout 12:1  36:1 –Drop beam current, extend pulse width –Drop rep. rate  avg. 8-GeV power 2 MW  0.5 MW –But… still delivers 2 MW from MI at 120 GeV with existing MI ramp rates SCRF Front End? (using RIA Spoke Resonators) Assumed Gradients for TESLA cavities: –Baseline 5 GeV linac by assuming TESLA 500 gradients, –Deliver 8 GeV linac by achieving TESLA 800 gradients. 384 Cavities  240 cavities ; Linac Length: 650m  400

Fermilab Technical Division Oct 6, 2004Proton Driver Physics Workshop11 Staged:2 GeV &.5 FE RFQ Modulator H - B=0.47 B=0.61 B=0.81 Modulator "Pulsed RIA" SCRF Linac 325 MHz MeV Beta=1 Modulator 11 Klystrons (2 types) 11 Modulators 20 MW ea. 1 Warm Linac Load 54 Cryomodules ~550 Superconducting Cavities 8 GeV 0.5 MW LINAC 8 Klystrons 288 cavites in 36 Cryomodules 2 Klystrons 96 cavites in 12 Cryomodules Beta=1 Modulator Multi-Cavity Fanout at 10-20kW/cavity Phase & Amplitude Adjust via Fast Ferrite Tuners TESLA Klystrons 1300 MHz 10 MW 325 MHz Klystron 3.0 MW

Fermilab Technical Division Oct 6, 2004Proton Driver Physics Workshop MHz RF System JPARC ~RIA ~TESLA TTF

Fermilab Technical Division Oct 6, 2004Proton Driver Physics Workshop13 Main Injector Upgrades For either choice of 8-GeV injector (synchrotron or SCRF linac) the beam in the Main injector will increase by a factor of ~ 5 from its design value of 3.0 E 13 protons per pulse to ~1.5 E 14 The main injector beam power can also be increased by shortening the MI ramp time. –Requires additional magnet power supplies –Could be done prior to a Proton Driver as a 1 st step More protons/cycle and/or faster ramp times  more MI RF power required = $$$ But shorter ramp time  beam power goes up.

Fermilab Technical Division Oct 6, 2004Proton Driver Physics Workshop14 Baseline Proton Driver & MI 0.8 sec cycle

Fermilab Technical Division Oct 6, 2004Proton Driver Physics Workshop15 Comparison of PD options My conclusions: The SCRF Linac PD is more likely to deliver the desired performance, is more “flexible” machine than the synchrotron based PD, and has more “growth” potential RDK unofficial

Fermilab Technical Division Oct 6, 2004Proton Driver Physics Workshop16 Synergies with other Projects Principal Mission: Proton superbeams for Neutrinos –8 GeV or 120 GeV from MI (NUMI/Off-axis) –Other Physics missions ? (We need to make the case) Synergy with many other SCRF projects –CBEAF upgrades, SNS, RIA, light sources, eRHIC, etc Strong connection with a Cold Technology LC –Both require extensive SCRF infrastructure development –SCRF PD could be made to accelerate electrons –Proton Driver ~ 1% of a LC => improve the LC cost estimate –Can be used to study reliability and alignment issues –With a low emittance source  LC beam studies –Possibly serve as part or all of a LC ETF –All of this can happen while the LC project is trying to organize complex international agreements and funding

Fermilab Technical Division Oct 6, 2004Proton Driver Physics Workshop17 FLRP PD Recommendations We recommend that Fermilab prepare a case sufficient to achieve a statement of mission need (CD-0) for a 2 MW proton source (Proton Driver). We envision this project to be a coordinated combination of upgrades to existing machines and new construction. We recommend that Fermilab elaborate the physics case for a Proton Driver and develop the design for a superconducting linear accelerator to replace the existing Linac-Booster system. Fermilab should prepare project management documentation including cost & schedule estimates and a plan for the required R&D. Cost & schedule estimates for Proton Driver based on a new booster synchrotron and new linac should be produced for comparison. A Technical Design Report should be prepared for the chosen technology.

Fermilab Technical Division Oct 6, 2004Proton Driver Physics Workshop18 PD Status and Plans  Charge by Director to Bill Foster, Steve Geer to prepare CD0 documentation by ~ Jan 05  FLRPC meetings  machine design & physics meetings ‒ AD,TD, PPD all have significant involvement ‒ Meeting include: ‒ PD Physics working groups ‒ RF design and Beam dynamics ‒ PD Cryogenics issues ‒ Civil and Siting ‒ Accelerator Physics Issues (e.g. H- stripping, etc.) ‒ Improving Cost & Schedule estimates, etc. ‒ Goal is to complete R&D to establish feasibility and to establish a baseline design in the next year ‒ Enthusiasm! Lots of people joining the effort >50

Fermilab Technical Division Oct 6, 2004Proton Driver Physics Workshop19 PD: Status and Plans Recent ITRP decision selected “cold” technology for the International Linear Collider. This will provide a HUGE boost for an SCRF linac based PD at FNAL Funding –$ ~1 M of FNAL funding is earmarked for PD R&D in FY05 –ITRP Decision  Most of the $ 5 M of R&D funds earmarked for Linear Collider R&D will also serve to advance the Proton Driver –Overall, FY05 will see a factor of 2 increase in SCRF R&D spending at FNAL vs FY04 Plans are forming for a SCRF Module Test Facility to be built in Meson East, long lead time items like modulators are already being ordered. Recent SMTF collaboration meeting at Jefferson Lab. (Sept 29) Potentially SMTF can bring even more money into the mix (SLAC LC funds, NICADD, Japan, Italy ?)

Fermilab Technical Division Oct 6, 2004Proton Driver Physics Workshop20 Timescale for a Proton Driver ? Always hard to guess Technically limited schedule –CD0 in 05 –CD1 in 06 (preliminary: acquisition strategy, PEP, conceptual design report, project scope, baseline cost/schedule range, PMP, Hazard analysis, etc) –CD 2/3a in (project baseline approved, approval to start construction) Funds in FY09 ? Availability of funding from DOE may push this later Once funding is approved, typical projects of this scale ( MI, SLAC B factory, KEK-B, SNS) have construction times of 4-5 years The timescale will also depend on how the Linear Collider plays out, over the next few years (e.g. PD = ETF ?) Its up to us to make the physics case that a Proton Driver is required and that it should go as fast as possible Making the PHYSICS CASE is crucial in all of this !

Fermilab Technical Division Oct 6, 2004Proton Driver Physics Workshop21 CONCLUSIONS It seems likely that a new intense proton source will be proposed for construction at FNAL in near future Similar in scope to the Main Injector Project (cost/schedule) A 8 GeV Synchrotron or a Superconducting Linac appear to be both technically possible. However the SCRF linac strongly preferred if it can be made affordable The FNAL management has requested that the 8 GeV linac design be developed including cost & schedule information A Technical Design will be developed (charge to Bill Foster) The Physics Case needs to be developed (charge to Steve Geer) and of course the goal of this workshop These will make it possible to submit a Proton Driver project to the DOE for approval and funding