Asbestos Data Website – Instructions Asbestos Data website: Accessible on computer and mobile devices (smart phone, tablets, etc.) Contains information on the location of asbestos on the St. George Campus: – Full asbestos survey reports – Summary tables for each building and a master summary table for the campus – Designated Substance Report (DSR) Summaries – DSRs for non-asbestos work – Fire proofing floor plans (floods, work above ceiling) UTM/UTSc staff should contact local Facilities or EHS group 1
Login 2 Click here if you don’t know or have forgotten our password.
Home tab 3 “Contains ACM Fireproofing” note in applicable buildings Select floor and room or type in room number
Home tab – Search button results 4 Results appear at the bottom of the change Codes in the results are defined in the drop down menus
Asbestos Data – Search button results 5 NF – non- friable F - Friable N – non-asbestos (sampling) C - confirmed asbestos (sampling) S – Suspect asbestos (treat as if asbestos) I – in accessible (no info, speak to supervisor to sample or treat as asbestos)
Documents tab 6 Survey report - detailed information on building materials in the selected building Fire proofing plans – provides colour coded floor plans showing the location of asbestos- containing fire proofing ACM or DSR Summaries – 1-page summary of building materials that can contain asbestos in the selected building Master building summary – overview of all buildings on the St. George Campus.
Fireproofing Plan Shows you if fire proofing contains asbestos
Asbestos Data – ACM Summary/DSR Summary Provides building overview, especially materials that are pervasive If interested in a particular room, use the Asbestos Data website to search Inform of nearby asbestos in non- asbestos jobs (inadvertent disturbance) Includes other Designated Substances 8
Asbestos Policy & Procedures Written procedures for employees who handle or work with asbestos
Contact Us tab – if you require assistance or have questions