News and Miscellaneous UPO Nov 23 2012 Didier Contardo, Jeff Spalding 1 UPO Nov 23 2012 -L1-Trigger TDRs -Upcoming Proposals for Phase 1 -CMS week Dec.

Slides:



Advertisements
Similar presentations
Preparing for the CD-2 Review Elton Smith Hall D Collaboration Meeting October 12-14, 2006.
Advertisements

ANNOUNCEMENTS Please any technical issues to CHANGE OF LOCATION: – Days 1 and 2 will now BOTH be held at the Washington DC.
US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Introduction Ricardo Gonçalo HSG5 weekly meeting – 19 January 2012.
1 News and Miscellaneous UPO May Didier Contardo, Jeff Spalding -Phase 2 Scope and Cost exercise.
O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, October 15, 2012 Trigger Performance and Strategy Working Group Trigger Performance and Strategy.
From Cave C to R3B: Time Schedule 2008 Experiments with upgraded setup: proton arm, Si detectors, QFS detection system 2009 Implementation of new readout.
Upgrading the CMS simulation and reconstruction David J Lange LLNL April CHEP 2015D. Lange.
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
AGS RSVP Weekly Meeting P. Pile 27 Jan 2005 AGS RSVP Weekly Meeting 27 Jan 2005 Useful Links: RSVP Project : C-AD.
1 News and Miscellaneous UPO Mar Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week.
HFT project Overview and Status October 14, 2010 F.Videbaek BNL.
2010 W EST V IRGINIA GIS C ONFERENCE Wednesday, June 9, 2010.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Workshop 24 Jun 11 AB Workshop on GEMs for CMS high  Last September’s workshop showed that MPGD technology is now mature. Stable operation of large area.
Lucie Linssen, CLICdp, (bi-)monthly meeting, July 21st CLICdp news CLICdp (bi-)monthly meeting July 21 st 2014.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
1 News and Miscellaneous UPO Mar Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Cost scale for phase 2 o June Upgrade.
Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
AGS RSVP Weekly Meeting P. Pile 2 December 2004 AGS RSVP Weekly Meeting 2 Dec 2004 Useful Links: RSVP Project : C-AD AGS Project: Office.
1 News and Miscellaneous UPO Apr Didier Contardo, Jeff Spalding News from Oct. RRB HL-LHC Pile-up for simulation Upcoming events: DESY week – Taipei.
Diffractive Higgs studies with CMS and TOTEM: Status, plans and possibilities for Torino Monika Grothe TO-CMS meeting October
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Upgrade Result Approval: CMS and Tracker Frank and Andrea 21/5/14Pixel phase 1 MB1.
Overview of a Plan for Simulating a Tracking Trigger (Fermilab) Overview of a Plan for Simulating a Tracking Trigger Harry Cheung (Fermilab)
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Software Tools for Layout Optimization (Fermilab) Software Tools for Layout Optimization Harry Cheung (Fermilab) For the Tracker Upgrade Simulations Working.
AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 AGS RSVP Weekly Meeting 6 Jan 2005 Useful Links: RSVP Project : C-AD.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
1 Towards Phase 2 TP releases 2013 Didier Contardo, Jeff Spalding Status of current simulations studies and ongoing issues Needs for TP preparation.
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
27-Jan-2014 Upgrade Steering Group “Update on Phase 2 TP - muons” J. Hauser, UCLA  Update on progress for TP:  2 slides follow to be shown at USG02 (Upgrade.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
2050AP Project WP5: “Conclusions” UPM Madrid 11 de Octubre 2013.
R. Croft, Exclusive Diffractive Higgs Signal at L1, Jan 2005 Diffractive Higgs Events in the L1 Trigger ( Work in progress ) Richard Croft, University.
Page 1 Enterprise Data Warehouse Project Executive: Barbara Chmielewski Project Manager: Anita Sharma.
Towards the TDR KM3NeT-DS WPx Meeting, Paris, Feb , 2009 Uli Katz ECAP / Univ. Erlangen  My private views  Basis for discussion  Decisions taken.
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
Ideas and Plans towards CMS Software and Computing for Phase 2 Maria Girone, David Lange for the CMS Offline and Computing group April
News and Miscellaneous Didier Contardo, Jeff Spalding UPO August 03/ UPO 08/03/12.
Organization and Goals for the Workshop
News and Misc UPO Meeting Jan 16, 2012
UPO meeting Nov. 29, 2013 D. Contardo, J. Spalding News
Third Workshop on GEMs for CMS
Francesco Forti University and INFN, Pisa
The DBD: Outline and Scope
Appendix C New Administration General Assembly Session
ctclink Steering Committee
Technical Board – DCAL Software
Exit Capacity Substitution and Revision
Update on ATLAS insertable B-layer
IEEE IMT-Advanced Review Process
Transfer to Operations
Second Independent Evaluation of UNAIDS
XRN Nov 19 Release - Status Update
Presentation transcript:

News and Miscellaneous UPO Nov Didier Contardo, Jeff Spalding 1 UPO Nov L1-Trigger TDRs -Upcoming Proposals for Phase 1 -CMS week Dec. 10  Upgrade Calendar -ESP 2012 – TDR projects MOU and WBS -Upgrade work plan for 2013

L1-Trigger CDR UPO Nov o Part 1 Agenda: Interim report: o Part 1 follow-up meeting on Calorimeter Trigger Charge: Agenda: o Part 1 follow-up meeting on Muon Trigger Charge: Agenda: Follow-up report: o Close out of CDR part 1 mid of next week for report at the MB on Dec. 6 o CDR part 2 postponed to Dec 17 : review and release of the TDR first draft

UPO Nov L1-Trigger TDR timeline CDR II Nov 27 GenSim Digi/Reco GenSim validation Digi validation samples available (by end Nov) - 29 Oct - 5 Nov Dec Jan Feb Send Doc 3 weeks before LHCC (Mar 19) PAG pre-approvals week of Dec ARC final approvals week of Jan Rate/menu/physics studies TDR Draft I TDR Draft 1 (without physics) to Reader Group TDR Draft 2 (with draft physics) to Reader Group TDR Collaboration Review (3 wks) Finalize Document TDR Final Draft for Collaboration Jan 28 Jan 11 Dec 10 ARC Appr’s Cost review by FB Task force created for performance studies J. Brook and B. Winer Task force created for performance studies J. Brook and B. Winer Issue with forward energy flow/ multiJet-HT-ET sum trigger rates in comparison of MC and HPU data (next slide)

L1-Trigger: MC - high pile-up data comparison UPO Nov o MC Jets and sum HT, ET rates exceeds HPU (60) data by factors up to 2 to 5 o Effect tracked to excess in sum ET/ HT origin under investigation, seems to be in the ECAL and HCAL endcap region beyond the tracker -XC this afternoon  Point to generator tuning? – TF being created to study this effect o For L1-Trigger studies -MC production status (see Gaelle’s presentation) -Apply corrections to trigger primitives to correct for Et(MC)/Et(Data) -Test with first digi samples positives  Trigger menu studies ~2 weeks  Turn-on curve for physics studies ~2 weeks

Proposals for additional scope in Phase 1 UPO Nov Proposal received for GEM detectors in ME1/1 in LS2 o 2010 GEM R&D proposal MPGD.pdf MPGD.pdf o Proposal received Nov. 1 - ‘A GEM Detector System for an Upgrade of the High-  Muon Endcap Stations GE1/1 + ME1/1 in CMS’ - Discussed review with SP - review process will report to MB and CB early Defining the review committee and charge High Precision Spectrometer and TOTEM discussion (contact: N. Cartiglia) o 2010: HPS R&D proposal Original design with two stations at 240 m and 420 m o Proposal to join forces with TOTEM to built a first stage at 220/240 m for physics at high luminosity post-LS1 using TOTEM Roman Pots for tracking and timing at 200 m - Preparatory studies on going New RP integration at 220 m - RF impedance with RP and Hamburg beam pipe – New RP geometry to house the timing and tracking detector - Submit Physics and Detector project proposal post-LS1 by end of 2012 Including resources required from CMS Review beginning of 2013 followed by recommendation to MB and CB - Submit a proposal for post-LS2 project at 420 m

CMS Week Dec. 12 UPO Nov o Upgrade plenary session agenda under discussion o Trigger Performance and Forward detector WGs on Friday 8:30 to 11:30 o Parallel meetings to request at Forward Calorimeter Wed. 12 from 8:30 to 12:00 …

Upgrade calendar UPO Nov Upgrade Google calendar accessible form Web page Modification needs Google account, please send us your account to get modification rights

ESP 2012 and 2013 UPO Nov ESP structure for 2012 Upgrade Coordination months pledged/allotted185/204 a)Working Group/Task Force Coordination18/12 b)Project Planning1/6 c)Reviews (CDR, R&D reviews etc)1/6 d)General R&D (under WG/TF, not within a detector project)79/36 e)Upgrade Performance Studies 1)MC/Reco development30/48 2)Trigger development and performance studies18/48 3)Forward Detector concept and performance studies25/24 4)Physics performance studies12/24 o Started to go through “acceptance” of pledges with WG/TF conveners. o There are obvious cases of detector specific work - will re-direct to those projects. o Will look for cases where work has been done but not pledged & encourage pledging. o Our estimate of 204 months was probably not too far off. For 2013 Re-evaluate categories and needs – see plans for 2013 in next slides – expect some increase above 204 Aim for 2012 closeout and proposal for 2013 ESP at next UPO

WBS and MOU MOU o Andrzej is preparing an overall MOU for the Phase 1 Upgrades (those beyond LS1). o Each project will have an MOU-addendum within this overall framework – preparing a template. o This will be one addendum per project, to be signed by all agencies working on the project. It will include – List of institutions with indication of areas of interest – WBS breakdown and cost table with funding by agency WBS o In the process of updating the WBS for Pixels and HCAL (L1-Trigger to follow) – then need to update schedules and cost books to new WBS o US-DOE is planning to go for CD1 approval in April for the CMS Upgrade. This requires a major effort to set up resource-loaded schedule. o We are trying to make the international WBS (MSP) compatible to US needs to maximize the benefit from the US effort for the international project UPO Nov

Plans for 2013 UPO Nov Proposal at UPO Sept. 28 o Prepare an internal interim Technical Proposal on status and plans for CMS phase 2 1) Longevity and long term performance of current detectors 2) Physics goals, and detector requirements 3) Detector concepts and preliminary performance studies 4) Targeted R&D program 5) Cost scale  focus for June 2013 Upgrade DESY o CMS discusses the document ~summer 2013 o Define phase 2 scope by end 2013 o Write Technical Proposal supported by detector performance and physics simulations (  in Physics TDR?) in 2014

Plans for 2013 for discussion UPO Nov o Prepare an internal document on long-term projection 1)Longevity and long term performance of current detectors a)Hardware – a summary document with individual appendix per detector -Report* on longevity of detectors end of Jan. -Report on electronics longevity end of Jan (survey systems), by Jun (analysis of areas of concern) b)Physics performance with aging Phase 1 detector -Performance studies with phase 1 detector after 500fb -1 and 1000fb -1, including aging effect and at pile-up 50 and 100 Jun. Upgrade week 2) Physics goals, and detector requirements -In conjunction with work for Euro-Strat and Snowmass, based on parameterized studies using Delphes? Jun. Upgrade week 3) Detector concepts and preliminary performance studies -Interim reports from Trigger Performance and Forward Detector Working groups mid of Jan. Proposal for trigger rates, latency, status of architecture options Concept for Forward detector and R&D plans Plan for motivation - requirement - performance studies -Develop CMSSW fullsim/fastsim release by Apr. -First performance studies with CMSSW Jun. Upgrade week 4) Targeted R&D program -Set reviews with projects and WGs  started for tracker phase 2 by Apr.

Plans for 2013 for discussion UPO Nov ) Physics goals, and detector requirements -In conjunction with work for Euro-Strat and Snowmass, based on parameterized studies using Delphes? 3) Detector concepts and preliminary performance studies -Develop CMSSW fullsim/fastsim release by Apr. -First performance studies with CMSSW Jun. Upgrade week  Workshop Jan o Plan physics parameterized and CMSSW studies o Plan development of the CMSSW release needed for phase 1-2 simulations: -Define CMSSW detector performance studies and MC samples needed -Prepare release for sample production Software issues for full and fast simulation Software developments for new detector concepts geometry implementation Software developments for data reconstruction Steps and schedule for phase 1 and phase 2 releases