Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.

Slides:



Advertisements
Similar presentations
Timesheets Time Reporting System. Web-based application supporting the process of time reporting. Offered in SaaS model (Software as a Service) or standard.
Advertisements

Rodent Habitat (RH) & Rodent Research (RR) Concept of Operations December 2013 ARC/Cecilia Wigley Rodent Research Operations Manager JSC/Brienne Shkedi.
737 PNEUMATICS MENU PRINCIPAL.
KLINGE’S NMR 262 Two Independent Systems Integrated into one Unit This Requires Special Features:  Total Redundancy of Refrigeration Components  Total.
C2V2 Technical Requirements and Constraints
NANORACKS EXPERIMENT RESOURCES August 31,
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
Freedom Combi Inverter
Configuring the MagicInfo Pro Display
Lesson 2 - Hardware on the Inside
Engineer Training Cooler TJ8300 / TJ8500 Cooler. Engineer Training Cooler TJ8300 / TJ8500 Confidential 2 Introduction.
Training Purposes Only JEM RAD SILK JMU (Ver. 1.1) 1 Notice : This technical data is furnished on the condition that it will be used by and.
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
KSC Ground Operations Timeline. KSC CGSE TIM A Technical Interchange Meeting regarding the Cryo Ground Support Equipment was held at KSC November 1 st.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Preliminary Advanced Colloids Experiment – 2.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama BRIC-17 TIR Overview Aug 28, 2012 Tony Cox EO20.
CIR FOMA Calibration Crew 9/24/08 1:30 PRO-CIR ACT-CMD FOMA-BTL-CAL 1 CMD PRO-CIR DEACT-CMD 274 watts 402 watts274 watts This sequence powers CIR and correlates.
Johnson Space Center, Houston TX Assembly and Disassembly Training Urine Monitoring System (UMS) 1 Familiarization Material for Assembly Task Training.
MSFC Payload Training bs/kh/ExpPldsTST#1/ 3/18/2016 Page 1 Astroculture-8 (ADVASC) TST #1 April 27, 1998 DTM/Beth Skidmore NASA/MSFC Training Branch Voice.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama TIR Overview Charts August.
Rodent Research-1 POIWG #35 Splinter. ARC Rodent Research (RR) Points of Contact Mission Overview On-orbit Operations Rodent Research Flight Rules Off-Nominal.
MSG Seal Replacement Mission Scenario Pre-Pack List (SOC OCR – ULF 1.1) MSG Front Window Exchange MSG Glove Rings & Feed- through Install MSG.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August.
EMCS Facility Status Thomas Niedermaier. This document is the property of Astrium. It shall not be communicated to third parties without prior written.
Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG #34 July 23, 2013 Tim Horvath Payload Ops Director
Baseline 12/09/10 TDC Day 5 Combination Protocol Overview Controlled/Monitored Diet Ops Urine Ops 5 Sessions/Subject: FDs 15, 30, 60, 120, & 180; FDs correspond.
Payload Operations Integration Working Group (POIWG) Increment 31/32 Overview January 24-26, 2011 Charles (Casey) Joyce Robotics.
Urine Monitoring System (UMS) ISS UMS is a redesigned version of the Shuttle UMS.
Note: The first status check should occur on the launch flight day prior to crew pre-sleep. This is the only feedback the Glacier team has that the Glacier.
EMCS Inc 13 Operations Gary Moore EMCS Ops Lead (256)
EO10-PPO-118 parcall /2/15 PARC/M.Cash MOON IMAGERY 0:10 Crew Commanding Time Critical Unattended Additional Activities TEXT FLEXIBLE MOON-CAMERA-FOCUS.
Baseline Review 05/20/14 PARC/Martha Cash RapidScat EPF-SDX INSTALLATION-HEATERS ON ADAPTER and INSTRUMENT Crew Commanding Unattended Time Critical External.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Obsolescence Driven Avionics Redesign (ODAR) Status POIWG #31, January.
Baseline 06/10/10 TDC Combination Protocol Overview Controlled/Monitored Diet Ops Urine Ops 5 Sessions/Subject: FDs 15, 30, 60, 120, & 180; FDs correspond.
PRO 232 Date: August 2011 Page: 1 MELFI PCS Displays PRO 232 November, 2014 – Rev I Form FD (Rev 3/8/04)
Lyndon B. Johnson Space Center Human Research Facility (HRF) HRF WORKSTATION 2 Brian Barras 1 HRF WORKSTATION 2 OVERVIEW/NOMINAL OPERATIONS Trainer: Brian.
EO10-PPO-051 Revision T 9/25/15 PARC/T. Cassady HRF Rack 2 8PU Drawer Installation and Configuration 1:00 TEXTFlexible Crew  Sessions required as needed.
GRAVI2 POIWG #34, July 24 th 2013 Abdul Basit Mohammad N-USOC-NOT-ABM-028, Abdul Basit Mohammad1.
November 29, Frankie Jernigan MSG Integration Investigation Operations Lead EO
This courseware is copyrighted © 2016 gtslearning. No part of this courseware or any training material supplied by gtslearning International Limited to.
Lisa Prendergast EO20/ Operations Lead January
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama ISS HAM TIR OVERVIEW (Kenwood in SM only) Kathy.
Chip Scale Atomic Clock Contact Info: Captain Ruiz Perez (281) John Merk (617) Paige McClung (281)
Increment 25/26 Cube Lab Ops TIR Overview Oct. 6, 2010 Four* new Modules (3 Aluminum Modules, 1 LMA pack) MSFC Ops Lead: Andrea Wade,
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Date: March 3, 2011 Originator: Tricia Pittman/EO20.
NASA – MSFC, Huntsville, Alabama Muscle Atrophy Research and Exercise System (MARES) Operations Summary Part I/II Karen Somers EO20/ Operations Lead
Copyright © 2009 Boeing. All rights reserved. ISS | Space Exploration 1 EXPRESS Payload Simulator Operations Technical Interchange Meeting (TIM) Amanda.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Cindy Grant SPACE-X & Orbital Lead POD Office/EO
ESA Payload Operations Overview: MSL August 07, 2009 / POIC-MSFC.
Equipment Familiarization Hanse Environmental Inc. VTC Series.
Polar Flight Laptop Application v v Flight Crew Display Baseline File Updated: 23 July 2014 Developer: UAB-CBSE DGUEEXPRSPOLRST1021.
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Ground Powerup 1 1.Scheduled by OCR. 16:00 GLACIER#-DNLK-CMD GLACIER#-HW-DRY GLACIER#-HW-PWR.
This document is the property of EADS SPACE. It shall not be communicated to third parties without prior written agreement.Its content shall not be disclosed.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
CPCG-HM Overview POIWG July 26, 2012 Brittney Macon 1.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Obsolescence Driven Avionics Redesign (ODAR) Status POIWG #32, July.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Safing Methods Daniel Massey EO10 (256)
CBSE Cold Stowage Hardware Overview William Crysel UAB/CBSE
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Delta Training Strategy.
Higher Active Logic Build Three (HAL 3) PLMDM Bundle Update Express Rack 4 Update David K Deitsch Marshall Space Flight Center Payload Operations & Integration.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Initial MELFI Facility.
MENU PRINCIPAL. THIS PRESENTATION INCLUDES THE SOURCES OF AIR, THE MAJOR SYSTEM COMPONENTS AND THE WAY THE CONTROLS AND INDICATORS ARE USED TO OPERATE.
Customer Overview Pack – September 2018
Launch and On-orbit Checkout
Customer Overview Pack – September 2018
AMS Summary 16:00 on Fri 12 Apr 2019 (GMT 102) To
Series 5300 Lithium Cell Formation System
Presentation transcript:

Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour command/downlink windows per week are required preferably on Monday and Thursday at 9am CST. After one month of on-orbit ops, one window a week preferably on Thursday is required. The ULF2 unit should be activated approximately 2 weeks prior to the first sample insertion. Currently, there are no sample insertions until the transfer of returning items from MELFI to Glacier (DCB-15A-PRE SMP XFR). Cold Stowage will submit a comment if samples are to be inserted into Glacier prior to this transfer. PD must command to disable/enable the cold volume fan around any door openings for the ULF2 unit to limit ice buildup. 15A unit software will alleviate requirement for PD commanding to fan during door openings. Health & Status (H&S) data (1 Hz) is downlinked via PL MDM. As long as the Glacier ground team can receive H&S data, crew is not required to perform additional status checks after activation. If no Ku-band coverage can be obtained in a 24-hour period, two checks separated by 8-12 hours are required for that day. Power interruptions must be limited to 30 minutes when samples are inside Glacier to prevent degradation of scientific results. Historical photos/video are required of crew working at the Glacier for each unit transferred to ISS. Prior to the 15A software load, all crew interface with Glacier will be via the front panel. Glacier Inc 18 GLACIER-STATUS-CHECK Crew checks status of Glacier after initial activation. After activation, status checks are only required when Ku-band AOS cannot be obtained in a 24-hour period. GLACIER-SW-LOAD Crew loads the Glacier payload application software onto the ELC from CD. GLACIER-HW-PWR Unattended activity to track Glacier power and thermal resources. -95C (160W) GLACIER-VIDEO-SETUP Crew sets up camcorder to obtain video of the setup. ~2 weeks ULF2UNDOCKULF2UNDOCK ULF2DOCKULF2DOCK 15ADOCK15ADOCK PRO-GLACIER ACT-CMD PRO sends commands to configure the RFCA and activate Glacier. Higher Active Logic (HAL) will issue PL MDM startup notification. Hardware Dry and Cool :10 GLACIER-HW-SETUP Crew connects cables, configures Glacier switches, installs desiccant canister, and places desiccant packs inside Glacier. 1:00 1:30 ASAP :5:25 15AUNDOCK15AUNDOCK Glacier Flight 15A Rack Power Down/Up ASAP Glacier Flight ULF2 DCB-15A-PRE SMP XFR Two crewmembers transfer returning samples, Rad Gene & LOH and HRP Nutrition/Bisp, from MELFI to Glacier. :30 Prior to dock GLACIER-DNLK-CMD PD commands to check status of Glacier and downlink data. Approximately 1 hour of Ku- band AOS is required for every 2 hours. Intermittent coverage is acceptable. GLACIER-PD-CMD PD commands to disable/enable Glacier fan around door opening. Time Critical: Ku- and S-band required for commanding. :20 GLACIER-HISD-VIDEO Crew takes video of another crewmember performing an activity at Glacier. GLACIER-HISD-PHOTO Crew takes photos of another crewmember performing an activity at Glacier. :15 2:00 PD Commanding PRO Commanding Crew Additional Activities Time Critical Unattended Activities 09/22/08

Note: Two dry cycles are noted in URC, but Glacier continues drying from initial command after activation to cool down. At least 24 hours are required for Glacier to dry. Glacier team will check humidity during the second command window and initiate cool down when the unit is dry. For planning purposes, cool down can start at the beginning of the second command window. Glacier requires at least 24 hours to cool and fully stabilize. Glacier Hardware Dry and Cool PD Commanding Crew Additional Activities Time Critical 09/22/08 Unattended Activities 24:00 16:00-18:00 No earlier than 24 hours from activation 16:00-18:00 GLACIER-DSC PACK-RMV Crew removes NGTC desiccant packs from Glacier interior. Time Critical: S-band required for crew call-down at completion. Glacier Activation GLACIER-HW-DRY Unattended Glacier drying. GLACIER-DNLK-CMD PD commands to initiate Glacier drying and downlink data. GLACIER-DNLK-CMD PD commands to initiate Glacier cool down and downlink data. 2:00 Day after completion of cool down GLACIER-DNLK-CMD PD commands to verify Glacier temperature is stable and to downlink data. :10 At least 24 hours GLACIER-HW-COOLDN Unattended Glacier cool down. Cool down requires additional 55W.

GLACIER-HW-COOLDN Unattended Glacier cool down. Cool down requires additional 55W. 09/22/08 Note: Glacier can be powered down/up via ground commanding since the circuit breaker can be left closed. Prior to rack powerdown, the Glacier team will command shutdown followed by PRO commanding to disable power, comm, and water. The PRO has authority to command Glacier power off/on when the Glacier ground team is not available. After rack powerup, PRO will command to enable power, comm, and water. No additional ground commanding from the Glacier team is required for powerup. Apply a 1:1 ratio for cool down duration, e.g., two hours of cool down for a two-hour power off event. Glacier Rack Power Down/Up 1:30 Rack Power Down/Up 1:30 PD Commanding PRO Commanding Time Critical PRO-GLACIER DACT-CMD PRO sends commands to configure the RFCA and deactivate Glacier. Higher Active Logic (HAL) will issue PL MDM shutdown notification. PRO-GLACIER ACT-CMD PRO sends commands to configure the RFCA and activate Glacier. Higher Active Logic (HAL) will issue PL MDM startup notification. GLACIER-HW-PWR Unattended activity to track Glacier power and thermal resources. GLACIER-PD-CMD PD commands to shut down Glacier prior to removal of power by PRO. Time Critical: Ku- and S-band required for commanding. Unattended Activities :15

Glacier As Needed Activities Note: Glacier units are planned for return before one year of on-orbit ops. Glacier remains powered during filter cleaning. PD must command to disable/enable the cold volume fan around any door openings for the ULF2 unit to limit ice buildup. 15A unit software will alleviate requirement for PD commanding to fan during door openings. Transfer prep only required if no other sample transfer activities to/from Glacier are planned prior to return. For most stages, returning items in MELFI are transferred to Glacier just prior to Shuttle docking. GLACIER-DSC CAN-RPLC Crew replaces desiccant canister. Only required after one year of on- board ops. GLACIER-FILTER-CLEAN Crew cleans inlet filter on the back panel. Only required when AAA used as primary heat rejection for 90 continuous days. GLACIER-SMPL-REMOVE Crew removes sample from Glacier. GLACIER-PD-CMD PD commands to disable/enable Glacier fan around door opening. ULF2 unit only. Time Critical: Ku- and S-band required for commanding. GLACIER-SMPL-INSERT Crew inserts sample into Glacier. GLACIER-XFR-PREP Crew performs quick cursory of Glacier contents and reports status to ground. Time Critical: S-band for voice communication. PD Commanding Crew Time Critical :15:10 :30 :15 :10 09/22/08