AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.

Slides:



Advertisements
Similar presentations
HCAL Front End Boards HCAL – Technical Meeting Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.
Advertisements

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague1 LED notched fibre system at AHCAL Calibration system for SiPM Ivo Polák 1.Notched fibre.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
Tests of the fiber-based calibration system CALICE collaboration meeting Cambridge, UK 2012/9/18 Jaroslav Zalesak Institute of Physics, Prague  QMB1 LED.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
AHCAL Electronics. Status and Outlook Mathias Reinecke AHCAL main Meeting D ESY Hamburg, Dec. 16th, 2014.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
AHCAL updates: SPIROC and DIF Mathias Reinecke, Felix Sefkow CALICE/EUDET electronics meeting London, January 10, 2008.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
08/10/2007Julie Prast, LAPP, Annecy1 The DHCAL DIF and the DIF Task Force Julie Prast, LAPP, Annecy.
EUDET FEE status C. de LA TAILLE. EUDET annual meeting 6 oct 08 cdlt : FEE statrus 2 EUDET module FEE : main issues 2 nd generation ASICs –Self triggering.
AHCAL Status. Electronics and DAQ Mathias Reinecke CALICE meeting Argonne ANL, Mar. 19th, 2014.
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
Detector Interface (DIF) Status CALICE meeting – DESYDec Mathias Reinecke.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
CALICE / Silicon PM activities Detector and readout electronics development Development of a system for mass production of AHCAL “HBU” scintillator/PCB.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
AHCAL electronics. Status Module Production an Power Pulsing Mathias Reinecke AHCAL main meeting DESY, Dec. 10th, 2013.
AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
Mathias Reinecke CALICE week Manchester DIF development – Status and Common Approach Mathias Reinecke for the CALICE DAQ and Front-End developers.
HCAL future: 2 nd generation module and testbeam plans Felix Sefkow CALICE collaboration meeting Kobe, May 10-12, 2007.
Visit to CALICE ECAL testbeam (by Shinshu) at DESY, 16 th – 19 th October 2012 Samir Arfaoui & Erik van der Kraaij 30 th October 2012.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
Mathias Reinecke AHCAL Main Meeting Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
2011 Sept 14-16Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Mathias Reinecke EUDET Annual Meeting 2008 – NIKHEF AHCAL Power Aspects P. Göttlicher, M. Reinecke, H.-J. Wentzlaff for the AHCAL developers.
Annual EUDET, OCT6,2008 Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers for AHCAL EUDET annual meeting, NIKHEF 1.Introduction 2.QRLed.
14 jan 2010 CALICE/EUDET FEE status C. de LA TAILLE.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
CALICE/EUDET FEE status C. de LA TAILLE. 31 aug 2009 EUDET SC meeting Status of JRA3 Front End Electronics 2 ILC front-end ASICs : the ROC chips SPIROC.
HCAL Modules -First Ideas Mathias ReineckeHCAL – MPI meetingJan Motivation 2.Mechanical Constraints 3.HCAL Base Unit (HBU) 4.Light Calibration.
CALICE/EUDET FEE status C. de LA TAILLE. 16 jun 2009 TB meeting FNAL ASICs for CALICE/EUDET 2 First generation ASICs Readout of physics prototypes (ECAL,
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
Future test beam options Felix Sefkow CALICE AHCAL main meeting DESY, June 16, 2009.
14.4. Readout systems for innovative calorimeters
LED notched fibre system short HBU0 party with QMB6
Status of HBU, EBU and SM_HBU
CALICE meeting 2007 – Prague
HCAL task status report
Testbeam Timing Issues.
Towards a realistic Scintillator HCAL with SiPM read-out
LED notched fibre system at AHCAL Calibration system for SiPM
HCAL Modules -First Ideas
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
Scintillator HCal Prototype
Presentation transcript:

AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009

Mathias Reinecke | CALICE week Lyon | Sept. 16th – 18th, 2009 | Page 2 Outline Flexleads ‘old-fashioned overview’ CALICE week Manchester > Hardware Developments at DESY  CALIB, POWER, Flexleads  HBU0  DIF0 and DAQ interface (USB)  Tiles integration > System Commissioning > SPIROC analogue tests (see electronics session) > The Next Generation > Conclusions and Outlook

Mathias Reinecke | CALICE week Lyon | Sept. 16th – 18th, 2009 | Page 3 Flexleads – SIGNAL and POWER Flexlead Pre-Bending: ~22mm > 20 pieces of each type finished. > Pre-bending procedure ok. Type: POWER

Mathias Reinecke | CALICE week Lyon | Sept. 16th – 18th, 2009 | Page 4 Flexleads – SIGNAL and POWER > About 80 connection cycles up to now - still ok. > Compensate HBU misalignments in distance. > Fulfill AHCAL height requirements. > Tests ok concerning:  Signal allocation  Signal quality  Resistance for power HBU CALIB

Mathias Reinecke | CALICE week Lyon | Sept. 16th – 18th, 2009 | Page 5 CALIB and POWER Modules > 4 Modules of both types finished, in operation. > First tests successful. CALIB module: 11 x 10 cm² POWER module: 12.5 x 11 cm² ARM7 µC Sizes and heights: To be adapted to ILC mechanics later.

Mathias Reinecke | CALICE week Lyon | Sept. 16th – 18th, 2009 | Page 6 HCAL Base Unit (HBU) setup SPIROC1 Connectors: Signal Power SPIROC2 DIF FPGA CALIB USB / DAQ Flexleads 2 setups available CALIB (fibres), ASCR Prague 36 cm

Mathias Reinecke | CALICE week Lyon | Sept. 16th – 18th, 2009 | Page 7 Reflector Foil Assembly HBU backside Reflector Foil (assembled in 4 steps)

Mathias Reinecke | CALICE week Lyon | Sept. 16th – 18th, 2009 | Page 8 Reflector Foil Assembly Alignment ‘Reflector Foil – HBU’ SiPM pins LED Alignment pin 2.5 mm

Mathias Reinecke | CALICE week Lyon | Sept. 16th – 18th, 2009 | Page 9 Tile Assembly (the first 18) Assembled tiles ‘ just before soldering’.

Mathias Reinecke | CALICE week Lyon | Sept. 16th – 18th, 2009 | Page 10 Tile Map Each quadrant can choose between 3 SiPM bias voltages

Mathias Reinecke | CALICE week Lyon | Sept. 16th – 18th, 2009 | Page 11 Commissioning – Signal Chain for LED operation Concept : December 2007 “Full Operation Chain”

Mathias Reinecke | CALICE week Lyon | Sept. 16th – 18th, 2009 | Page 12 Commissioning (status last Friday) SPIROC2 output: LEDs firing, 3 events (triggers), 18 tiles assembled 1 event (36 chns) Hit Bit (internal channel trigger) Tiles with LED Light (SPIROC out) Baseline

Mathias Reinecke | CALICE week Lyon | Sept. 16th – 18th, 2009 | Page 13 The Next Generation Mechanical concept: K. Gadow Not in scale!

Mathias Reinecke | CALICE week Lyon | Sept. 16th – 18th, 2009 | Page 14 The Next Generation Sector Connecting Plate Cassette (=slab) HBU SPIROC Central Interface Board with DIF, CALIB and POWER Not in scale!!

Mathias Reinecke | CALICE week Lyon | Sept. 16th – 18th, 2009 | Page 15 The Next Generation SPIROC LED Flexlead + tiny connector Central Interface Board with DIF, CALIB and POWER Cooling Pipe Tile with SiPM Reflector Foil Cassette Bottom Plate Not in scale!! HBU

Mathias Reinecke | CALICE week Lyon | Sept. 16th – 18th, 2009 | Page 16 EUDET Tiles Ideas from November 2008 (ITEP) 153 delivered 12 samples arrived

Mathias Reinecke | CALICE week Lyon | Sept. 16th – 18th, 2009 | Page 17 EUDET Tiles 12 tiles of new generation arrived from ITEP

Mathias Reinecke | CALICE week Lyon | Sept. 16th – 18th, 2009 | Page 18 EUDET Tiles “quite a lot tiles with larger deviations” => prototypes Measured by DESY group ZM31

Mathias Reinecke | CALICE week Lyon | Sept. 16th – 18th, 2009 | Page 19 EUDET Tiles UV LED (~10ns pulse width) measurements: Tile numberSaturation [pixels] WLS fibre: ~25ns time constant SiPMs : 756 pixels (CPTA) ? Size : 1mm² ?? SiPM recovery time < 25ns ? Quenching resistor, -variations? Saturation values ok ? Variations due to fibre alignment? No. of Pixels ok for physics? Measured by Erika Garutti and Adel Terkulov

Mathias Reinecke | CALICE week Lyon | Sept. 16th – 18th, 2009 | Page 20 Conclusions and Outlook > AHCAL prototype delivers first test-data from LED system. > British DAQ (hardware, DIF firmware) still has to be implemented. > AHCAL prototype is prepared for DESY testbeam (USB based). > Labview GUI has to be extended for testbeam (=> Sandra Christen). > Redesign concepts of AHCAL modules are prepared now. > EUDET Tiles : Status ok (input from ITEP to our comments?)? > A lot of system’s and SPIROC analogue and digital tests ahead.