The Chaos Report A series of reports issued by The Standish Group, an industry analysis firm Classifies software projects into 3 classes: ̵ Successful:

Slides:



Advertisements
Similar presentations
Academic Industry Interactions - workshop. Motivations and Challenges Many research intensive universities have research budgets where
Advertisements

S D Compliance Automation, Inc 1 Larry Fellows Compliance Automation, Inc. When Any Road Won’t Do… Project Scope Points the Way.
Guerilla Training or Never Let a Chance Go By Jon Scheele, PMP.
Delivering Enterprise Projects Using Agile Methods Brent Barton May 23, 2006.
The Chaos Report © The Standish Group 1995.
CS Software Engineering Process and Practice Welcome! Leon Sterling and Ed Kazmierczak {leon,
On Time, On Budget — Every Time IMPROVING THE RELIABILITY AND COST-EFFECTIVESS OF ADVENTIST HEALTH PROJECTS 6 July 2007 Presentation to Corporate President’s.
“Not Fully Specified (Project) Objectives” CS524 – Software Engineering I Azusa Pacific University Professor Dr. Sheldon X. Liang Fall I 2007 Ernie Rosales.
8 September ProcessWithin the Steps  Put together minimal solution Start with external commitments Introduce internal milestones  Focus on the.
 The Rise of Computer Science ◦ Machine Language (1 st Gen) ◦ Assembly Language (2 nd Gen) ◦ Third Generation Languages (FORTRAN, BASIC, Java, C++, etc.)
Lawrence Chung Software Engineering: Introduction 1 Module 1: Introduction to Software Engineering.
9-Jun-15 GCIS 504/GENG 580- The requirements problem1.
6/10/20151 Introduction to Software Engineering. 6/10/20152 Programming versus Software Engineering l programming 1. The process of translating a problem.
Software Design & Production Methodologies STRUCTURED & OBJECT-ORIENTED METHODS for SYSTEMS ANALYSIS & DESIGN Vassilka Kirova Computer & Information Science.
Software Engineering.
Enterprise Adoption of FOSS The model is based on trade-offs among A – Attitude F – Features R – Risk C – Costs Adoption Policy Functional Capability Tolerance.
Managing IT as a Business Capstone 4596 April 2011.
Earned Value Project Management: a powerful tool for software projects
Change Request Management
Project Management for Healthcare IT systems implementation Jimmy Char General Manager Bull Bulgaria & Bull SAS - Branch Bulgaria.
W w w. q a i g l o b a l. c o m ‘Better Projects, Better Business’
Information System Economics IT PROJECT MANAGEMENT.
(from Dr. Diane Pozeksky. “80% of software projects fail” Standish Report (1995) Standish Report 16.2% completed on-time and on-budget with all features.
Why is software engineering worth studying?  Demand for software is growing dramatically  Software costs are growing per system  Many projects have.
Reducing ITS Project Risk By using and developing consensus based regional ITS architecture and a systems engineering process Robert S. Jaffe, Ph.D., CSEP.
Introduction to Software Engineering. Programming versus Software Engineering Programming versus Software Engineering programming programming 1. The process.
Chapter 7: Project Cost Management Information Technology Project Management, Fourth Edition Cost Management Principles and Cost Estimating Tuesday, March.
Ch.1 1 Software Engineering A Preview Chapter 1. Ch.1 2 Outline My Background Definitions of software engineering (SE) Historical origins of SE SE as.
VCU Information Systems Institute Advanced Delivery Methodology Courtesy of Data Management That Works.
PROJECT MANAGEMENT FUNDAMENTALS Page 2 Why Project Management? Current Issues: n Complex nature of business today — More cross-functional efforts — Need.
Introduction to Systems Analysis and Design
5/30/20161 Iterative Project Management Chapter 2 – How Do Iterative Projects Function? Part 1 Iterative Project Management / 01 - Iterative and Incremental.
Optimizing NASA IV&V Benefits Using Simulation Grant Number: NAG David M. Raffo, Ph.D College of Engineering and Computer Science School of Business.
Lecture 4. Software Engineering Body of Knowledge SWEBOK  Articulating a body of knowledge is an essential step toward developing a profession because.
Statistics from the Famous 1995 Standish Group Report.
Failures, Successes And Identifying Best Practices For Higher Success of IT Projects CHINOYEREM DEBORAH OKOROAFOR CHIMA W. ORIJI
The Software Crisis A Report from 1979.
Agile – The Movement Chapter 1 “Agile”, the Movement from SDLC 3.0 Beyond a Tacit Understanding of Agile.
TOPIC 8 SYSTEM DEVELOMENTS, IMPLEMENTATION, MANAGEMENT AND APPLICATIONS CONTENT : 8.1 METHODOLIGIES AND SOFTWARE TOOLS FOR SYSTEM DEVELOPEMTN 8.2 APPLICATION.
© 2010 Bennett, McRobb and Farmer1 Challenges in Information Systems Development Based on Chapter 2 of Bennett, McRobb and Farmer: Object Oriented Systems.
Managing IT as a Business Managing Organizations in the 21 st Century Organizations must become more agile, transparent, and innovative. There is great.
Chapter 1 The Requirements Problem
Virtual Project Risk Research In Progress April Reed Linda Knight DePaul University May 23, 2006.
Project success = business success TM Introduction to Agility Agility is a comprehensive response to the business challenges of profiting from rapidly.
CEN 4021 Software Engineering II Instructor: Peter Clarke Spring 2005.
Prof. Jim Norton Senior Policy Adviser e-Business & e-Government Meeting the business challenge…
Category Category Category Category Category
303KM, Introduction to Project Management1 Chapter 1: Introduction to Project Management.
Saroj Saengphongumphai, May Thank you to every teachers, books, websites, posts, articles, etc.
Risk Management in Software Development Projects Roberto Torres Ph.D. 11/6/01.
Software Engineering - CSC 323
The Nature of Information Technology Projects
The Nature of Information Technology Projects
Why is software engineering worth studying?
Requirements Engineering Lecture 13
Introduction to Software Engineering
WJEC Past Paper Questions (with Answers).
Software Engineering - CSC 323
Manajemen Proyek Sistem Informasi
10 Steps to Better Requirements
Partial Products.
Exhibit 14.5 Among Firms Offering Health Benefits, Percentage of Firms Whose Largest Plan Includes a High-Performance or Tiered Provider Network, by Firm.
ASEE Software Engineering Process Improvement Workshop HOT TOPIC, 2001
Partial Products.
Software Engineering and Best Practices
Categories of Fossils Practice
Software Design & Production Methodologies
7 pt 7 pt 7 pt 7 pt 7 pt 14 pt 14 pt 14 pt 14 pt 14 pt 21 pt 21 pt
Exhibit 14.4 Among Firms Offering Health Benefits, Percentage of Firms Whose Largest Plan Includes a High-Performance or Tiered Provider Network by Firm.
Presentation transcript:

The Chaos Report A series of reports issued by The Standish Group, an industry analysis firm Classifies software projects into 3 classes: ̵ Successful: all features within time and budget constraints ̵ Challenged: late, over budget, and/or with reduced functionality ̵ Canceled before completion or never used

The Chaos Report First report in 1994: ̵ 16% of projects successful ̵ 53% of projects challenged ̵ 31% of projects canceled Several reports since then with fluctuating numbers, but general improvement 2009 update (worse than 2006): ̵ 32% of projects successful ̵ 44% of projects challenged ̵ 24% of projects canceled

Anti Chaos There is quite a bit of objection to the Chaos reports ̵ Categories are not really well defined (is a fully functional project that is 10% late really challenged?) ̵ Sources are not disclosed (which projects were surveyed?) ̵ Methodology is not disclosed ̵ Reporting is sloppy (not clear if “189% cost overruns” means 89% over original estimate or 189% over original estimate) ̵ Answers are not given (“buy our services”) ̵ “This is not science but a business” The 1994 report is now largely considered as exaggerated

Other Studies Capers Jones, 1998 ̵ Cancellation/abandonment rates of 14% to >24% for different project types El Emam and Koru, IEEE Software 2008 ̵ About 20% of delivered projects were unsuccessful, and about 30% were challenged

Capers Jones, Applied Software Measurement: Assuring Productivity and Quality. McGraw Hill, 1991 Presents (partial) data from ~4000 software projects from