R. Aleksan CARE06 meeting Frascati, November 16, 2006 CARE06 1.Preparing FP7 2.Conclusion.

Slides:



Advertisements
Similar presentations
D.S. proposal 18/12/2003 R. Garoby 1 PROTON DRIVER ACTIVITY Present work program: IPHI-SPL collaboration HIPPI Joint Research Activity [CARE] Proton driver.
Advertisements

Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Nick Walker KEK-DESY meeting 7 th March 2005.
14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Alain Blondel Neutrino physics in Switzerland collaborate among ourselves and in Europe to ensure a rich programme collaborate in T2K leading role in GLACIER,
Research Infrastructures The Research Infrastructures in FP7.
R. Aleksan EuCARD’13 June th, 2013 The role of the EC projects Round Table 1.General Context 2.Introduction 3.Views from the main players 4.Conclusion.
FP7 and ILIAS-NEXT Geppo Cagnoli INFN Sez. Firenze University of Glasgow 3 rd ILIAS GW Meeting – 26 th Oct. 2006, ICL.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
Introduction to EC Framework Programme 7 Rob Edgecock CCLRC Rutherford Appleton Laboratory Introduction to Framework Programmes “ “ FP7 Neutrino LOI Mapping.
1 INFRA : INFRA : Scientific Information Repository supporting FP7 “The views expressed in this presentation are those of the author.
September 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2006.
J.P.DelahayeE-GDE meeting 10/05/061 CERN non EU contribution to ILC J.P.Delahaye.
ESPG R. Aleksan November 28 th, 2011 Accelerator R&D Accelerator R&D 1.Introduction 2.Accelerator Science and Technology 3.Conclusion.
European design study on Neutrinofacilities - Euronu within FP7.
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 EUDET I3 Kickoff meeting, Desy, Hamburg 15-17/2/2006 Presentation by Stefano Fontana, DG Research.
European Strategy Session of Council The European Strategy – report to the RECFA meeting in Brussels Will cover the following selected topics:  ECFA and.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
E.Elsen European LC Workshop, Cockcroft, UK, Jan 2007 Perspectives for European LC R&D.
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration.
EuCARD Number of partners : 40 beneficiaries (12 countries) Total cost ~ 50 M€ (requested EC contribution: ~15 M€) Coordinator : J.-P. Koutchouk (CERN)
Maurizio Vretenar, CERN. Background 2  EuCARD (and CARE before it) had an enormous impact in structuring and promoting the European R&D on particle accelerators;
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Report from ESGARD EuCARD-2.
Concluding remarks R. Aleksan CERN, November 25, 2005 CARE is almost 2 year old What comes next ?
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee CERN, September 13, 2006.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 Meeting with NuPECC 9 March 2006 Presentation by Daniel Pasini, DG Research.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
1 GUTs and Branes DESY Theory Workshop 2003 A brief introduction to the future of particle physics at DESY Albrecht Wagner Hamburg, 23 September 2003.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement An Introduction to EuCARD-2.
R. Aleksan EuCARD Kickoff meeting CERN, December 5, 2008 From CARE to EuCARD and more… 1.Historical background 2.General CARE objectives 3.EuCARD birth.
J.P.Delahaye GDE Meeting OXFORD CERN participation to ILC ILC- MoU: Support to GDE Contribution to GDE: J.L.Baldy: Civil Engineering & Conventional.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
F. Richard LAL/Orsay 1 ELAN in 2006 Annual Meeting.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
April 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE Paris April 2006.
E.Elsen GDE Meeting, Beijing, Feb 2007 Perspectives and Planning for European LC R&D.
Preparation of FP7 Integration Activity Bid (2008) Superconducting RF Acceleration Systems Preparatory Group: Initial group : Dieter Proch (DESY), Terry.
DESY. Status and Perspectives in Particle Physics Albrecht Wagner Chair of the DESY Directorate.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
RF programme Review for the ESGARD Roadmap to EUCARD2 Peter McIntosh (STFC) Stephane Chel (CEA) Wolf-Dietrich Moeller (DESY)
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
First discussions regarding new EU AIDA project EUROnu WP5 Meeting 8 September 2009 Paul Soler.
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 CARE Collaboration Meeting CERN, Switzerland, November 2005 Presentation by Daniel Pasini,
CERN Council R. Aleksan September 18 th, 2009 Structuring further Accelerator R&D In Europe 1.Introduction 2.General Context 3.Building TIARA 4.Conclusion.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
TPB meeting R. Aleksan September 2 nd, 2009 Structuring further Accelerator R&D In Europe 1.Introduction 2.General Context 3.Building TIARA 4.Conclusion.
R. Aleksan ESSnuSB meeting May 26 th, 2014 ESGARD and H H Projects under investigation 3.Integrating Activities 4.Conclusion
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
TIARA-PP Governing Council 1 representative per contractor TIARA-PP Coordinator Industry advisory committee? Project Management (WP1) Project Office Dissemination.
ESGARD - 19th May 06 Very brief summary! 32 LOIs received LHC Upgrade
WP9-SuperB in TIARA M. Biagini, INFN-LNF.
Accelerator R&D for Future Neutrino Projects
Coordinated Accelerator R&D in Europe
TIARA: Structuring further Accelerator R&D in Europe
Accelerator Research and Innovation for European Science and Society
PROPOSALS FOR HIGH INTENSITY – HIGH ENERGY PROTON BEAMS
Outline: Why now ? What ? How ?
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Design Study on High Luminosity Colliders EUROCRAB submitted to EU-FP7
as of today 123 registered participants
Olivier Napoly, coordinator CEA/Irfu
Futurs Programmes Européens et Co-Innovation Industrielle
Presentation transcript:

R. Aleksan CARE06 meeting Frascati, November 16, 2006 CARE06 1.Preparing FP7 2.Conclusion

ProjectTypeBeam Type Start date Duration Years Total Cost EU contribution CAREI3All1/1/04555 M € 15.2 M € EUROTEVDSe +,e - (LC)1/1/05329 M € 9 M € EURISOLDSIon, p  beam) 1/1/05433 M € (3.3 M €) 9.16 M € (1 M €) Total>117 M € 33.2 M € Summary of Accelerator R&D projects These projects are well structured, with clear objectives, deliverables and milestones. They represent a fantastic strength for the HEP European community in order to play a leadership role  In the improvement of present accelerators  In the development of new accelerators EUROLEAP NEST e Plasma acceleration 1/9/ M € 2 M €

ESGARD actions Launching new projects Preparing for FP7 calls 2 meetings: May 19 and September 12, 2006 ESGAR recommends continuing CARE/NED program from 2007 on with the construction of test magnets Accelerator R&D CARE Multipurpose (e,p, ) ???? CARE SRF CARE PHIN CARE HIPPI CARE NED EUROTEV DS: ILC+CLIC ????? EURISOL DS: Neutrino  -beam ???? DS Fact Scoping study ? DS Fact? EUROLEAP e in plasma? Major Strategic decisions

ESGARD recommended to continue the efforts and to issue the detailed proposal planned for in about a month, even without the list of the partners. This document should indeed help to interact with the institutes if required for getting them involved. This proposal is independent of FP7 at the moment, but this could be re-considered in case of delays.

A.D. ESGARD /10 The proposed Program is to build by 2009 one Alstom/MSA and one SMI dipole magnet model, relying on the cos , layer design and the conventional insulation system. It is articulated around 5 Work Packages – WP1: Design and Integration (01/07-12/09), – WP2: Supporting R&D and Demonstrators (01/07-06/08), – WP3: Pole Manufacturing (07/07-06/09), – WP4: Collaring and Cold Mass Assembly (01/08-09/09), – WP5: Magnet Test (second half of 09). NED Phase II Program Possibly by keeping all CARE/NED partners: CEA (France), CCLRC/RAL (UK), CERN, CIEMAT(Spain), INFN/Genoa and INFN/Milan (Italy), Twente University (The Netherlands) and Wroclaw University of Technology (Poland), return

Includes 2 parts: bottom-up (all fields) and targeted (thematic)

For indication: proposition budget profile from the commission (march 2006)

“We would like at this point to explore how our community could propose a coherent set of projects in an organized manner. To this end, we would like to make a call for Letters of Intent for R&D projects. These proposals could be  Joint Research Activities (JRA), to be included in I3 proposals, such as the ones Joint Research Activities (JRA), to be included in I3 proposals, such as the ones in CARE  Design Study (DS) projects, such EUROTeV or EURISOL Design Study (DS) projects, such EUROTeV or EURISOL  Construction of New R&D Infrastructures (CNI-RD), such as a test facility. Construction of New R&D Infrastructures (CNI-RD), such as a test facility. It should be noted that ESGARD is only concerned by the new infrastructure for carrying accelerator R&D and not the accelerators project for carrying physics programmes.” ESGARD actions Call for Letters of Intent for accelerator R&D project With a deadline on April 28 th. So as to have a first scope of the ideas of the community by the Zeuthen meeting

ActivityEstimated Cost (M€) LHC & magnets23.35 p, ion Accel ? CLIC36.8 SCRF - ILC ? Neutrino facility36 Phi Factory? Laser-Plasma M€ + ? 34+ letters received

LHC and p (ion) accelerators Subject Contr act Type Specif ic Title Nb institute Durat ion Cost (Meuro) continuatio n Contact LHCDS The Upgrade in Luminosity of the CERN-LHC in Europe > F. Ruggiero, W. scandale (CERN) LHC magnetI3JRA High Field Magnets for LHC upgrades A. Devred (CEA) TBD LHC magnetI3JRA HT superconducting materials 4 (+6)51.3A. Ballarino (CERN) LHC MagnetI3JRA High field magnet construction 73?CARE/NEDA. Devred (CEA) LHC MagnetI3TA CryoMagNet 771CARE/NEDA. Devred (CEA) P aceel.DS Fast Cycling Syncrotron Design Study >1047.2CaRE/HHH F. Ruggiero, W. Scandale (CERN) P accel.I3JRA Collimators and Materials for High Power Accelerators 6510R. Assmann (CERN) P accel.I3JRA Development of an electron cooler for the Extra Low ENergy Antiproton ring >1022.5T. Eriksson (CERN) P accel.I3JRA Fast Cycling Superconducting Magnets for Synchrotrons TBD P accel.I3JRA Superconducting linac-based Proton Driver CARE/HIPPI R. Garoby, M. Vretenar (CERN) p-ion accel.I3JRA High Current Ion Linac 10715CARE/HIPPIU. Ratzinger (IAP-FU) p-ion accel.I3JRA Light Ion Sources and Associated Plasma Studies 45??R. Gobin (CEA) intense ion beamCNI High Current Ion Storage Ring ?1220?U. Ratzinger (IAP-FU) p-ion accel.I3JRA Super Conducting Sputtered Quarter Wav Cavities >1033M. Pasini Update on the LoI received return

Subject Contr act TypeSpecificTitle Nb institute Durat ion Cost (Meuro) continuati onContact CLICI3JRA Drive Beam issues 935D. Schulte (CERN) CLICI3JRA Generation And Diagnostics Gear for tiny EmiTtance 645.9H. Braun (CERN) CLICI3JRA L-band, High Power and High Efficiency Multi Beam RF Amplifier >1067 I. Syratchev (CERN) CLICI3JRA Luminosity Ensuring Design D. Schulte (CERN) CLICI3JRA High-gradient RF structures 6 55 W. Wuensch (CERN) CLICI3JRA Ka-band Stand-Alone Power Source >1047E. Jensen (CERN) CLICI3JRA CLIC Two-Beam Test- Stand and CLIC Post Collision studies 251,5? V. Ziemann (U. Uppsala) Lineac Collider activities

Subject Contr act TypeSpecificTitle Nb institute Durat ion Cost (Meuro) continuati onContact SCRF (ILC)?JRA Positron Polarized Sources 11410?A. Variola (LAL) SCRFI3 JRA- WP Deposition of thin superconducting layers for accelerator technology 352 CARE/S RF M. Sadowski (IPJ) SCRFI3 JRA- WP Deposition of superconducting films of pure lead (Pb) by means of the UHV cathodic arc 350,5 CARE/S RF J. Langner (IPJ) SCRFI3 JRA- WP Development of various materials (e.g. Mg, Pb) films on Cu substrates 24? CARE/S RF F. Tazzioli (LNF) SCRFI3JRA SCRF technologies SRF coll. ?? CARE/S RF D. Proch (DESY) SCRFI3JRA Influence of Slope on Superconductive RF Cavity Cooling 220,9?B. Rousset (CEA) SCRFI3WP Infrastructure testing the new technologies concerning the high power-high repetition rate lasers 121,8?A. Variola (LAL) SCRFCNI European Super- Conducting RF Facility TTC + ?30?A. Wagner (DESY) ILCI3 JRA Use the HERA Electron Ring as ILC Damping Ring 4310 EUROTe V F. Willeke (DESY) Lineac Collider activities (cont’d) return

Other activities Subject Contr act Type Specif ic Title Nb institute Durat ion Cost (Meuro) continuatio n Contact NeutrinoDS Next Generation of Neutrino Oscillation Facilities 42320CARE/BENER. Edgecock (RAL) NeutrinoDS+I3JRA FFAG >10516F. Meot Phi FactoryDSDAPHNE upgrade : DANAE???? Laser-Plasma?JRA LAser Plasma TECHnology CARE/PHIN, EuroLeap V. Malka (CNRS) return

Line of action/ActivityTopics called Funding scheme(s) € (millions) indicative 1. Support to existing research infrastructures 1.2 ICT based e- Infrastructures INFRA : Scientific Digital Repositories Combination of Collaborative projects & Coordination and support actions (CSA) 89 INFRA : Deployment of e- Infrastructures for scientific communities. INFRA : e-Science Grid infrastructures 2. Support to new research infrastructures 2.1 Design studies INFRA : Design studies for research infrastructures in all S&T fields Collaborative projects 27 INFRA : Design studies for e- Infrastructures Construction of new infrastructures preparatory phase INFRA x: Preparatory phase for research infrastructures listed in the 2006 ESFRI Roadmap 120 INFRA x: Preparatory phase for Computer and Data Treatment Research Infrastructures in the 2006 ESFRI Roadmap 15 Main calls with closing dates spring 2007

Line of action/ActivityTopics called Funding scheme(s) € (millions) indicative 1. Support to existing research infrastructures 1.1 Integrating Activities INFRA : Integrating Activities in all scientific and technological fields. Combination of Collaborative projects and Coordination and support actions (CSA) 283 INFRA x: Integrated Activities to support the specific needs of thematic priority areas 1.2 ICT based e- Infrastructures INFRA : GÉANT 115 INFRA : Scientific Data Infrastructure Main calls with closing dates spring 2008 (~120) (~160)

Activity Call 1 (spring 2007)* Call 2 (spring 2008)* Call 3 (spring 2010)* Call 4 (spring 2012)* Integrating activitiesXXX e-InfrastructuresXXXX Design studiesX Construction – support to the preparatory phase XX Construction – support to the implementation phase XX Accompanying MeasuresXXXX Summary timetable FP7 * Closing date

Given the calendar of the calls planned, ESGARD recommends to submit all the Design Studies of the LoI list in the fist call early The upgrade of luminosity of the CERN-LHC 2.Super-beams and neutrino facilities 3.Fast cycling synchrotron design 4.Beta-beams study ESGARD decided to set-up working groups to help developing consistent set of research activities, in line with the priorities stated in the Strategy Document adopted by the CERN Council, and that could be imbedded in an (or several) Integrated Activity (IA) projects  High-intensity, high-energy proton beams (convener: R. Garoby)  Novel accelerating systems (convener: E. Jensen)  Superconducting RF acceleration system (convener: O. Napoly) ESGARD recommendations A first meeting was help on October 30 at CERN Considering the proposals received so far, ESGARD recommends the following priorities

Starting from the LoI received, the working groups are expected to establish  a consistent set of prioritized Joint Research Activities, including a first estimate of the needed resources for each activity,  Identify the infrastructures that will benefit from the proposed R&D,  Identify the infrastructures that could be subject to Transnational Access,  A consistent set of Networking Activities related to the R&D activities  The laboratories/institutes/universities that would participate to the different activities.  A possible coordinator for each NA, TA and JRA It is expected to get a first report from these working groups during the CARE06 meeting in Frascati from November 15 to 17, Mandate of the Working Groups

Conclusion ESGARD has started the process for coordinating the next round Accelerator R&D project The call for LoI has shown that there is a strong interest from the community to strengthen further the accelerator R&D program in Europe ESGARD will meet on December 5 th to review the situation and discuss the next steps ESGARD has set up working groups to propose a consistent set of Networking, Transnational Access and R&D activities