ERCOT PUBLIC 1 2016 LTSA Introduction. ERCOT PUBLIC 2 Outline  Background  2016 LTSA Process  2016 Scenario Development Process  2016 LTSA Schedule.

Slides:



Advertisements
Similar presentations
Integrated Resource Planning: An overview Mark Howells & Bruno Merven Energy Research Centre Energy Research Centre University of Cape Town.
Advertisements

October 8, 2013 Eric Fox and Mike Russo. AGENDA »Recent Sales and Customer Trends »Preliminary State Sales and Demand Forecast »Building a No DSM Forecast.
2012 Long-Term Load Forecast Update ERCOT Calvin Opheim December 3, 2012.
1 Econometric Load Forecasting Peak and Energy Forecast 06/14/2005 Econometric Load Forecasting Peak and Energy Forecast 06/14/2005.
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
NERC LTRA Update / CDR Capacity Counting Issues
1 March 2-3, 2015, Bonn Expert workshop Addressing Variable Renewables In Long‐Term Energy Planning (AVRIL) Renewables Energy Integration In Long‐Term.
ERCOT PUBLIC 10/21/ LTSA Update October 21, 2014.
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
2011 Long-Term Load Forecast Review ERCOT Calvin Opheim June 17, 2011.
ERCOT PUBLIC 4/22/2014 Updates for 2014 LTSA Scenario and Data Assumptions 4/22/2014.
ERCOT PUBLIC 7/10/ LTSA Scenario Development.
ERCOT PUBLIC 2/14/ LTSA Scenario and Data Assumptions February 14, 2014.
ERCOT PUBLIC 3/25/ LTSA Scenario and Data Assumptions March 25, 2014.
ERCOT PUBLIC LTSA Scenario Workshop. ERCOT PUBLIC 2 Outline  Overview of scenario development workshops  List of shortlisted scenarios  Scenario.
Value and Cost of Distributed Generation ACC Staff Workshop #1 – May 7, 2014 Docket No. E-00000J DG Valuation ─ Lessons from the APS Distributed.
SLIDE 1 AEMO INDEPENDENT ASSESSMENT OF NSW & TAS NETWORKS July 2014 PRESENTED BY NATIONAL PLANNING.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
ERCOT PUBLIC 7/14/ Long-Term Load Forecasting Calvin Opheim ERCOT Manager, Forecasting & Analysis LTSA Scenario Development Workshop July 14, 2015.
2015 RTP – Study Scope of Short Circuit Analysis RPG Meeting May 19,
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
ERCOT PUBLIC LTSA Introduction. ERCOT PUBLIC 2 Outline  Background  2016 LTSA Process  Summary of first LTSA Workshop  Topics and Speakers.
1 18-Month Outlook October March 2005 Presented by Greg Hine IMO Long-Term Forecasts and Assessments.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
Generation Adequacy Task Force Update to WMS September 14, 2011.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
ERCOT PUBLIC 5/20/ RTP Inputs and Assumptions May 20, 2014.
Generation Deliverability Criteria PLWG September 17, 2014 Jeff Billo, ERCOT 1.
ERCOT PUBLIC 6/17/ LTSA Load Distribution Methodology June 17, 2014.
PJM©2015 Updates to PJM Load Forecast Model OPSI Annual Meeting October 12, 2015 Tom Falin Manager – Resource Planning
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
© Copyright 2013, First Solar, Inc. Establishing Accurate Power Generation Cost Assumptions for ERCOT Planning Colin Meehan – Director, Regulatory and.
November 12, 2010 Regional Planning Group Long-Term System Assessment Project Update Warren Lasher Manager, Long-Term Planning and Policy Jonathan Rose.
VIRTUAL NET METERING AND LOCAL NETWORK CHARGES IN AUSTRALIA: AN UPDATE Smart Future Cities Conference 2015, Newcastle, NSW, October 1 st 2015.
BUILDING A LEVEL PLAYING FIELD FOR DISTRIBUTED ENERGY WITH LOCAL NETWORK CREDITS AND VIRTUAL NET METERING Jay Rutovitz, Institute for Sustainale Futures.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
ERCOT PUBLIC 10/7/ Load Forecasting Process Review Calvin Opheim Generation Adequacy Task Force October 7, 2013.
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
Supply Assumptions for Investment Planning Transmission Planning Code Workshop 1 3rd April 2008.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
Ancillary Services Redesign Update ERCOT TAC Meeting /25/2015.
Long Term Study Transmission Results May 21 st, 2013.
Long Term Study Task Force Update Modeling Emerging Resources Through 2030 January 13, 2012 LTSTF.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
ERCOT – MISO DC Tie Study Comments
2006 Report on the Capacity, Demand, & Resources for the ERCOT Region Technical Advisory Committee June 1, 2006 Kenneth A. Donohoo. P.E. Manager, Transmission.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
ERCOT PUBLIC 5/20/ LTSA Current Trends Scenario Results May 20,2014.
IDAHO STATE ENERGY PLAN Capabilities Overview. OBJECTIVES Help identify Plan objectives Help outline current Idaho energy situation Assess future energy.
The Wholesale Market Subcommittee Update Prepared for the July 31st TAC meeting.
ERCOT – MISO DC Tie Study Regional Planning Group November 20, 2015.
Hypothetical Examples of How Residential Photovoltaic (PV) ESI IDs Could be Settled ERCOT Load Profiling.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
Hybrid Forecast for Resource Adequacy Analysis with recommendations Massoud Jourabchi April
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
1 ERCOT 2015 West Texas Study November 18, 2014 Jeff Billo.
California Energy Commission 2015 IEPR Common Cases Introduction and Overview 2015 IEPR Workshop Rosenfeld Hearing Room February 26, 2015 Ivin Rhyne Supply.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
LTSA Scenario Development Workshop
Economic Forecast Review
LNBA Subgroup: Avoided Transmission Value
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
The Role of Efficient Electrification in the Future Energy System
Infrastructure Needs and Our Electric Grid for the 21st Century
Presentation transcript:

ERCOT PUBLIC LTSA Introduction

ERCOT PUBLIC 2 Outline  Background  2016 LTSA Process  2016 Scenario Development Process  2016 LTSA Schedule  Topics for Expert Presentations  Next Steps

ERCOT PUBLIC 3 Background  Senate Bill 20 (79th Legislature, 1st Called Session [2005]) requires that the PUCT and ERCOT study long-term system needs and report to the Legislature each even numbered year  ERCOT has been conducting a Long-Term System Assessment (LTSA) on a biennial basis since 2006  ERCOT recently completed its 2014 LTSA in which reliability and efficiency of ERCOT System was assessed for the years 2024 and 2029  Future load and generation build was developed across ten scenarios four of which were studied for Transmission Expansion

ERCOT PUBLIC 4 The 2014 LTSA  Work on LTSA was bolstered by grant from the Department of Energy  Brattle facilitated a stakeholder-driven scenario development process  Scenario development workshops were successful in designing diverse futures while considering a large array of drivers and trends  Load forecasting and generation expansion methodologies were improved based on lessons learnt in the DOE study  Transmission analysis process was updated further to be more consistent with the near term analysis

ERCOT PUBLIC 5 Key lessons learned from the 2014 LTSA  Stakeholder-driven scenario development was very beneficial in seeking out different perspectives about ERCOT Grid’s future  Scenario based approach works - and the LTSA should strive harder to consider diverse scenarios “think low global oil prices”  Most scenario’s studied showed a high penetration of Solar generation – and the LTSA needs to work harder to incorporate Solar PV on both sides of the meter  LTSA is a very resource intensive analysis – and it deserves more time for analysis

ERCOT PUBLIC LTSA Scope and Process Scenario Development Stakeholder driven review of previous LTSA Expert presentations with focus on key drivers for current LTSA Finalize scenario descriptions and assumptions for current LTSA Load forecasting Develop 8760-hour load forecasts for each scenario with normal weather assumptions Develop 90 th percentile summer peak forecast for each scenario Generation Expansion Identify amount of generation added and retired by technology based on scenario description Identify potential sites for new generation Transmission Analysis Build start cases based on the LTSA Scope and scenario descriptions Perform reliability analysis Perform economic analysis Identify transmission projects to address economic and reliability needs

ERCOT PUBLIC 7 LTSA Schedule TaskDate Scenario DevelopmentJuly, 2015 Load Forecasting and Generation Expansion December, 2015 Transmission AnalysisJuly, 2016 LTSA Report PublishedNovember, 2016

ERCOT PUBLIC 8 Questions?