Electronics for Range System Prototype Tests A. Piskun ITEP, Moscow, 28 April, 2010.

Slides:



Advertisements
Similar presentations
The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
Advertisements

20/Oct./2000 CF IEEE NSS 2000 at Lyon,France 1 An MWPC Readout Chip for High Rate Environment Introduction ASIC Structure & Fabrication ASIC Evaluation.
JLab High Resolution TDC Hall D Electronics Review (7/03) - Ed Jastrzembski.
Present Status of GEM Detector Development for Position Counter 1.Introduction 2.GEM 3.Readout Board 4.Fabrication Test 5.Large GEM 6.Readout Electronics.
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
U niversity of S cience and T echnology of C hina Design for Distributed Scheme of WCDA Readout Electronics CAO Zhe University of Science and Technology.
Preliminary Design of Calorimeter Electronics Shudi Gu June 2002.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Derandomiser block E.Atkin, A.Kluev MEPhI,A.Voronin SINP MSU.
Readout ASIC for SiPM detector of the CTA new generation camera (ALPS) N.Fouque, R. Hermel, F. Mehrez, Sylvie Rosier-Lees LAPP (Laboratoire d’Annecy le.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
January 22, 1999SciFi L1 Trigger Review 1 Analog Hardware Front-end Board (CTT_FE) –Transmit (and split) the VLPC signal to the Multi-chip Modules –Discriminate.
Commissioning of ICAL prototype detector electronics B.Satyanarayana TIFR, Mumbai.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
Mircea Bogdan, NSS2007 Oct. 27-Nov.3, 2007 – Honolulu, Hawaii1 Custom 14-Bit, 125MHz ADC/Data Processing Module for the KL Experiment at J-Parc M. Bogdan,
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Front-end readout study for SuperKEKB IGARASHI Youichi.
1 G.Pessina, RICH Elec Upg, 11 April 2010 Analog Channels per chip4 to 8 Digital channel per chip4 to 8 Wire-bond pitch (input channels) Input capacitance.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
ERC - Elementary Readout Cell Miguel Ferreira 18 th April 2012
L.Royer– Calice LLR – Feb Laurent Royer, J. Bonnard, S. Manen, P. Gay LPC Clermont-Ferrand R&D pole MicRhAu dedicated to High.
ASIC Activities for the PANDA GSI Peter Wieczorek.
Meeting from Mai 10th at ETHZ ArgonTube electronics Charge amplifier or linear amplifer ? Front end module Max Hess.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
S. Bota – Calorimeter Electronics overview - July 2002 Status of SPD electronics Very Front End Review of ASIC runs What’s new: RUN 4 and 5 Next Actions.
M. TWEPP071 MAPS read-out electronics for Vertex Detectors (ILC) A low power and low signal 4 bit 50 MS/s double sampling pipelined ADC M.
Prototype Sensor Status and Measurements u Sensor Response Measurements u Mechanical Response u Noise Expectations u DAQ Status.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
Current Status of RICH LVL-1 Trigger Module Takashi Matsumoto and Ken Oyama Presentation Outline Topics Geometry of Trigger Tile Required function of RICH.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
G.F. Tassielli - SuperB Workshop XI LNF1/11 02/12/2009 Status report on CLUster COUnting activities G. F. Tassielli on behalf of CLUCOU group SuperB Workshop.
FRRC - PANDA Meeting, Moscow / ITEP, May 26, 2015 G.Alexeev (for muon group) Muon System Status Report * Approval of Muon TDR by FAIR Council (22 Sept.
Analog Circuits Hiroyuki Murakami. CONTENTS Structure of analog circuits Development of wide linear range CSA system Problem of analog circuits How to.
BMBF-JINR PANDA Meeting, Dubna, November 15, 2013 G.Alexeev (for muon group) Status of Project and Related Topics * Report to the Muon Review Panel ( CERN,
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
G.Alexeev for Dubna group ITEP, April 28, 2010 Muon System Status Report from Dubna Hardware : * Full Scale prototype - in preparation to be put in work.
STATUS of BIG PROTOTYPES A. Piskun (for Dubna group) Protvino, 7 June 2011 _________________________________________________ Full Scale Prototype Range.
Work on Muon System TDR - in progress Word -> Latex ?
M. Manghisoni, L. Ratti Università degli Studi di Pavia INFN Pavia
Electronics for Range System Prototype Tests
Novosibirsk, September, 2017
DCH FEE STATUS Level 1 Triggered Data Flow FEE Implementation &
KLOE II Inner Tracker FEE
CTA-LST meeting February 2015
MDT and analog FEE mass production:
Dubna/JINR Status & Plans
DCH FEE 28 chs DCH prototype FEE &
G.Alexeev for Dubna group ITEP, April 28, Muon System Status Report from Dubna.
News on second coordinate readout
Hall A Compton Electron detector overview
Front-end electronic system for large area photomultipliers readout
LHCb calorimeter main features
BESIII EMC electronics
HallD Collaboration Meeting Jefferson Lab December 11-13, 2003
Presentation transcript:

Electronics for Range System Prototype Tests A. Piskun ITEP, Moscow, 28 April, 2010

VME crate 6U STRIP R/O digital WIRE R/O analog & digital RW-TDC QTC–16 ASum-96 ADB-32 (A-32) A2DB-32 analog digital COMPASS CATCH DAQ VME crate 9U MWDB units Hot link cables Range System Prototype Readout Scheme to DAQ crate

Digital R/O Block DiagramA-32 Strip R/O ADB-32MWDB STRIP SIGNALS (2304 channels) CATCH MWDB WIRE SIGNALS (2304 channels) CATCH Wire R/O Preamplifier Board (72) Amplifier-Discriminator Board (72) Muon Wall Digital Board (24 total) 1 unit Double Amplifier-Discriminator Board (72) (Digital output) A2DB-32

Analog (wire) R/O Block Diagram WIRE SIGNALS (2304 channels / 96 per layer) ASum-96 A2DB-32 A2DB-32 A2DB-32 3 boards per layer 1 board per layer 24 total QTC-16 Charge-to-Time Converter 2 boards total RW-TDC CATCH Analog output

Double Amplifier-Discriminator Board (A2DB-32) 2 modes of amplification: K1= 65 mV/uA K2=420 mV/uA Designed both for wire and strip R/O Analog and 2 digital (ECL, LVDS) outputs Low noise: I noise r.m.s = 38nA Low cross talk < -45 dB Status: “table-top” tested, ready for production (80 with spares)

Front-end Electronics for Strip R/O 32-channel preamplifier board A-32 v.3; prototype manufactured and tested; ready for production (80 with spares) 32-channel amplifier- discriminator board ADB-32; tested in D0/FNAL and COMPASS/CERN (MW1); ready for production (80 with spares)

Analog Summator Board (ASum-96) Status: designed and being manufactured, need to produce 30 (with spares)

ASum-96 Schematic Circuit Diagram

ASum-96 PSpise Modeling Yellow – input signal (from A2DB-32 analog output) Red – 1 st summing stage output Blue – 2 nd summing stage output Green – output buffer signal

Charge –to-Time Converter (QTC-16) Status: “table-top” tested, 2 boards manufactured, 1 spare needed

Muon Wall Digital Board (MWDB) Status: tested in COMPASS (MW1), 5 ready, need to produce 21(with spares) 192-channel register based on 6 F1 chips

Status of Units: A2DB-32 “Table-top” tested, 72 boards needed, to produce 80 (with spares) A-32 “Table-top” tested, 72 boards needed, to produce 80 (with spares) ADB-32 Tested in D0/FNAL and COMPASS/CERN (MW1), 72 boards needed, to produce 80 (with spares) ASum-96 Designed and being manufactured, needs final test, to produce 30 (with spares) QTC-16 “Table-top” tested, 2 boards produced, to produce 1 spare RW-TDC Tested in COMPASS/CERN (RW), need to borrow 2 units (from Rich Wall) MWDB Tested in COMPASS/CERN (MW1), 24 needed, 5 boards produced, need to produce 21 (with spares) CATCH Need to borrow 2 units (from COMPASS)