10/09/10FV 1 News and observations from Brussels' meeting.

Slides:



Advertisements
Similar presentations
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
Advertisements

Status of the LAV electronics G. Corradi, C. Paglia, D. Tagnani F. Gonnella, M. Raggi INFN LNF F. Gonnella, M. Raggi INFN LNF Photon Veto WG CERN 13/12/2011.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Cabling and connectors for future LAV stations Mauro Raggi LAV working group CERN 26/10/2009.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Challenges and Overview From Technical Coordination 27/08/2013 -FH1.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
“Status of TDAQ for the 2012 runs” Gianluca Lamanna (CERN)
“TDAQ for 2012 runs” Gianluca Lamanna (CERN) Annual review meeting
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Status of NA62 straw electronics Webs Covers Services Readout.
Overview, remarks, lamentations, hope and despair M. Sozzi TDAQ WG meeting CERN - 4 June 2013 Introduction, news and appetizer.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
NA62 TDAQ WG Meeting News and usual stuff M. Sozzi CERN – 29/5/2009.
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
André Augustinus 16 September 2002 Muon tracker URD summary or, what we understand from the URD.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
“Planning for Dry Run: material for discussion” Gianluca Lamanna (CERN) TDAQ meeting
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
LAV thresholds requirements Paolo Valente. LAV answers for Valeri’s questions (old) 1.List of hardware to control (HV, LV, crates, temperatures, pressure,
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Status of the NA62 network R. Fantechi 23/5/2012.
TDAQ news and miscellaneous reports M. Sozzi NA62 TDAQ WG meeting CERN – 13/7/2011.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
22/03/11FV 1 NA62 DCS CAN bus lines. Short reminder General properties of CAN bus o Up to 64 nodes on one bus o Different devices need different buses.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
LAV electronics status report Mauro Raggi and Francesco Gonnella TDAQ meeting NA62 Collboration Meeting 1-5 September 2014 Ferrara.
Status Report TOTEM Collaboration Meeting 17-NOVEMBER-2014
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
Straw (T)DAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
“Technical run experience” Gianluca Lamanna (CERN) TDAQ meeting
09/09/10FV 1 NA62 common crate project. Crates survey result VF2 09/09/10 VME High populated TELL1 High populated TELL1 (Spare) Low populated TELL1 Low.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
LKr status R. Fantechi.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
DCS WG report 9/09/11 FV.
352MHz Klystron Control for the 3MeV Linac test stand
INO TRIDAS presentations
M. Sozzi NA62 TDAQ WG meeting CERN – 20/10/2010
DCS WG report 9/09/11 FV.
TPC Detector Control System
Presentation transcript:

10/09/10FV 1 News and observations from Brussels' meeting

News and personal observations from the collaboration meeting Synchronization run in 2011 was widely discussed. A working group will assess its feasibility during coming weeks. Final decision will be taken during analysis meting at the end of October DCS funding for 2010 was approved by Steering Committee DCS WG presentation was positively received. The FSM and ORACLE are endorsed. More and more groups start to think about DCS (LAV, Straw, CEDAR) Extensive discussion of “common NA62” crate VF2 10/09/10

ALPHA Run in ≈Nov. 11 Equipment that could be Installed and used (partly):  7 to 8 LAV with partial readout  1 or ½ STRAW Tracker  CHOD ( Readout ?)  IRC (final), SAC (prototype)  LKR (SLM readout)  MUV3 + absorber wall  Vacuum system (various options possible) Closing vac. Tank > Straw 1. Vacuum continuation between Straw 1 and IRC tbd. Partial Vac. System (target mbar)  Electronic racks (partly)  Temporary TDAQ system, but (prototypes) final components (LTU, TEL62,…) What can we realistically achieve ? 07/09/ FH 3 ALPHA-RUN 2011

Beam Option (1) Run with Muons. Hadrons stopped in TAX. After Straw 1, no beam tube, MNP33 off. Optional vacuum up to STRAW 1. Beam dump ( not needed) 07/09/ FH 4 ALPHA-RUN 2011

There is request to integrate threshold settings and reading (LAV). Apparently it was done in LHCb. Probably some “off the shelf” solution already exist (see LAV slides) Unfortunately some groups are coming with request of non standard equipment integration: o CEDAR feedback loop for chiller temperature control HV: Propose building a 30 + channel HV supply as a double-width 6U VME module. 8 modules / crate plus VME CPU with Ethernet for remote control. LV Supplies: +/- 5V to each sector from VME module We should be ready to collaborative work (common programming standards, documentation, etc). VF5 10/09/10

6 LAV: DCS requirements FEE boards The structure of our slow control system consists of 4 CAN line : 1 for Crate VME9U 1 for Tell62 1 for HV system 1 for 8 Front End board

7 LAV: DCS requirements FEE boards 1) VME 9U crate Monitoring Items Reading cycle per Status ON/OFF/Error 30 sec or even more Voltages/currents 30 sec or even more Crate temperature 30 sec or even more Fan Speed 30 sec or even more Actions: ON/OFF/Rest communication 2) TELL1 Monitoring (Ask Marco Sozzi) 4) FEE Monitoring dedicated CAN-Open line (8 boards) Monitoring Items:Reading cycle per Status ON/OFF/Error30 sec or even more Voltages30 sec or even more Boards temperature30 sec or even more Thresholds (2x32 ch L/H)30 sec or even more Actions:N channels Set threshold value(2x32 ch L/H) Set test pulse signal 3) HV Monitoring (to be defined)

HV – about 16 channels needed (4 – IRC, 6-9 – SAC) o Can use a standard market HV supply o An alternative solution is under consideration: HPD HV for CMS 2000V, Imax=1mA, Stability – 1V, pusations ~ 5mV. Price ~3000 euro per 16 ch, including crate + controller (RS232) VF8 10/09/10 IRC and SAC