Tripartite meeting Beijing, China, 8-9 November 2008 Agenda item 4.1 Early Warning System Konstantin Petrov Manager, External Relations, Lloyd’s Register.

Slides:



Advertisements
Similar presentations
IMO Goal Based New Construction Standards Seminar in Heraklion 17 October 2005 Dragos Rauta INTERTANKO.
Advertisements

Andy Alderson – Head of RINA UK Chairman IACS EG/Coatings
Tips and Resources IASC Cluster/Sector Leadership Training
Shipbuilding Intellectual Property Protection CESA/GuardSHIP Rotterdam, 4 February 2010.
More CMM Part Two : Details.
Contractor Business System Rule Revision #, Date (of revision) Presented By: Kendrick Dickerson, PA, DCMA Property Group May 3, 2013.
PROJECT MANAGEMENT ETHICS
Faculty Separations Carmen Shockley Director, Academic Personnel Services August 18, 2014.
IMO Goal Based Standards for New Ship Construction Roberto P. Cazzulo RINA Member of IACS Council Former IACS EG GBS Chairman.
Tripartite Meeting Beijing, 1 November 2005 IMO GBS Classification Society’s View about the Scope, Verification Process and Acceptance Criteria Roberto.
Software Configuration Management
IACS Requirements.
Classification Societies – Contribution to Martime Safety Gesa Heinacher-Lindemann LL.M., Legal Director.
24/03/2006 Introduction to IMO Performance Standard for Protective Coating and IACS Common Structural Rules BV Surveyor’s Training Development Department.
Client Name is.... Dr Lynda Speed
157° Session of the Committee for Agriculture Codes and Schemes – Tractor Codes 30 November 2011 Sandro Liberatori – Chair of the OECD Tractor Codes.
1 Welcome to the International Right of Way Association’s Course 104 Standards of Practice for the Right of Way Professional 104-PT – Revision 3 – INT.
Tripartite Discussions 31st Oct – 1st Nov 2005, Beijing Quality control on new buildings - Role and authority of Class Speaker – Robert Smart LR IACS Council.
2014 SPE Engineering and Professionalism Committee.
Tanker performance and Annex VI compliance Manager Research and Projects St. Petersburg 25 November 2008 Vostoc Capital’s The.
Mediterranean MoU 7th Committee Meeting on PSC Alexandria, EGYPT 31st January - 2nd February A Presentation by INTERTANKO Port State Control Capt.
IACS Tanker Visions – A Class Act Presented by Igor Ponomarev IACS Chairman.
NERC Data Collection & Coordination. Rules of Procedure: Section 1600 Overview  NERC’s authority to issue a mandatory data request in the U.S. is contained.
1 GOVERNANCE in COMMUNITY ORGANISATIONS Community Solutions- NESB Community Safety Development and Coordination Project Auspiced by Illawarra Forum Inc.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ATIS Intellectual Property Rights Activities 2011 – An Update Thomas Goode General Counsel, ATIS.
Introduction Arrangements Louis P. Piergeti VP, IIROC March 29, 2011.
Transmitted by the representative of JAPAN Toward Realization of the “Mutual Recognition of International Whole Vehicle Type Approval (IWVTA)” under the.
REGIONAL WORKSHOP OF THE CAPACITY DEVELOPMENT FOR CDM PROJECT 16TH TO 18TH 2004 MAPUTO, MOZAMBIQUE Review and Future Plans:Sensitization and Capacity Development.
Dr Opio C K (TM) Quality assurance at FOM Quality assurance committee.
Parliamentary Oversight and the UNCAC Mitchell O’Brien Parliamentary Strengthening Program World Bank Institute November
Agenda item 3.4 IACS UR on Hull Survey of New Ship Construction (UR Z23) Sverre J. Dahl Det Norske Veritas Chairman of IACS GPG Tripartite th –
Tripartite meeting Beijing, 8-9 November 2008 Status and Early Experience of CSRs Gary Horn Director Rules & Standards, ABS IACS Hull Panel Chair.
Balance between Intellectual Property Rights and Design Transparency Tripartite meeting Beijing, 8 th - 9 th Nov *** A GBS-related issue *** O Kitamura.
Tony Keane Executive Director Lou Vincent President NACE International Tripartite Conrad Hotel Tokyo, Japan September 2007 Coatings Inspection &
Agenda Corrective/Preventative Action Internal Auditing Management Review.
Tripartite Meeting Seoul, Korea, September 2009 Safety & SOLAS Agenda item 4.1 Goal-Based Standards --- application and compliance --- Toshiro Arima.
Verification of Energy Conservation of Major Energy- Consuming Entities in China DUAN Maosheng Tsinghua University, Beijing, China March 9-10, Seoul.
Hull Survey for New Construction Z23 (July 2006) John Finch Chairman IACS expert group on the Hull survey for New Construction September 2006.
Chris Albrecht Legal Counsel JGC Leadership Training
1 IACS Common Structural Rules INTERTANKO LATIN AMERICAN PANEL Rio de Janeiro, 25 April 2006.
Tripartite meeting Japan, Tokyo, 20 – 21 September 2007 Agenda item 3.2 Status and Early Experience of CSR Kirsi Tikka Vice President, ABS Global Technology.
WP5 – SEE Cluster Policy Learning Mechanisms 3° Steering Committee Meeting Thessaloniki,
ISMS Implementation Workshop Adaptive Processes Consulting Pvt. Ltd.
ISO Registration Common Areas of Nonconformances.
Tripartite Meeting September 2006 Seoul, Korea Item B12. CSR Maintenance Procedures - feedback and commentary mechanisms on Q&As, CIs and Rule Change Proposals.
Doc.: IEEE /0698r0 Submission May 2015 Xiaoming Peng (I2R)Slide 1 Date: Authors: IEEE aj Task Group March 2015 Report.
Doc.: IEEE / 0404r0 Submission March 2015 Slide 1 TGax PHY Ad Hoc March 2015 Meeting Agenda Date: Authors:
Tripartite meeting Korea, Seoul, 14 – 15 September 2006 Agenda B.10 Sharing information for ships in service (incident information sharing) Konstantin.
2002 CLRS - Arlington, VA Reserve/Opinion Issues from a Regulatory Perspective Proposed Revision to the NAIC Annual Statement Instructions Richard Marcks,
Compliance Issues – Kyoto Protocol ______________ M.J. Mace, FIELD Workshop for LDC Negotiators UNFCCC COP 11 and Kyoto Protocol COP/MOP November.
Doc.: IEEE /0507r0 Submission TGaj CC12 on 10 April 2014 Report Author: Date: NameCompanyAddressPhone Haiming WANGSEU/CWPAN 2.
NAMEPA - Strengthening Your Culture Of Compliance
EMSA Study on DH Tanker Safety Tripartite Discussions Beijing 2005, 31 st Oct – 1 st Nov Agenda Item Europe EMSA Study on DH Tanker Safety.
Tripartite Discussions Beijing 2005, 31 st Oct – 1 st Nov Agenda Item Europe 3 rd Maritime Safety Package Speakers: Chris Horrocks Secretary General.
POST-TENURE REVIEW University Senate July 8, 2008.
Summary of GSC-13 IPR WG Meeting Tom Goode, ATIS IPR WG Chair DOCUMENT #:GSC13-CL-05r1 FOR:Presentation SOURCE:Tom Goode, IPR WG Chair AGENDA ITEM:3.4.
Vessel classification Current issues and developments within IACS Tom Boardley Lloyd’s Register Marine Director IACS Chairman 18 March 2013.
Doc.: IEEE /0846r0 Submission July 2015 Slide 1 Date: Authors: IEEE aj Task Group July 2015 Report Jiamin Chen (Huawei/HiSilicon),
Fostering worldwide interoperabilityGeneva, July 2009 ATIS Intellectual Property Rights Policy Review Thomas Goode General Counsel, ATIS DOCUMENT.
Tripartite Discussions 31st Oct – 1st Nov 2005, Beijing Quality control on ship repairs Speaker – Robert Smart LR IACS Council Member Agenda Item
Prof.V.M.Mohamed Ali Ship Registration and Classification.
Software Project Configuration Management
A study on Fatigue Strength for Tank Structures subject to
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
The Federal programs department September 26, 2017
Testing and Certification according to ISO and ISO 17065
DSC Default Process January 2019
Summary of GSC-13 IPR WG Meeting
Census Implementing Regulations
Technology Bob Dohrer, Technology Working Group Chair
Presentation transcript:

Tripartite meeting Beijing, China, 8-9 November 2008 Agenda item 4.1 Early Warning System Konstantin Petrov Manager, External Relations, Lloyd’s Register LR IACS General Policy Group Member

IACS EWS Review 2007 Tripartite – IACS reported: – What has triggered the review of Procedural Requirement 2 on EWS – Technical discussion on revision of PR2 (2007 status - 95% complete) – Challenges in implementing PR2 – confidentiality of ship specific information (2007 status – under revision)

IACS EWS Review New clause accepted by IACS Members: Notwithstanding the general duty of confidentiality owed by [society] to its client in accordance with the [society] Rules, [society] clients hereby accept that [society] will participate in IACS’ Early Warning System which requires each IACS Member and Associate to provide its fellow IACS Members and Associates with relevant technical information on serious hull structural and engineering systems failures, as defined in the IACS Early Warning System (but not including any drawings relating to the ship which may be the specific property of another party), to enable such useful information to be shared and utilized to facilitate the proper working of IACS’ Early Warning System. [society] will provide its client with written details of such information upon sending the same to IACS Members and Associates.

IACS EWS Review Action to address the change of the clause: Understanding the mechanism to identify sister and similar ships. Testing to know whether it would be possible to identify sisters and similar ships based on a limited set of information such as main dimensions.

IACS EWS Review Test ship: Bulk Carrier, 5 Holds, DWT: 43499, 1969 GT: 25768, Build: 1985, Lbp: , B: 30.01m, D: Result: First probable Sister Vessel Iran Ashrafi, IMO Nr , DNV, Bulk Carrier, ? Holds, DWT: 43499, 1969 GT: 25768, Build: 1985, Lbp: , B: 30.03m, D: Built OKPO, Daewoo Korea

IACS EWS Review

What’s next? The PR 2 was approved by IACS and is currently with IACS Quality Committee for auditability review. Target entry into force date – 1 July 2009 Pilot the Scheme in IACS.