MDT Gas System Monitoring Emilio Nanni Stepan Kovar July 5 th 2007 UM/CERN REU Summer 2007.

Slides:



Advertisements
Similar presentations
BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
Advertisements

TILDE DST & DMS Software Decision Support Tool & Data Management System for Leakage and Water Loss Management.
E.K.Stefanides March 07, The Muon Spectrometer of the ATLAS detector: progress report on construction and physics studies at the University of Athens.
Homogeneity of Small Chambers T4, T6, T7, T8 and Gas Gain Measurements of Frascati and Roma Chambers Emmanuel Angulo (CSU Fresno) Weekly Meeting ATLAS.
Proposal Analysis Review NMSGC Student Launch University/Institution Team Members Date.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
Project BlueDate. The development team Petrus Bergman - Configuration manager Oskar Holmlund – Requirements manager Mikael Nilsson – Design manager Kristian.
Background Background Importance of Project: Importance of Project: Gas Prices Gas Prices Energy Prices Energy Prices Transportation needs Transportation.
ATLAS BIS MDT wiring facility D. Fassouliotis P. Ioannou S. Igropoulos C. Kourkoumelis V. Pancheluga D. Pappas E. Stefanides V. Birioukov (engineer from.
IMPORT WIZARD 491a Summer 2005 Roudabeh Moraghebi.
GRAND Britni Bethune CROP 2002 G amma R ay A strophysics at N otre D ame The University of Notre Dame is located north of South Bend, Indiana The University.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
Remotely monitor and control a DCS (Distributed Control system) system of a miniature Oil platform through a 2D representation model Presented by - Kirthy.
Type of Material: Instrumentation Review
MDT PS DCS for ATLAS Eleni Mountricha
Overview of Informatics
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
Manoj Kumar Jha INFN – Bologna On Behalf of ATLAS Muon Calibration Group 20 th October 2010/CHEP 2010, Taipei ATLAS Muon Calibration Framework.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
Instrumentation Review. Direct and Indirect Ionization Direct - Charge particles that strip away electrons from atoms Indirect - uncharged that have to.
Simulating the Effects of Wire Sag in ATLAS’s Monitored Drift Tubes Ashley Thrall, Vassar College ‘04 Dan Levin, Mentor REU Presentations August 5, 2004.
1 INNOVATIONS 2001 Organized by The Clear Lake Council Of Technical Societies (CLCTS) in cooperation with and co-sponsored by CLCTS member organizations.
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
Muon System Safety Issues Burkhard Schmidt.
UT Arlington Summer REU 2013 Dr David Wetz Greg Turner Lateef Taiwo Midterm Report July 16, 2013.
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
Aging Studies for the ATLAS MDTs Dimos Sampsonidis for the ATLAS group of Thessaloniki.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
SIST 2004 SIST Ayodele Onibokun August 10, 2004 Based on the code developed by: Henry Barnor, Fermilab Summer Student D ø Calibration Database Browser.
A Study of Back Diffusion in the ATLAS Muon Spectrometer Gas System Gordon Berman University of Michigan Advisors: Bing Zhou, Dan Levin, and Zhengguo Zhao.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
What functionality of each group people will get Customer Sales Agent Sales Manager National Manager Managing Director.
Fish Identification Systems Thabang Kgwefane Supervised by Mehrdad Gazi-Asgar & James Connan.
Analyzing Praxial Platform Positions on MDT Barrel Chambers Using X-Ray Tomograph Measurements Chris Hayward Advisor: Silvia Schuh August 14, 2003 UM CERN.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
Lecture 1: Introduction – Graduation Projects Topics to Discuss in Lectures 1. Project Deliverables 2. Course grading 3. Project Concept Writing.
Track Selection Performance of the CMS Cathode Strip Chamber Track Finder and Level 1 Trigger Kristin Beck Advisors: Dan Holmes, Darin Acosta 14 August,
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Single tube detection efficiency BIS-MDT GARFIELD Simulation GARFIELD Simulation Anode wire voltage as a function of the distance from the wire Electric.
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
2.0 PROJECT INITIATION AND PLANNING The initiating and planning are the phase where process or workflow to develop the system will identify and planning.
1 HCHSA Safety Group Meeting May 16, 2005 Safety Group Program Update Safety Group Profile Action Plan Feedback Progress Reports Summer Visits Year-end.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
STUDY ABROAD IN ITALY CIMBA OVERVIEW Spend a semester or summer in Northern Italy Explore Europe with independent travel days Experience.
Maria del Carmen Barandela Pazos CERN CHEP 2-7 Sep 2007 Victoria LHCb Online Interface to the Conditions Database.
The Collider Detector at Fermilab (aka CDF) Jennifer Pursley Intermediate Seminar Oct. 28, 2003.
David Finley / PPD Engineering Meeting / June 24, Fermilab Slide 1 R&D Toward Large Liquid Argon Time Projection Chambers “Large” means up to 100.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
Performed at Brookhaven National Lab for Fermilab Main Injector Electron Cloud Studies June 2009 Linda Valerio September 11, 2009.
Indicator and Warning.
Zhe Yang Michigan REU Program Symposium August 9, 2017
Flow Chart to Support Appraisal Process
Llea Nasira Samuel Benedict College Charlotte Wood-Harrington
ATLAS Muon Spectrometer Calibration
ATLAS MDT HV – LV Detector Control System (DCS)
Cosmic Test Updates Vito Palladino 16/12/2013.
Energy Management at DESY and a new Energy Monitoring System

Models in Engineering Action Plan Name.
Entrepreneur Discovery
UK Link Manual Update (UNC Modification 0613)
Status and plans for bookkeeping system and production tools
Security Diagram Template
DBA Capture Diagram Template
Presentation transcript:

MDT Gas System Monitoring Emilio Nanni Stepan Kovar July 5 th 2007 UM/CERN REU Summer 2007

Overview  Personal Background  Intro to PVSS  Monitored Drift Tube (MDT) Chambers  First Project  Conclusion UM/CERN REU Summer 2007

Personal Background  University of Missouri - Rolla  Majoring in Physics and Electrical Engineering  3 Weeks touring Northern Italy – especially Bologna UM/CERN REU Summer 2007

Personal Background UM/CERN REU Summer 2007

Personal Background  Important Lesson Learned UM/CERN REU Summer 2007

PVSS  Main framework is PVSS (Process Visualization and Control System) UM/CERN REU Summer 2007

Monitored Drift Tube Chambers  Hollow tube filled with Argon gas and a wire at HV  Muons ionize the Argon gas  Current flow is detected UM/CERN REU Summer 2007

Monitored Drift Tube Chambers  Overall Control System UM/CERN REU Summer 2007

First Project  Learn to use PVSS  Store information concerning the arrangement of the gas system for the MDT Chambers in an Oracle Database  Make this information available for update  Verify a new user has up to date information UM/CERN REU Summer 2007

First Project UM/CERN REU Summer 2007

First Project UM/CERN REU Summer 2007

First Project UM/CERN REU Summer 2007

Conclusion  Finish documentation of gas system information database  What next? Warning system for gas malfunction Data acquisition for the gas system