Central tracker design svt layout changed to accommodate micromegas CLAS-Note 2010-001 3 regions not 4 regions region 3 has 16 sectors not 18 sectors new.

Slides:



Advertisements
Similar presentations
26 June 2001VELO-Overview VELO Overview T. Bowcock University of Liverpool.
Advertisements

1 Service panels run from detector end to end of support tube X-section through service panels 3-D view of panels PP0 region. All services break here Patch.
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Magnet Measurement Device for MICE F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No July 2011 Oxford technical drawings by.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 27 May Sam Burke UCSB HEP Group.
The Little Room Project Maryfe Culiat Joseph Hernandez Jesse Kanda Mary Liang.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 23 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 17 June Sam Burke UCSB HEP Group.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
P07301 Summary Data Acquisition Module. Team Members.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
Tracker QA Test Station Status. 29/08/2015Imperial College 2 Updated QA Scan Definition Scan definition: 1 –One 300 mm scan  r to V (1) 25 –Two 75 mm.
Thomas Jefferson National Accelerator Facility Page 1 Silicon-based tracker system for EIC detector M.A. Antonioli, P. Bonneau, L. Elouadrhiri*, B. Eng,
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
CLAS12 CalCom Activity: a progress report V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 meeting, February 22 nd 2012.
1 November 18, 2014 DOE SC-OPA Review of 12 GeV ENC vs. preamp load FSSR2 by FNAL Single chip on a PCB Load from capacitors SVT module testing.
Thomas Jefferson National Accelerator Facility Page 1 Latifa Elouadrhiri Assistant Project Manager Hall B SVT Technical Review Jefferson Lab January 19-20,
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
Gerd J. Kunde - LANL1 The FVTX Technology  Outline Overall Picture Silicon Detector –Geometry, Layout, Process Readout Chip –FNAL Chips, New Chip PHX.
M.Oriunno, SLAC Stave cable and module options. M.Oriunno, SLAC Background - module The IBL electrical unit for data output is a single chip The use of.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Figure 12.1 The UP1-bot. Figure 12.2 Left: Radio Control Servo Motor and Right: Servo with Case and Gears Removed.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Thomas Jefferson National Accelerator Facility Page 1 SVT – Review January Sensors for the Silicon Vertex Tracker Amrit Yegneswaran.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Adrian Bevan Queen Mary, University of London SVT Mechanical Support and Strip Sensors.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Figure 12.1 The UP1-bot. Figure 12.2 Left: Radio Control Servo Motor and Right: Servo with Case and Gears Removed.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
1 SVT Status Update Yuri Gotra CLAS12 Silicon Vertex Tracker TCB Meeting March 13, 2015.
MTest Pixel Telescope – Status Update David Christian January 8, 2008.
FIRST RESULTS OF THE SILICON STRIP DETECTOR at STAR Jörg Reinnarth, Jonathan Bouchet, Lilian Martin, Jerome Baudot and the SSD teams in Nantes and Strasbourg.
Slide 1 UCSB CDMS Group Neutron Trigger. Slide 2 UCSB CDMS Group Neutron Trigger PROGRESS: à Electronics Fabrication Complete for SN1 à Simulation Work.
D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
CLAS12 Central Detector Meeting, Saclay, 3 Dec MVT Read-Out Architecture & MVT / SVT Integration Issues Irakli MANDJAVIDZE.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
Hall B Gas System Controls Physics Detector Support Group.
Date of download: 7/2/2016 Copyright © 2016 SPIE. All rights reserved. Structure of the EFPI sensor head. Figure Legend: From: Fiber temperature sensor.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Dave McComas on behalf of the ISʘIS Team
Mechanics: (Tim).
Work packages status in Torino and perspectives
ECE 477 Senior Design Group 7  Spring 2006
UNIZH and EPFL at LHCb.
EVLA MONITOR & CONTROL CDR
Electronics and DAQ for the GEM Detector
NEH - Status Stefan Moeller.
Manufacturing Processes
Perugia SuperB Workshop June 16-19, 2009
FED Design and EMU-to-DAQ Test
I have… I have… Who has 3:40? Who has 12:20? I have… I have…
Presentation transcript:

central tracker design svt layout changed to accommodate micromegas CLAS-Note regions not 4 regions region 3 has 16 sectors not 18 sectors new design with micromegas CLAS-Note testing leakage current test station developed CLAS-Note DAq for laser tests developed laser tests station is being developed at UNH by sarah phillips region 3 module test development at MSU michael merkin procurement sensor specification completed

micromegas + svt

support structure (mary ann)

hybrid flex circuit board (marc mcmullen) CLAS-Note

hybrid

wing cable

l1 interface card

support/cold plate (eng. grp)

l1 interface cards on support tube

Leakage current test result (peter bonneau) CLAS-Note

[V] versus [1/C 2 ] (pF) -2

laser test results (brian eng)

fabrication of pulser test board (mindy leffel)

summary in all areas: design, procurement, scheduling, testing slow and steady progress wins the