SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 2 Entergy ICT Transmission Planning Summit July 29, 2008 Astor Crown Plaza.

Slides:



Advertisements
Similar presentations
SPP.org 1. Draft Business as Usual Plan SPP.org 3 Wind - Business as Usual.
Advertisements

Proposed RISC 2014 Deliverables, Activities, and Calendar For Discussion Andy Rodriquez, Director of RRAC January 14, 2014.
Project Revisions to TOP Third Posting Webinar October 2014.
SPP.org 1. Economic Portfolio Update – CAWG Meeting – AEP Offices, Dallas August 27, 2008.
House Education Committee Summit November 11, 2014 Update on 2014 Legislation Regarding the A-F School Grading System Shelley Loving-Ryder Assistant Superintendent.
2009 Performance Assessment Member Representatives Committee Meeting October 28, 2008.
Route Transfer February 2004 TAC Meetings. History of Route Transfer Study.
ICT 2009 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2009 Astor Crown Plaza New Orleans, Louisiana.
ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.
ICT Strategic Transmission Plan (ISTEP) Review and Status Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana Douglas.
1 Entergy Texas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
1 Generator Interconnection Status Update Tom Lanigan Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
1 Entergy Transmission Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Project Real-time Monitoring and Analysis Capabilities Mark Olson, Senior Standards Developer Texas RE NSRS October 5, 2015.
ISTEP Phase II Final Report Summary LTTIWG Meeting – January 27, 2009 Douglas Bowman, PE Lead Engineer, ICT Planning
Community Outreach Meeting September 10, 2015 Welcome to Santa Clara County I-680 Corridor Study 1.
Base Plan Development Overview 2007 Transmission Summit July 31, 2007 New Orleans, Louisiana.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Transmission Planning Informational Workshop Montpelier, VT September 19, 2005 Allocating the Cost of New Transmission in New England Stephen J. Rourke.
SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,
SPP.org 1. Southeastern Inter-Regional Planning Update (SIRPP) Entergy Transmission Summit August 11, 2009 Astor Crown Plaza New Orleans, Louisiana.
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
SPP.org 1. ESRPP 2009 Regional Studies Initial Results ESRPP Stakeholder Meeting August 12, 2009 Astor Crown Plaza New Orleans, Louisiana.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
1 Entergy Transmission Planning Summit Transmission Planning Process Doug Powell New Orleans, LA July 8, 2004.
Project Tracking Update July 12, 2011 MOPC. 2 STEP List (Excel Spreadsheet) –Engineers enter technical data and analysis on upgrades –Used as a repository.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Let’s talk about the Illinois Waiver Proposal. FIRST What is a Waiver? and Why is it important?
SPP.org Transmission Expansion and Cost Allocations for FERC SPP-Entergy CBA 1.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Overview of Framework for Tools to Archive and Analyze Real Time Grid Data Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability.
ESI/SPP Seams Agreement Implementation Update Transmission Planning Summit August 11, 2010.
SPP.org 1. ICT Working Groups Current Activities Jody Holland Dowell Hudson Antoine Lucas Tim Phillips.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
ESI Alternate Economic Study Process E-RSC Meeting October 21, 2010.
1 Entergy Transmission Planning Summit Transmission Planning & Budget Process Doug Powell New Orleans, LA July 10, 2003.
APA CONTRACTS TO POST-2017 ALLOTTEES July 24 - Letter to all Allottees Inviting Comment August 10 - Allottee Response August 21 - Workshop August 28 –
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
1 Entergy Transmission Planning Summit New Orleans, LA July 10, 2003 Generation and Transmission Development in the Southeastern United States.
ISTEP Update Transmission Planning Summit August 11, 2009 Crown Plaza Hotel New Orleans, LA.
SPP.org 1. Regional and Inter-Regional Planning Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana.
2010 Draft Transmission Expansion Plan (Local Planning Projects)
SPP.org ICT Annual Stakeholder Survey January 20, 2010.
Generation Interconnection Overview 2007 Transmission Summit July 31, 2007 New Orleans, Louisiana.
Non-Assurance Services
ICT Welcome and Introductions Bruce Rew Executive Director, Contract Services Southwest Power Pool, Inc.
Status Update for Reliability/Market Power Mitigation Assessment
Entergy Integration Study Update
Generation Interconnection Summary
BICYCLE AND PEDESTRIAN MASTER PLAN FINAL PRESENTATION
Main Street Improvements
Transmission Service Requests Overview
(B.P :51) ( B:P52 ).
I-5 Corridor Reinforcement Project
Structure of the Code Don Thomson, Task Force Chair IESBA Meeting
Robotics June 1, 2005 Water March 30, 2005 Developing Countries November 30, 2004 ICT October 27, 2004 Service Industry [finance, telecom]
Proposed RISC 2014 Deliverables, Activities, and Calendar
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Acadiana Load Pocket Project
The Transformation of A Small Company Into A Golden Legend
European Winter Outlooks 2008/2009 and 2009/2010
February 2007 Note: Source:.
Strategic Plan and Economic Upgrade Process
Transmission Service Requests Overview
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
2015 January February March April May June July August September
Presentation transcript:

SPP.org 1

ICT Construction Plan Evaluation and Reliability Assessment Part 2 Entergy ICT Transmission Planning Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana

SPP.org 3 Project is not included in model Code for Base Plan and Construction Plan Projects Indicated on Maps BP = Project Number from 2008 Base Plan CP(2011) = 2008 Construction Plan and Expected In-Service Year DCP(2011) = 2009 Draft Construction Plan and In-Service Year Map Legend BP CP(2011) DCP(2011) Background Color Indicates Projects’ Inclusion In Case Project is in 2017 model

SPP.org 4

5

6

7 NA DCP(2013)

SPP.org 8

9

10

SPP.org 11

SPP.org 12

SPP.org 13

SPP.org 14

SPP.org 15

SPP.org 16

SPP.org 17

SPP.org 18

SPP.org 19

SPP.org 20 NA DCP(2013)

SPP.org 21

SPP.org 22 Other Areas These concerns seen in real-time may be relieved by projects in the Base Plan, Construction Plan or Draft Construction Plan. Hot Springs-Bismark 115kV FTLO El Dorado- Longwood 345kV (Base Plan Project) Liberty-Gillsberg 115kV FTLO Franklin-Bogalusa 500kV (Construction Plan Project with ISD 2009) Hartburg-Inland Orange 230kV FLTO Hartburg- Cypress 500kV (Draft Construction Plan Project with ISD 2010)

SPP.org 23 Base Plan Development Next Steps Stakeholder Comments Discuss Stakeholder Comments at September LTTIWG Present Draft Base Plan at October LTTIWG Finalize Base Plan and Post January 2009

SPP.org 24 Steve Purdy Lead Engineer, ICT Planning Jason Russell Engineer II, ICT Planning