ICT Construction Plan Evaluation and Reliability Assessment Part 2 Entergy ICT Transmission Planning Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana
SPP.org 3 Project is not included in model Code for Base Plan and Construction Plan Projects Indicated on Maps BP = Project Number from 2008 Base Plan CP(2011) = 2008 Construction Plan and Expected In-Service Year DCP(2011) = 2009 Draft Construction Plan and In-Service Year Map Legend BP CP(2011) DCP(2011) Background Color Indicates Projects’ Inclusion In Case Project is in 2017 model
SPP.org 4
5
6
7 NA DCP(2013)
SPP.org 8
9
10
SPP.org 11
SPP.org 12
SPP.org 13
SPP.org 14
SPP.org 15
SPP.org 16
SPP.org 17
SPP.org 18
SPP.org 19
SPP.org 20 NA DCP(2013)
SPP.org 21
SPP.org 22 Other Areas These concerns seen in real-time may be relieved by projects in the Base Plan, Construction Plan or Draft Construction Plan. Hot Springs-Bismark 115kV FTLO El Dorado- Longwood 345kV (Base Plan Project) Liberty-Gillsberg 115kV FTLO Franklin-Bogalusa 500kV (Construction Plan Project with ISD 2009) Hartburg-Inland Orange 230kV FLTO Hartburg- Cypress 500kV (Draft Construction Plan Project with ISD 2010)
SPP.org 23 Base Plan Development Next Steps Stakeholder Comments Discuss Stakeholder Comments at September LTTIWG Present Draft Base Plan at October LTTIWG Finalize Base Plan and Post January 2009
SPP.org 24 Steve Purdy Lead Engineer, ICT Planning Jason Russell Engineer II, ICT Planning