GLAST LAT ProjectMini-Review, 30 January 2003 LAT-PR-#####-## 1 I & T Responsibility LAT I&T, Verification, and Calibration Flow VibeRandom vibrate/sine.

Slides:



Advertisements
Similar presentations
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Advertisements

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectI&T/Online Workshop October 29 to November 1, 2002 R. Claus1 EM1 EGSE Configuration VME/cPCI Chassis LAT-COMM Electronics/OnlineSubsystem/simulator.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott.
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT Project Technical/Cost/Schedule Review 03/31/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
The CU Beam Test at CERN Status Report and highlights from workshop II Luca Latronico LAT C&A Meeting May
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 1 Gamma-ray Large Area Space.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST Large Area Telescope:
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 8 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 3 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom1 Elliott Bloom Integration and Test and Calibration Manager
GLAST LAT ProjectDOE/NASA Delta Baseline/Preliminary Design Review, July 30, 2002 Name Document: LAT-PR-#####-## 1 GLAST Large Area Telescope: I & T Elliott.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project IFC Tour – Sep 5,2003 Larry Wai 1 GLAST Large Area Telescope: Integration and Facility Status Larry Wai SU-SLAC Integration and Facility.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST Large Area Telescope:
I&T&C Organization Chart
Mechanical Integration
Peer Review Agenda (Suggested).
Electrical Ground Support Equipment Verification Test Support
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope Instrument Science Operations Center
Integration and Test Organization Chart
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
Integration and Test Organization Chart
Introduction and Overview
Integration & Test Instrument Operations Coordination
Overview of Beam Test Benoit, Ronaldo and Eduardo Nov 8 , 2005 thanks to Steve and Bill for helping to consolidate all the information.
Presentation transcript:

GLAST LAT ProjectMini-Review, 30 January 2003 LAT-PR-#####-## 1 I & T Responsibility LAT I&T, Verification, and Calibration Flow VibeRandom vibrate/sine sweepAccAcceptance test level AcAcousticQUQualification Unit T-CThermal-cycle at 1 atmosphereEMEngineering Model T-VThermal-vacuum cycle testTMThermal model EMIElectro-magnetic interference testCUCalibration Unit FUFlight Unit Calibration unit I&TCalCalibration Flight unit/spares I&TFS Flight Spare I&T: Beam test CU – 4 towers Cal Elec: EM2 Elect. Modules, SIS TKR: QU FS from TKR fab CAL: F1-2 from CAL fab CAL: QU- FS from CAL fab TKR: F1-2 from TKR fab Calibration Unit - CU Obs: Support Vibe/Ac Acc Obs: Support T-V Acc Obs: Support EMI Acc I&T: LAT Assembly, Test Acc, Cal Elec: Flt Elec. Mod. to LAT I&T CAL: F3-16 from CAL fab TKR: F3-16 from TKR fab Mech: Flt Grid from Mech ACD: ACD to LAT I&T Flight LAT - FU I&T: LAT Functional, Thermal, Airborne cosmic E to E Acc, Cal, T-C TKR/CAL: F1,2 from CU I&T: LAT Environmental Tests Acc, Cal, T-V Elec: SIU Mech: Flt Rad’s from Mech

GLAST LAT ProjectMini-Review, 30 January 2003 LAT-PR-#####-## 2 Require ment TitleParameterVerification Method Particle Tests Relevant to Verifying the Requirement Energy-Range/ Effective Area > 300 cm 20 MeV >3000 cm 100 MeV >6400 cm 300 GeV Test + MC, Analysis. Van de Graaff 17.6 MeV photons  Tagged photons 20 to 1500 MeV, norm incidence. Brem beam, simultaneously all  energy bins from 20 MeV to 28 variety of angles and positions Photon Energy Resolution (normal incidence)  50 % 20–100 MeV  10 % 1-10 GeV  20% GeV Test + MC, Analysis. Van de Graaff 17.6 MeV photons  Tagged photons 20 to 1500 MeV, norm incidence. Positrons 1, 2, 5, 10, 28, 45 variety of angles and positions Peak Effective Area>8000 cm 2 Test + MC, Analysis. Brems beam, simultaneously all  energy bins from <20 MeV to 28 variety of angles and positions Single Photon Angular Resolution – 68% (on- axis) 100 MeV < 3.5° front, < 6° back GeV < 0.15° front, < 0.3° back Test + MC, Analysis. Brems beam, simultaneously all  energy bins from <20 MeV to 28 variety of angles and positions. Tagged photons 20 to 1500 MeV, norm incidence. LAT Science Requirements Verification Matrix (Examples) Requirements for Beam Tests flow down from LAT Science Req. Doc – Level II Specification LAT-SS-00010

GLAST LAT ProjectMini-Review, 30 January 2003 LAT-PR-#####-## 3 EM Deliverables to I&T ACD – none TKR - one full size mechanical module and a four-tray module fully instrumented with cables and electronic readout (mini-tower), TKR lift fixture, preliminary functional test scripts CAL – fully instrumented module, preliminary functional test scripts ELX/I&T - EGSE – EM1 version ME/I&T - 1 x 4 support grid SAS/I&T - GLEAM Monte Carlo, calibration algorithms

GLAST LAT ProjectMini-Review, 30 January 2003 LAT-PR-#####-## 4 TestPurposeDatesObservers/Users CAL alignment TEST MGSE Prototype CAL Mockup November 14, 2002I&T CAL EGSE integration Test Integrated EGSE SystemDecember 2002I&T ELX TKR readout Test TKR-TEM integration EGSE test code validation January, 2003I&T TKR TKR alignment TEST MGSE Prototype TKR Mechanical EM April 2003I&T TKR CAL integration Test CAL-TEM integration EGSE test code validation April 2003I&T CAL TKR-CAL integration Test System integration EGSE test code validation May 2003I&T System Engineering Calibration and data analysis Muon Calibration/Survey Van de Graaff calibration test (methods and procedures) May 2003I&T SAS EM Planned Tests

GLAST LAT ProjectMini-Review, 30 January 2003 LAT-PR-#####-## 5 EM GSE Schedule GSE ItemPurposeDate Available Cal alignment toolCal alignment testOctober 2002 (Done) Cal external features modelCal alignment testOctober 2002 (Done) Grid Bay modelCal alignment testOctober 2002 (Done) Cal Lift/Alignment SlingCal alignment testOctober 2002 (Done) EM Grid Rotation StandEM Assembly Support FixtureJanuary 2003 Tracker Lift Fixture (from TKR) Tracker alignment testApril 2003 EM1 Electronics (from ELX)Readout of EM dataDecember 2002 Van de GraaffProduce low energy photonsJanuary 2003 scintillatorsVeto charged particlesJanuary 2003 Cal Lift SlingLift Cal out of shipping containerApril 2003 Cal RotatorRotate Cal upside-downJanuary 2003

GLAST LAT ProjectMini-Review, 30 January 2003 LAT-PR-#####-## 6 SVAC’s Plans for the EM Requirements (LAT-MD – SVAC Plan) –Test low-level calibration algorithms for CAL and TKR with an integrated tower, –Test and refine the SVAC database design necessary for the CU activities, –Test and refine quality check histograms necessary to validate MC simulations, –Test the geometry implementation in the SAS reconstruction software that will be used for the CU activities Additional Goals (LAT-SS – SVAC EM Plan) –GLEAM MC Compare raw distributions –Prototype data analysis algorithms Energy Resolution for 17.6 MeV 

GLAST LAT ProjectMini-Review, 30 January 2003 LAT-PR-#####-## 7 LAT I&T MGSE Q4 Progress Completed Design, Fabrication and Inspection of Calorimeter “Installation from above” concept hardware –Performed dry run of alignment installation demonstration No Problems –See photos on next charts Generated some new concepts for MGSE intended for flight integration –Too preliminary to discuss Near term focus, after completion of Cal Installation Demo, will be EM Hdwr; No issues foreseen –EM-Calorimeter Rotation / Support Stand (Design 40% Complete) –1 x 4 Grid Support –1 x 4 Grid Lift Fixture –Possible need for an EM Shipping Container (very low cost) –Van de Graaff Support Stand (Design 70% Complete)

GLAST LAT ProjectMini-Review, 30 January 2003 LAT-PR-#####-## 8 Online Migration EM-1: No FSW beyond hardware drivers –Will be used for the EM test (Functional testing, Calibration - cosmic rays, Van de Graaff photons) EM-2: Development platform for multi-tower support –Embedded systems run FSW code –Commanding will be done through a more realistic dictionary –Event format changes from TEM/AEM output style –Test bench scripts will still be able to be run CU: Four tower system used for the Beam Test at SLAC –No ACD subsystem software planned. –Evolution of EM-2 –Will need to handle external sources of data –1553, SSR and SIS communications not required to satisfy test –Test bench scripts will still be able to be run FU/LAT: The complete system –Communications only through SIS, 1553 and SSR –Will need IOC/MOC-like interface –Test bench scripts will not be able to be run

GLAST LAT ProjectMini-Review, 30 January 2003 LAT-PR-#####-## 9 Integration Facility Schedule/Status Building 33: –Cleanroom AC upgrades and ESD tile repairs completed, accepted –All monitoring equipment received by Nov.25 –Commission monitoring equipment by Dec.10 –Fire protection upgrade (dry pipe) complete Dec. 20 –Final lock-down w/ omni locks, start cleanroom procedures by January 15.

GLAST LAT ProjectMini-Review, 30 January 2003 LAT-PR-#####-## 10 I&T Top Issues and Risks EM – Delivery of subsystem parts and scripts. –Impact: Less progress before CDR. –Mitigation: I&T will do what we can before CDR and continue work afterward. –Status: Preparing for a very tight schedule. Final LAT test requirements. –Impacting I&T test plan development and MGSE development. –Plan for more inclusive set of tests. –Working to develop test plans to the extent possible at this time. EGSE Executive trade-online. –Potential ITAR issues. Risk of impacting budget and schedule. –Develop in-house, open source, non ITAR restricted, EGSE. –Proceeding with in-house, open source, non ITAR restricted, EM-1 EGSE.