Philippe Gayet Engineering Department OPERATION AND MAINTENANCE INTEGRATED A STEP FURTHER? Philippe GAYET EN-ICE, CERN Asset and Maintenance Management.

Slides:



Advertisements
Similar presentations
Presented by Nikita Shah 5th IT ( )
Advertisements

CWG10 Control, Configuration and Monitoring Status and plans for Control, Configuration and Monitoring 16 December 2014 ALICE O 2 Asian Workshop
Intervention Priority Management This talk will show the CERN priority list, the corresponding check list and the tools used by operators to diagnose a.
TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
Predictive Maintenance: Condition monitoring Tools and Systems for asset management September 19, 2007.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
The Premier Software Usage Analysis and Reporting Toolset Maximizing Value for Software Users.
OPC Alarm.NET.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Thomas Baron CERN Infor EAM User Meeting 26 June 2013.
1 Action Automated Security Breach Reporting and Corrections.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
Module 16: Software Maintenance Using Windows Server Update Services.
Industrial Control Engineering UNICOS-PVSS evolution Hervé Milcent EN/ICE/SCD 07/10/
Accelerating Product and Service Innovation © 2013 IBM Corporation IBM Integrated Solution for System z Development (ISDz) Henk van der Wijk 23 Januari.
© 2009 IBM Corporation Delivering Quality Service with IBM Service Management April 13 th, 2009.
Suzanne Gysin1 Software for the LHC Types of Software Current Prototyping Architecture Ideas Requirements Revisited WBS considerations.
CERN - IT Department CH-1211 Genève 23 Switzerland t Monitoring the ATLAS Distributed Data Management System Ricardo Rocha (CERN) on behalf.
Openlab Workshop on Data Analytics 16 th of November 2012 Axel Voitier – CERN EN-ICE.
SCADA Systems - What is the scope of this talk? What are SCADA systems? What are their structure and main features? How open are they? How are they evolving?
An automated diagnostic system to streamline DSM project maintenance Johan du Plessis 15 August 2012.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
Module 10: Monitoring ISA Server Overview Monitoring Overview Configuring Alerts Configuring Session Monitoring Configuring Logging Configuring.
CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.
Event Management & ITIL V3
WebVizOr: A Fault Detection Visualization Tool for Web Applications Goal: Illustrate and evaluate the uses of WebVizOr, a new tool to aid web application.
Control System Data Analysis Future Vision Author: Axel Voitier CERN EN-ICE.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
ENABLING companies to DEPLOY wireless data solutions Application Development Tools Remote Deployment and Management LAN/WAN environments.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
NetNumen T31 Common Operations. Objectives Master Basic Configurations of T31 Master Common Operations of T31.
Exchange Deployment Planning Services Exchange 2010 Complementary Products.
1 UNICOS PVSS Evolution Cryogenics Control Enrique BLANCO Industrial Controls & Electronics Group.
The DIAMON Project Monitoring and Diagnostics for the CERN Controls Infrastructure Pierre Charrue, Mark Buttner, Joel Lauener, Katarina Sigerud, Maciej.
Tbox is a monitoring solution for all your computer systems Unifies and simplifies management of system surveillance Notifies you in the event of.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
Firmware - 1 CMS Upgrade Workshop October SLHC CMS Firmware SLHC CMS Firmware Organization, Validation, and Commissioning M. Schulte, University.
CERN openlab technical workshop
CERN General Infrastructure Services Department CERN GS Department CH-1211 Geneva 23 Switzerland Db Futures Workshop
Security Snapshot Assessment Maximizing Return on Security Investment What assets do we have? What is running on those assets? What is our risk level?
The Software for the CERN Detector Safety System G. Morpurgo, R. B. Flockhart and S. Lüders, CERN IT/CO.
Network management Network management refers to the activities, methods, procedures, and tools that pertain to the operation, administration, maintenance,
Maintenance Management Project EN Dept. Implementation Project Mario Batz EN-CV Maintenance Management Workshop 25 th November 2011 EDMS EDMS
K.POMMÈS (CERN), B. LANGE (RIO), V. PAVANI NETO(RIO),B. VIEIRA AROSA (RIO) ATLAS Glance Since this week our offices are moved to building 3150.
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
TS workshop 2004U. Epting, M.C. Morodo Testa - TS department1 Improving Industrial Process Control Systems Security Uwe Epting (TS/CSE) Maria Carmen Morodo.
A way to develop software that emphasizes communication, collaboration, and integration between development and IT operations teams.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
Claudia Dias Vacuum, Surfaces & Coatings Group Technology Department Claudia Dias CERN, Technology Department Vacuum, Surfaces and Coatings Group 2 |
Industrial Control Engineering ADE Rapid Application Development Environment.
TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen1 TCR Remote Monitoring.
Data Analytics for Control Systems DAQ Data Analytics Workshop 14 April 2016 JCOP data analytics workshop 1 Axel Voitier Filippo Tilaro Manuel Gonzalez.
Maintaining and Updating Windows Server 2008 Lesson 8.
Wednesday NI Vision Sessions
CERN openlab Machine Learning and Data Analytics workshop
Lecture 11. Switch Hardware Nowadays switches are very high performance computers with high hardware specifications Switches usually consist of a chassis.
SCADA & Monitoring Developments for Vacuum
FCT and CERN Portuguese Trainee Programme Report
Performance monitoring framework for the technical infrastructure
Reliability Analysis & Infor EAM
Presented by Jon Pastuszynski, Lead M&D Engineer
CV PVSS project architecture
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
Software Developer for Vacuum Control System (BE3528)
Case management as logbook for the cryogenic installations at CERN
Measurement 2 Measurement 3 Condition Monitoring Integration with Embedded Software and On Key Hardware’s embedded software/analysis tool and specialist.
Mark Quirk Head of Technology Developer & Platform Group
Future of AIOps –GAVS View
Presentation transcript:

Philippe Gayet Engineering Department OPERATION AND MAINTENANCE INTEGRATED A STEP FURTHER? Philippe GAYET EN-ICE, CERN Asset and Maintenance Management Workshop November 2013

Philippe Gayet Engineering Department OPERATION/MAINTENANCE COORDINATION Part 1

Philippe Gayet Engineering Department Operation Maintenance Acc. Equ. Experts Acc. Equ. Stanby Acc. Equ. Experts Acc. Equ. Stanby Acc. Equ. Experts Acc. Equ. Stanby Acc. Equ. Experts Acc. Equ. Stanby Acc. Equ. Experts Acc. Equ. Stanby Acc. Equ. Experts Acc. Equ. Stanby Infrast. Equ. Stanby Ext. Support Team Infrast. Equ. Experts Infrast. Equ. Stanby Ext. Support Team Infrast. Equ. Experts Infrast. Operation Team Cryo Operation Team Acc. Operation Team Infrast. Equ. Standby Ext. Support Team Infrast. Equ. Experts Cryo. Equ. Experts Ext. Support Team Ext. Support Team Equ. Group Experts CCC Operation Team Equ. group Standby CERN Accelerator Operation Organization Industrial Control systems

Philippe Gayet Engineering Department Operation-Maintenance Ecosystem 4 TN GPN WTS OWS Enterprise computers Local Panel EWS Fieldbus Application Servers PLCs/FEC WTS Home/Remote computers NAMING ASSETFONCTION

Philippe Gayet Engineering Department How to Integrate Operation and Maintenance Control system Configuration Common Integrated Control Framework Integration Tools

Philippe Gayet Engineering Department Integrated Operation and Maintenance  Maintenance information available from Operation Tools SCADA Synoptics Device Faceplace Infor-EAM WEB API 1.Select Device 2.Obtain operational information 3.Link to documentation (edms) or maintenance (Infor)

Philippe Gayet Engineering Department Integrated Operation and Maintenance  Prefilled work Order Generation

Philippe Gayet Engineering Department Integrated Operation and Maintenance  Prefilled work Order Generation SCADA 1.Identify Alarm 2.Link to Help Alarm 3.Create ODM 4.Feedback throught Infor Infor-EAM WEB API Alarm list Help Alarm

Philippe Gayet Engineering Department Integrated Operation and Maintenance  Enriched information to Maintenance team SCADA Log files Trends 1.Produce information files (.csv) 2.Import in maintenance tools

Philippe Gayet Engineering Department Integrated Operation and Maintenance  Alarm Inhibition in maintenance period Modesti (CCC Alarm Configuration) SCADA CCC Alarm Console LASER Additionnal ALARM features for masking and inhibition are under Study/Development

Philippe Gayet Engineering Department ENABLE PREDICTIVE MAINTENANCE Part 2

Philippe Gayet Engineering Department Maintenance Jacob’s Ladder corrective Impact LS1 MMP MF3 Integration With operation tools

Philippe Gayet Engineering Department Statistics analysis -Counters -Statistics -Running hours -Event Pattern -Counters -Statistics -Running hours -Event Pattern Online Data Processing Common threshold configuration Periodic automated transmission

Philippe Gayet Engineering Department Classical conditional maintenance Limited number of monitored parameters Important local workload Cross parameter analysis offline Regular Inspections Default Detection Alarm Threshold Time Critical Parameter Breakdown Limit Risk Status Frequent Inspections Intervention Planning MTTR Repaired

Philippe Gayet Engineering Department Automated conditional maintenance Large number of monitored parameters Early default detection Reduced local workload Common Configuration Alarm Threshold Time Critical Parameter Breakdown Limit Risk Status MTTR Repaired Permanent Monitoring Automatic Default Detection Intervention Planning CV Vibration

Philippe Gayet Engineering Department Multifactorial analysis Time Critical Parameter Risk Status Secondary Parameter Complex default prediction analysis Maximize availability (reduction of false positive alarm) But Imply close collaboration between expert and control Will need the use of new tchnology for larger deployment -Cryo sector valve default

Philippe Gayet Engineering Department CONCLUSION Epilogue

Philippe Gayet Engineering Department Integration of operation and maintenance tools is needed The standardisation of the tools on both sides will save lot of integration efforts is the only way to achieve it. We do have the basic building block and several use cases mockups We need collaboration and willingness of all partners to achieve this integration Today practices will have to be modified but the results worth the effort.