13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

Multi-Turn Extraction / L.Ducimetière / Kicker options for MTE Prepared by L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated.
Operational aspects 2008 run ISCOOL Isolde workshop Nov 2008 Erwin Siesling.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
AD status in 2012, foreseen consolidations at AD ADUC 20/11/2012T. Eriksson CERN BE/OP.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Antiproton source startup report Bill Ashmanskas Prevault sump water rerouted to Main Ring OTR installation in AP1. (Another OTR will go into.
IEFC 22 March 2011T. Eriksson CERN BE/OP How to ensure a bright future of the AD.
J. Borburgh, B. Balhan, E. Carlier, S. Damjanovic, L. Ducimetiere, T. Masson, V. Mertens, A. Prost, L. Sermeus.
Major power converter issues for the restart of PS & SPS machines and their experimental areas in 2006 Jean-Paul BURNET for AB/PO PS&SPS days January.
Status of the AD ADUC 13/6/2012T. Eriksson CERN BE/OP.
ATC / ABOC Days 23 Jan LHC injector Chain, E.A., Facilities. MTTR, spare parts and stand-by policy for BI equipments J.Tan AB/BI on behalf of BI.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Status and Prospects for the AD and ELENA
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
AD start-up 2014 A rough and brief summary MSWG 16/01/2015T.Eriksson BE/OP1.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
ATC/ABOC 2007T. Eriksson CERN AB/OP AD Machine and Experimental Areas – Operation and major problems in 2006, outlook for 2007.
ELENA EXTRACTION LINES W. Bartmann, D. Barna, M. Fraser, J. Jentzsch, R. Ostojic ELENA Commissioning discussion, 23th November, 2015.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
Antiproton Decelerator (AD) Consolidation ADUC 13/1/2015T. Eriksson CERN BE/OP1.
ELENA: Commissioning & operation ELENA beam commissioning Operation 12/11/2015T.Eriksson CERN BE/OP/AD1.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 1 AD and AD experimental areas: equipment tests and startup with beam Tommy.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
Villars, 26 September Extra Low Energy Antiproton Ring (ELENA) for antiproton deceleration after the AD Pavel Belochitskii for the AD team On behalf.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
T.Eriksson P.Belochitskii G.Tranquille CERN, BE department, 1211 Geneva 9 September 2011T. Eriksson CERN BE/OP.
Low Energy Antiproton Facility at CERN Christian Carli on behalf of the AD and ELENA team …. with special thanks to P.Beloshitskii, T.Eriksson and S. Maury.
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
Slide 1 Overview Introduction Stochastic Cooling History of the Antiproton machines at CERN The AD and ELENA Conclusion.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
What’s Falling Apart in the Injector Chain ? PS/SPS Days January 2005.
Steering committee ELENA Project Structure S. Maury, project leader C. Carli, deputy project leader Beam physics and Performance Committee (G. Tranquille,
Report Technical Director Storage-Ring-Installation Completed
Vacuum System P. Chiggiato TE-VSC
Preparation Phase of the FAIR Project
ESR Slow highly charged ions and antiprotons
Oleksiy Dolinskyy December 1st, 2014
Status of HESR 18th March Gießen Dieter Prasuhn.
ELENA installation and commissioning status
Installations up to Start of Commissioning
AD consolidation activities in LS2
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
ELENA Extra Low ENergy Antiproton Ring
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Electron Cooling in ELENA - observations and plans
Plans for future electron cooling needs PS BD/AC
Presentation transcript:

13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD

13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 2 How can we restart AD in 2006 ? Contents 1.How could AD be run in 2006? 2.Consolidation needed for a successful restart 3.Improvements 4.ccc issues

13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 3 How could AD be run in 2006? The SPSC at Villars strongly supports continued operation of the AD…… “Crystal ball exercise”: Short AD run May-August, 1800 total runtime (3400 in 2004) OP/AD-LEIR section will run either AD or LEIR, including LEIR commissioning 2005/2006 AD: ops crew = 5 specialists on-call Mon 07:00 – Fri 23:00 24h/24. Shiftwork on AD only during startups and md:s.

13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 4 Consolidation needed for a successful restart in 2006 AD is based on ACOL, built in 1986 Running for physics since 1999 Uptime has been around 85-90%, except for 2004 when it went down to 71% We are looking at years of continued operation Plans for a future Pbar facility at GSI exist, to be operational after 2013

13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 5 Consolidation - electron cooling

13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 6 Consolidation - electron cooling Replacement of NEG:s, add “missing” NEG Repair of orbit pickup New V coils+supplies on DHV2904 and 2917, study underway Replacement of cathode Alignment New interlock system (standardisation)

13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 7 Consolidation – stochastic cooling

13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 8 Consolidation - stochastic cooling Amplifier maintenance, asssuming present failure rate Programmable delays/attenuators controls: eliminate CAMAC, new interface, supplies etc. Instrumentation P/U+kicker movement outdated, but redundant equipment can be used. Document + cleanup PFF

13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 9 Consolidation – vacuum system Open sect. 3+4: –Electron cooler work –Remove kicker tank in sect. 35, replace w. tube –Install non-magnetic support VVS3105 –Replace BIPM4208 MCP –Bakeout required Isolate AD from TTL2 (close 8000-line) Improve DEM.STP18 Cryogenics compressors Pumping groups, VGI:s Ion pump supplies upgrade. (part of on-going PS-wide standardisation)

13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 10 Consolidation – vacuum system

13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 11 Consolidation – experimental zone Install new H+V corrector and in DE0 beneath ATRAP2 (main solenoid stray field compensation)

13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 12 Consolidation – kickers K35 tank will be taken out – no longer in use, reduce leak risk during bakeouts, source for spare parts K55/56 tanks not suitable for bakeout, leaks have occurred (Decision to be taken) Electronics – covered under general consolidation program

13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 13 Consolidation – power converters Pulsed capacitor discharge supplies (injection line + septas). Replacement of all capacitors + some electronics/switches For extended AD run period, new supplies could be considered

13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 14 Consolidation – RF C02: spare situation generally ok, but some new spares needed (gap capacitors, tuning current transistor banks) C10 (minimum): 2 Final tubes C10 (for extended AD run period): Modernisation of several supplies/drivers Beam control: Startup as-is (upgrade in 2007/8 to DSP-based standard system) Instrumentation

13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 15 Consolidation – Target area Spare situation ok except for BHZ6024/6025, no spare and the manufacturer does not exist any more…… Horn pulser: PLC-based controls Horn pulser ignitron upgrade (safety issue): Replace mercury switches by thyristors (under consideration)

13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 16 Consolidation – Instrumentation New electrostatic pickups for ejection lines (non-destructive beamline tuning) New type MWPC:s + improved ctrls MTV:s, new cameras/hw

13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 17 Consolidation – Infrastructure Water distribution 7000-line Water cooling installation recently overhauled No main worries for B.193

13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 18 Improvements The SPSC recommends the implementation of a faster switching between the AD experiments Needs more stable machine….. New corrector dipoles for e-/pbar trajectory alignment in ecooler: reduction of realignments Ejection ppm looks possible (requested by some AD users) – studies will be made in 2005/6 Use of electrostatic pickups in the ejection lines would greatly speed-up beamline tuning

13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 19 Improvements At Villars the SPSC has also supported the implementation of the ELENA decelerator ring Further deceleration from 5.3 MeV to 100keV will increase pbar trapping efficiency New electrostatic beamlines Cost study needs to be done

13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 20 Improvements Increase beam intensity: Stacking in AD, proof of principle made, needs work in PS/RF + AD hall radiation considerations 5-bunch production beam instead of 4, need 3.6 s PS cycle with injection twice from PSB

13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 21 CCC issues Running AD from ccc reinforces the need for: Improved machine stability = Need improved correction of ecool trajectories Better tools for ejection beamline tuning = Need pickups for fast, non-destructive corrections