A review after 5 years. Cease dependence on inspection to achieve quality... by building it into the product in the first instance.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

A Joint Code of Practice Objectives and Summary Presentation
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
ARMENIA: Quality Assurance (QA) and National Qualifications Framework (NQF) Tbilisi Regional Seminar on Quality Management in the Context of National.
Chapter 2 Analyzing the Business Case.
Project Flow Chart. 2 Project Initiation 2 reasons for starting a project: –the client has a problem –the client cannot take advantage of an opportunity.
A regulatory framework for gas quality treatment facilities: recap and update.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
9.401 Auditing Chapter 1 Introduction. Definition of Auditing The accumulation and evaluation The accumulation and evaluation Of evidence about information.
I ntroduction Finally… A Best Practice for Selecting Engineers From Vision to Reality Engineering Canada’s Future.
Presented by Katarina NEUSCHLOVA
A PROCUREMENT ASSESSMENT MODEL Joel Turkewitz World Bank April 2003.
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
Financing Urban Public Infrastructure
> taking best practice to the world International Experience with Performance Based Maintenance Contracts.
SYSTEM ANALYSIS AND DESIGN
PlatinumAgri Pty. Ltd. Consulting Services Overview.
Manage Project Procurement Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG509A.
Policy and Procedure Inspector Christian Ellis. Policy Statement About Policy It is best practice to have up to date, clear and standardised policies.
Quick Guide to help your transition
June 20, 2012 Outsourcing Physical Plant Should I ???
CO2403 and CO3808 – Quality Management Systems Quality process definition, administration and accreditation.
ROAD PAVEMENT FORUM RECENT EXPERIENCES ON PPGS PROJECTS HISTORY 1993 RPF (BMLC) PPGS Task Group Formed 1994CAPSA Resolution to promote concept 1996Initial.
Project Management Project Planning HR, Procurement, Quality, Communications
2  Mission Statement.  Company’s overall purpose and direction, products, services and values.  Goals.  That accomplish the mission. E.g. 5 year plan.
Project Life Cycle – Project Initiation © Ed Green Penn State University All Rights Reserved.
Quality Based Selection The Best Practice for Selecting Professional Consultants [DATE]
Systems Analysis and Design
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
BSBPMG505A Manage Project Quality Manage Project Quality Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG505A.
RPF Laboratory Accreditation/Verification Task Group RPF meeting 13/14 November 2002.
IS/ICT Management in the Modern Enterprise Ota Novotný University of Economics, Prague dept. of Information Technologies.
PPGS N3/1: Durban - Pinetown. PPGS N2/25,26 DURBAN OUTER RING ROAD.
BSBPMG507A Manage Project Communications Manage Project Communications Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit.
Revised AQTF Standards for Registered Training Organisations Strengthening our commitment to quality - COAG February August 2006.
MARCH 1 Risk Management Introduction l Generic approach è Type of project è The length of the project è Experience of the risk manager è The attitude of.
Rijkswaterstaat 1 Market approach. Rijkswaterstaat 2 Contents history types of functional contracts in the Netherlands –performance contracts –engineering.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 Click to edit Master title style What is Business Analysis Body of Knowledge?
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
Swedish Risk Management System Internal management and control Aiming to Transport Administration with reasonable certainty to.
Outlines Overview Defining the Vision Through Business Requirements
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision  Quality Management  Jos Kuijper, Manager.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Bridge Maintenance and Inspection Responsibilities Technical.
1 SHE Requirements Presented by : Diane Maunatlala SS: COHS.
What makes for good standards in Apprenticeships? Jeremy Benson – Executive Director for Vocational Qualifications Bryan Horne - Associate Director, Standards.
Lecturer: Lina Vladimirovna Zhornyak, Associate Professor.
Contract management 1. Acquiring software from external supplier This could be: a bespoke system - created specially for the customer off-the-shelf -
Improving Compliance with ISAs Presenters: Al Johnson & Pat Hayle.
Rob Connatser NSS Instrument Work Packages and XLPM.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
Federal Public Service Economy, SMEs, Self-employed and Energy Pieter Van Vaerenbergh DG Enforcement and Mediation Belgium Enforcement Regulation 2006/2004.
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
Abcd FSA’s approach to Prudential Regulation - general insurance proposals Peter Hinton Insurance Technical Risk Financial Services Authority May.
Roland Gilbert BSc MRICS; Prince 2 Practitioner
Module 4 Green Materials Procurement: Finding what you need and getting what you asked for.
ISO/IEC
BRIDGE MAINTENANCE & INSPECTION RESPONSIBILITIES
Manage Project Quality Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG505A.
Temporary Works Co-ordination
Small Internal Audit Activity Challenges
Project proposal for ISO 27001:2013 implementation
Technical Report Writing
Developing & implementing business strategy
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
BRIDGE MAINTENANCE & INSPECTION RESPONSIBILITIES
ACCREDITATION PROCESS
BRIDGE MAINTENANCE & INSPECTION RESPONSIBILITIES
Introduction to Projects
Presentation transcript:

A review after 5 years

Cease dependence on inspection to achieve quality... by building it into the product in the first instance

BMLC task group on PPGS convened in November 1993 Investigate the need for and the feasibility of a new type of QMS A system proposed: –Formal management of performance warranties –Acceptance criteria based on performance (rather than compliance with requirements) –One that supports innovation and formal quality management systems

Discussed at BMLC in May 1994 CAPSA ’94 Agreed that the development of PPGS and its implementation should proceed A framework document was published in November 1994 – basis for further development

Concerns for road user New protocol for risk sharing Opportunities for innovation

Performance specification Performance based specification Performance related specification Ascending order

Full systemProduct Spec Level of performance guarantees Cost of supervision

Quality framework -general outline Quality system -organisational regulations and procedures Quality plan -specific quality practices, resources...

7 national roads projects 2 provincial roads projects 7 mainly remedial measures to black- top pavements 2 Sealing and repairs on pcc pavements

Contractors cannot be expected to warrant a product for reasons outside of their control Clients cannot be prescriptive and expect a warranty based on these prescriptions

Performance warranties improve quality Improved performance = improved quality at reduced cost The “desired result” is customer oriented Improved performance involves client consultant and contractor

Product certification yields higher confidence levels than process certification Realistic warranty periods - 5 years Increase in tender prices offset by savings in engineering

Are performance models competent to determine acceptable risk profiles? Is there enough scope for contractor decisions Are inputs (e.g. traffic) sufficiently well defined (and controlled)?