Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, 2004 1 EVLA Monitor and Control Monitor & Control Transition.

Slides:



Advertisements
Similar presentations
14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan.
Advertisements

Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Author George Peck EVLA Hardware Monitor and Control PDR March 13, APPLICATIONS AND DEVICE INTERFACE ISSUES.
MONITOR AND CONTROL EXECUTOR REAL TIME PROGRAM.
Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview.
The Prototype Correlator Sonja Vrcic Socorro, 5. December, 2006.
James Robnett EVLA M&C Hardware PDR March EVLA Monitor and Control M&C Network.
Author Bob Broilo EVLA Hardware Monitor & Control PDR March 13, ANTENNA SERVO AND SUBREFLECTOR CONTROLLER.
Author Wayne M. Koski EVLA Monitor & Control Software PDR May 14 & 15, EVLA Monitor and Control Module Interface Board (MIB) Design.
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
5-6 Dec, 2006EVLA M&C Critical Design ReviewRich Moeser 1 User Interfaces Rich Moeser.
October 28, 2002 International Loran Association Modernization of Nii Jima Transmitter Control Presented by Michael Weisenbloom.
Author George Peck EVLA System PDR December 4-5, EVLA Monitor and Control Hardware.
Hichem Ben Frej 5-Dec-2006 EVLA M&C Transition Software CDR CMP: Control Monitor Processor 1 Hichem Ben Frej Kevin Ryan.
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
James Robnett EVLA M&C Hardware PDR March EVLA M&C Hardware PDR Voice Communications.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
Wayne M. KoskiEVLA Front-End CDR – EVLA Receiver Monitor & Control April 24, EVLA Front-End CDR EVLA Receiver Monitor & Control F317 and F320 Modules.
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, EVLA Monitor and Control Module Interface Board (MIB) Design.
Author George Peck EVLA Hardware Monitor & Control PDR March 13, EVLA MONITOR AND CONTROL HARDWARE REQUIREMENTS.
James Robnett EVLA M&C Hardware CDR October 20, EVLA Monitor and Control M&C Network.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April EVLA Front-End CDR EVLA Front-End Schedule.
R MoeserCorrelator f2f Meeting1 MCAF (Metadata Capture and Formatting) Rich Moeser.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
14 June, 2004 EVLA Overall Design Subsystems II Tom Morgan 1 EVLA Overall Software Design Final Internal Review Subsystems II by Tom Morgan.
Introduction to EVLA Software Bryan Butler. 2006Dec05/06EVLA M&C Transition Software CDR2 EVLA Computing (Terse) History The original EVLA Phase I proposal.
Author George Peck EVLA Hardware Monitor & Control PDR March 13, MIB FUNCTIONALITY.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
October, 2009 Controls System Kevin Brown/Brian Oerter October, 2009 Internal Review.
Interim Data Capture & Format (IDCAF) Walter Brisken 2006 Dec 6.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
EVLA Monitor & Control Software PDR Status. May 15, 2002EVLA Monitor & Control Software PDR Bill Sahr 2 Requirements, Schedule Requirements (High Level,
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Slot – ID.
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
Bill SahrNSF Review May , EVLA Monitor & Control.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Overall Data Processing Architecture EVLA timeline and priorities.
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, EVLA Monitor and Control Monitor & Control Transition.
EVLA M&C CDR EVLA Monitor Data Archive System John Benson, Chunai Cai NRAO Dec 6, 2006.
Future LBO Developments
Redundancy Switching Components
Monitor and Control Software
EVLA Advisory Committee Meeting System Status
EVLA NSF Mid-Project Review System / Antenna Status
EVLA NSF Mid-Project Review System / Antenna Status
PTC Setup at VLA B. Carlson
Budget, Schedule, Contingency
EVLA M/C Software PDR, 14 May 2002
EVLA Receivers PDR Transition Planning Author Daniel (Mert) Mertely
EVLA MONITOR & CONTROL CDR
EVLA MONITOR & CONTROL CDR
Bryan Butler (for Bill Sahr)
EVLA Advisory Committee Meeting System Status
PDR Guidelines The purpose of the PDR of an EVLA Subsystem is principally to review 3 questions:   Are the top level performance requirements for the subsystem.
Charge to the Review Panel
EVLA Monitor & Control System
Operations Software Bryan Butler.
ENGINEERING REQUIREMENTS FOR BENCH TESTING, SYSTEM INTEGRATION, AND TEST ANTENNA Author George Peck EVLA Software M&C PDR Date May 14 – 15, 2002.
Mark McKinnon EVLA Project Manager
Background Information P.Napier
EVLA M&C Components Observation Executor, Interim & Final Obs2script
EVLA Monitor & Control Bill Sahr NSF Review May , 2006
EVLA Advisory Committee Meeting System Status
VLA EXPANSION PROJECT Correlator Issues.
EVLA Advisory Panel Mtg. System Overview
Presentation transcript:

Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Transition

Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, Antennas Antennas – Front Ends  Not all Front Ends Will Be EVLA Until 2010  F320 FE Transition Module  Interfaces up to Two F14’s  Uses A/D Design by George Peck  In-House Design Simulates VLA Dataset

Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, Antennas Antennas – Wye Monitor System  M302 Utility Interface Replacement  Wye-Com Cable Will Disappear  Reduce Two M&C Systems into One  Consolidate Functions to Their Devices  Reduce Number of External Functions

Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, Antennas Antennas – ACU and FRM Systems  ACU & FRM System Replacements Not Part of EVLA Phase I  Bob Broilo Designed Interface  Interface is Between MIB and DCS System  ACU & FRM if Replaced Early Will be Paid by Operations or EVLA Contingency

Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, Control Building Control Building To Antennas  EVLA Antennas Connect to EVLA M&C  Includes Transition Modules  SLC Operates VLA Antennas  Operates EVLA at VLA BasebandUntil New Correlator is Installed  No VLA Baseband Transition for the New Correlator

Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, Control Building Control Building to Master Rack  EVLA Master Rack Connected to EVLA M&C  SLC Controls VLA Master Rack  SLC is Connected to Modcomps  Upon Modcomp Retirement SLC will be Placed under Control of EVLA M&C

Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, VLA

Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA & VLA (I)

Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA & VLA (II)

Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, Control Building Weather Station  Connected to VLA Master Rack  Interfaces Re-Designed for EVLA  Modernized Weather Instrumentation  Fiber Run to Weather Station in Place

Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, Control Building Control Building to Wye Monitor System  HVACs, UPS’s, and Generators  Interfaces Re-Designed for EVLA  Fiber Runs to Generator Building, Etc.

Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, Control Building Control Building to Other  Atmospheric Phase Interferometer (API)  Modernized API for EVLA  VLBI/VLBA Racks  Interface Hooks to EVLA M&C

Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, Control Building Control Building to Other  HTRP or Pulsar Equipment Racks  Stand-Alone – Provide EVLA Hooks  New Correlator Provides Improved Capabilities for Pulsar Work  Pie Town Link  Modernized to EVLA in Future  Part of Phase II