CS-EE 480 Spring 2005 1January 2005 Project Grey Wolf Digital CMOS “Memory” Game Team Lindsay Megyesi Taya Campagna Mason Tabata Weston Kurisu Advisor.

Slides:



Advertisements
Similar presentations
EE/CS 480 Fall October 2007 University of Portland School of Engineering Project Killdeer Digital Tire Pressure Monitoring System Team John Hirano.
Advertisements

CS-EE 480 Fall November, 2005 University of Portland School of Engineering Project D River Robot Navigation Team John Fastabend Justin Meyer Kim.
EE/CS 480 Fall September, 2007 University of Portland School of Engineering Project Blue Heron Educational Ball and Beam Control System Team Bryan.
CS-EE 481 Spring University of Portland School of Engineering Project Golden Mantle CMOS 8-Bit Analog-to-Digital Converter Team T Travis Tompkins.
CS-EE 481 Spring March, 2005 University of Portland School of Engineering Project Swift Fox Automotive Accelerometer & RPM Monitor Team Andrew Robinson.
EE/CS 480 Fall September, 2007 University of Portland School of Engineering Project Puffins Complex Multivariable Keypad Input Chip Team RuthAnn.
EE/CS 480 Fall September, 2007 University of Portland School of Engineering Project Puffins Synchronous Chorded Keypad Input Chip Team RuthAnn Gobble.
EE/CS 481 Spring Founder’s Day, 2008 University of Portland School of Engineering Project Golden Eagle CMOS Fast Fourier Transform Processor Team.
EE/CS 480 Fall September, 2007 University of Portland School of Engineering Project Goldeneye Freshmen Engineering Database for the University of.
CS-EE 481 Spring March 2007 University of Portland School of Engineering Project Boring Magnetic-field Monitoring Microprocessor Machine (MMMM) Team.
EE/CS 481 Spring February, 2007 University of Portland School of Engineering Project Killdeer Digital Tire Pressure Monitoring System Team John Hirano.
Senior Design 1 University of Portland School of Engineering.
CS-EE 481 Spring January 2007 University of Portland School of Engineering Project Boring MMMM (Magnetic-field Monitoring MOSIS Machine) Team Mr.
CS-EE 481 Spring University of Portland School of Engineering Project Golden Mantle CMOS 8-Bit Analog-to-Digital Converter Team T Travis Tompkins.
CS-EE 481 Spring February, 2006 University of Portland School of Engineering Project Molalla Microprocessor-based Charge Controller Team Andrew Melton.
CS-EE 481 Spring January, 2007 University of Portland School of Engineering Project Enterprise Biggerfoot Textbook Exchange Team Andrew Elliott Robert.
EE/CS 480 Fall /29/2015 6:24:03 AM University of Portland School of Engineering Project Burnside Programmable Logic Solar Radiant Heating System.
CS-EE 480 Fall November 2006 University of Portland School of Engineering Project Glide Garage Door Tele-Controller Team Graham Linn Srija Pidaparthy.
CS-EE 481 Spring Founder’s Day, 2004 University of Portland School of Engineering Project Steelhead A CMOS 4-Bit x 4-Bit Multiplier Authors Scott.
CS-EE 480 Fall November, 2005 University of Portland School of Engineering Project Long Tom OTTR Team Annette DeVille Tom Kinnear Jeff Scott Advisor.
CS-EE 481 Spring February, 2007 University of Portland School of Engineering Project ZigZag Team Adam Russell Will French Matt Heye Advisor Dr. Rylander.
CS-EE 480 Fall November, 2005 University of Portland School of Engineering Project Beaver Marsh: Digital Odometer Team Josh Eby Brandon Pearsol Kirk.
CS-EE 480 Fall September, 2003 University of Portland School of Engineering Project Brown Trout In-Line Headphone Amplifier Team Casey Hughes Jeff.
CS-EE 481 Spring February, 2005 University of Portland School of Engineering Project Swift Fox Automotive Accelerometer & RPM Monitor Team Andrew.
Fall CS-EE 480 University of Portland School of Engineering Project Meadowlark CMOS Programmable Digital Low-Pass Filter Jennifer Galaway Jennifer.
CS-EE 481 Spring 2007 March University of Portland School of Engineering Project Beaver Marsh: Digital Odometer Team Kirk Chen Josh Eby Brandon Pearsall.
CS-EE 480 Fall November, 2005 University of Portland School of Engineering Project Pudding Havoc Command Team Ray Dehler Brandon Moreno Will Supinski.
EE/CS 480 Spring February 2008 University of Portland School of Engineering Project Puffins Synchronous Chorded Keypad Input Chip Team RuthAnn Gobble.
CS-EE 480 Fall September, 2004 University of Portland School of Engineering Project Flying Squirrel Discrete Accelerated Wellness Numerator (DAWN)
Fall CS-EE 480Team Pit Roach University of Portland School of Engineering November Program Review Team Pit Roach B 2 Logic to L-Edit Translator.
CS-EE 480 Spring 2006 Sublimity Audio 1 September, 2006 University of Portland School of Engineering Project Sublimity Audio Stereo Class D Audio Amplifier.
EE/CS 480 Spring February 2008 University of Portland School of Engineering Team Matthew Gridley Tim Morris Nathan Oliver Advisor Dr. Rylander Industry.
EE/CS 481 Spring 1 EE/CS January, 2008 University of Portland School of Engineering Project Merlin WOC 60 :Wind Output Converter to 60Hz Team Tammy.
CS-EE 480 Fall November 2004 Project Grey Wolf Digital CMOS “Memory” Game Team Lindsay Megyesi Taya Campagna Mason Tabata Weston Kurisu Advisor Dr.
EE/CS 481 Spring 2008 Project Killdeer Digital Tire Pressure Monitoring System Team John Hirano James Kelly Kevin Young Advisor Dr. Joseph Hoffbeck Industry.
EE/CS 481 Spring February, 2008 University of Portland School of Engineering Project Surf Scoter Electronic Ballast for a Fluorescent Lamp Team McGuire,
CS-EE 481 Spring February, 2006 University of Portland School of Engineering Project Snake Automated Guitar String Tuner Team Kenneth Aramaki.
EE/CS 480/481 12/12/ :16:40 PM University of Portland School of Engineering Project Yew Inline Power Monitor with Cost Analysis Team Zubin Bagai.
CS-EE 480 Fall 2006 November, 2006 University of Portland School of Engineering Team Bridgeport Project BAT Team Jamie Quint Ian Tagge Advisor Dr. Vegdahl,
Project Long Tom OTTR Team Annette Collins Tom Kinnear Jeff Scott Advisor Dr. Aziz Inan Dr. Peter Osterberg Industry Representative Mr. Mike Desmith Intel.
CS-EE 480 Fall September, 2004 University of Portland School of Engineering Project Grey Wolf Digital CMOS “Memory” Game Team Lindsay Megyesi Taya.
EE/CS 481 Spring University of Portland School of Engineering Project BoG Wireless Breath-Analyzer with Key- Lock Team Jessica Herman Patrick Hunt.
CS-EE 481 Spring University of Portland School of Engineering Project Golden Mantle CMOS 8-Bit Analog-to-Digital Converter Team T Travis Tompkins.
CS-EE 481 Spring January, 2005 University of Portland School of Engineering Project Swift Fox Automotive Accelerometer & RPM Monitor Team Andrew.
EE/CS 480 Spring February 2008 University of Portland School of Engineering Team Matthew Gridley Tim Morris Nathan Oliver Advisor Dr. Rylander Industry.
CS-EE 481 Spring Founder’s Day, 2006 University of Portland School of Engineering CMOS Digital Lock Authors Julie Barton-Smith Cory Johnson Jessica.
CS-EE 480 Fall September, 2006 University of Portland School of Engineering Project Holonomic Control System Team Grant Hay Jeff Hayes Dan Hoffman.
EE/CS 481 Spring 1 EE/CS January, 2008 University of Portland School of Engineering Project Merlin WOC 60 :Wind Output Converter to 60Hz Team Tammy.
CS-EE 480 Fall November, 2005 University of Portland School of Engineering Project Molalla Microprocessor-based Charge Controller Team Andrew Melton.
CS-EE 480 Fall October, 2003 University of Portland School of Engineering Project Lamprey A CMOS Traffic Light and Intersection Control circuit Team.
EE/CS 480 Spring February, 2008 University of Portland School of Engineering Project Golden Eagle Fast Fourier Transform Processor Team Sandra Pellecer.
CS-EE 481 Spring January, 2004 University of Portland School of Engineering Project Lamprey A CMOS Traffic Light and Intersection Control circuit.
CS-EE 481 Spring February, 2004 University of Portland School of Engineering Project Lamprey A CMOS Traffic Light and Intersection Control circuit.
CS-EE 481 Spring March, 2005 University of Portland School of Engineering Project Bighorn CMOS Low Pass Switched Capacitor Filter Team Brien Bliatout.
Project Glide Garage Door Tele-Controller
Project Glide Garage Door Tele-Controller
Project Owyhee MOSIS Digital Lock
Project Owyhee Digital Lock
Project Sublimity Audio Stereo Class-D Audio Amplifier
Industry Representative
Project Meadowlark CMOS Programmable Digital Low-Pass Filter
Project Molalla Microprocessor-based Charge Controller
Project Deadwood A Digital Enigma Machine
Project Grey Wolf Digital CMOS “Memory” Game
Authors Mason Tabata Weston Kurisu Taya Campagna Lindsay Megyesi
Project BoG Wireless Breath-Analyzer with Key-Lock
Project Owyhee MOSIS Digital Lock
Project BoG Wireless Breath-Analyzer with Key-Lock
Presentation transcript:

CS-EE 480 Spring January 2005 Project Grey Wolf Digital CMOS “Memory” Game Team Lindsay Megyesi Taya Campagna Mason Tabata Weston Kurisu Advisor Dr. Lu, Dr. Osterberg Industry Representative Mr. Dave Dunning of Intel

CS-EE 480 Spring January 2005 Overview Introduction Block Diagram Accomplishments Plans Schedule and Milestone Table Issues/Concerns Conclusions

CS-EE 480 Spring January 2005 Introduction Creation of digital “Memory” game using MOSIS technology and a PIC18F452 microcontroller

CS-EE 480 Spring January 2005 Block Diagram

CS-EE 480 Spring January 2005 Accomplishments Design review checklist and approval meeting. Ordered/received parts. We enjoyed Christmas break. ed Sandy a list of supplies. Contacted Dave (our industry rep) and informed him of our schedule.

CS-EE 480 Spring January 2005 Accomplishments…cont Created flow diagram for microcontroller. Completed turn counter for macro model using Verilog. Started random number generator programming for macro model. Received L-Edit chip layout (both BLT and hand versions).

CS-EE 480 Spring January 2005 Microcontroller Flow Diagram

CS-EE 480 Spring January 2005 L-Edit Layout (BLT)

CS-EE 480 Spring January 2005 L-Edit Layout (Hand)

CS-EE 480 Spring January 2005 Plans for February Theory of Operations 0.9, 1.0, and approval. Start putting hardware together. –Establish physical connections between Microcontroller and LCD. Program microcontroller. Complete programming for macro model. Update website when possible.

CS-EE 480 Spring January 2005 Schedule

CS-EE 480 Spring January 2005 Milestones NumberDescription OriginalPreviousPresent (9/28/04)(11/30/04)(1/25/05) 1September Program Review9/28/2004 2Product Approval10/8/200410/14/2004 3October Program Review10/26/2004 4B2 Logic Simulation11/5/2004 5Project Plan 0.911/5/2004 6Project Plan Approval11/12/ tpr File Completion11/19/200411/23/2004 8Submit MOSIS design11/24/2004 9November Program Review11/30/ Design Release and Approval Meeting12/10/ January Program Review1/25/ Theory of Operations Approval2/11/2005

CS-EE 480 Spring January 2005 Milestones Cont. NumberDescription OriginalPreviousPresent (9/28/04)(11/30/04)(1/25/05) 13Macro Model of Chip2/14/ February Program Review2/22/ Microcontroller Programmed2/28/ System Integration3/28/ March Program Review3/29/ Prototype Release and Approval Meeting4/8/ Founder’s Day Celebration4/12/ Final Report4/22/2005

CS-EE 480 Spring January 2005 Concerns/Issues Staying on schedule. Getting reimbursed for parts.

CS-EE 480 Spring January 2005 Conclusions After break, we are ready to start implementing our design. We have completed the necessary steps to begin constructing our project. The bulk of next months work includes programming the microcontroller and macro model. Any questions?