Wayne King | Senior Traffic Engineer – Hutt City Council Simon Prosee | Transport Engineer – GHD Puffin Pedestrian Crossings SNUG 2015.

Slides:



Advertisements
Similar presentations
Alertness and Attitude
Advertisements

Presented by Nazir Lalani P.E TRAFFIC SAFETY EVALUATIONS (Pedestrians and Bicyclists)
Accessible Pedestrian Signal
October 28 th, Hwy 97 – Carson to Fox Mountain Road Four Lanning  Review Project Scope Problem Definition Objectives  Summary of Work Completed.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Assessing and Managing Risk
Transportation Safety. Objectives Introduce students to the TDL Career Cluster: Transportation Systems/Infrastructure Planning, Management, and Regulation.
Publication No. FHWA-HRT Federal Highway Administration University Course on Bicycle and Pedestrian Transportation International Approaches to Bicycle.
Road Traffic Systems National Road Safety Conference April 24, 2007.
In March 2015, Mayor Murray announced a proposal for a new 9-year, $900 million transportation levy to replace the Bridging the Gap levy that expires at.
Michael Nieuwesteeg Causes of crashes affecting pedestrians.
T.H. 23 / South Saratoga Street Reduced Conflict Intersection and Pedestrian Overpass Project Project hearing October 14, 2014 City Council Presenters.
School of Economics "Valjevo" Road safety for all participants based on the knowledge of the youngest. As tomorrow they will become drivers, pedestrians,
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Cyclists and your vehicle Company name. January 24 th March 18 th April 6 th January 23 rd April 6 th May 17 th May 23 rd June 25 th June 9 th July 4.
1 Austin Transportation Department Ali Mozdbar, P.E., PTOE Division Manager, Traffic Signals Traffic Signal Features for Pedestrians & Bicyclists.
EVALUATION OF “TARGETED PEDESTRIAN ENFORCEMENT” Philip M. Salzberg and John M. Moffat Washington Traffic Safety Commission Olympia WA
March 8, 2005 Pedestrian Connections  Some key arterial segments are missing sidewalks (Meridian, 1 st and 15 th Ave).  ¼ of the residential areas have.
HAWK Evaluation NE/SE 41 st Ave & E Burnside St Sirisha Kothuri William Farley Kimber Miller Aaron Rieck Civil & Environmental Engineering.
Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.
Traffic Engineering Teaching Kids the ABC’s of Traffic Engineering The Chattanooga School Outreach Program.
A Study of the 2004 Street Smart Communications Program Prepared by Riter Research for: Metropolitan Washington Council of Government’s May 2004 Advertising.
With Pictures.  Bus Bus Schedule CarBike BicycleTruck.
CREATING THE CASE FOR MORE TRAVEL CHOICES John Bartels, City of Port Phillip and Ainsley Nigro, GHD Cost Benefit Analysis for Implementing Separated Bike.
SafeZone Martin Baker Road Safety Team Leader Poole Borough Council Kevin Jones UK Product Sales Manager Siemens.
October 17, 2012 Connie S. Sorrell Chief of Systems Operations.
Road Infrastructure and Road Safety George Mavroyeni – Executive Director, Major Projects (former Executive Director, Road Safety and Network Access) May.
T.H. 23 / SOUTH SARATOGA STREET REDUCED CONFLICT INTERSECTION AND PEDESTRIAN OVERPASS PROJECT PROJECT HEARING June 10, 2014 City Council Presenters Glenn.
20 mph - The Cambridge Experience John Richards Acting Project Delivery & Environment Manager.
Crossing the Complete Street Presentation for the Sacramento Complete Streets Workshop July 10, 2009 Meghan F. Mitman, AICP Fehr & Peers Transportation.
Pedestrian Safety & Mobility Assessment Tool. Background Pedestrian Safety Impact Statement requested by Citizens’ Advisory Committee January 2010 Intended/Potential.
Intersections.
E MESE MAKÓ, PhD Associate professor Department of Transport Infrastructure Szechenyi Istvan University, Gyor, Hungary Evaluation of Human.
EMERGENCY MANAGEMENT WARRANDYTE COMMUNITY FORUM, 12 NOV 2015 TRAFFIC MODELLING.
Illinois Department of Transportation Safety Portal Presented to Illinois Association of County Engineers (IACE) Traffic & Safety Committee On July 31,
- Cities for Innovation in Road Safety – A Traffic Safety Plan for Dresden „Friedrich List“ Faculty for Transportation and Traffic Sciences, Institute.
Level Crossings Safety Regulation in Great Britain Don Wilson HM Principal Inspector of Railways.
1 Central Area Roundup NZTA (central) 1 Wellington Upper Hutt Hutt Porirua Kapiti Coast New Plymouth Palmerston North Whanganui Nelson/Tasman Napier Hastings.
Christchurch Transport Operations Centre SNUG 2015 This Presentation CTOC (Christchurch Transport Operations Centre) - Update Achievements from the last.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Chapter 2 Signs, Signals, and Roadway Markings Start working on the Start working on the 8 questions on page 39! 8 questions on page 39!
ITS Trials Remuera Rd In-Pavement Warning System.
Hyndburn Children & Young People Road Safety Deborah Hall Road & Transport Safety.
STREET CROSSINGS Module 3 Part 1: General Principles.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
Assistant City Traffic Engineer
TRAFFIC CONTROL ORDERS DOWNTOWN MIDLAND January 23, 2017
Northern Tier US and Canadian locations
Saving the King Street Bicycle Boulevard
#YDF2017.
Monday 23 to Friday 27 November 2017
Fordham at Columbia as a Grade-Separated Intersection
Technical and Public Advisory Committee Meeting #3
ROAD SAFETY By Pranav Pillai V C K.V. INS Hamla.
Safety Effects of Marked vs
Paper by Marion Sinclair and Gladwin Dennysen.
Tram cycle safety improvements programme
Rush-hour truck ban.
ROAD SAFETY By Pranav Pillai V C K.V. INS Hamla.
Pedestrian Signal Rest States
Tron Topics.
Roundabout metering Tauranga Experience 2 November 2018.
AMA Intelligent Transportation Systems
NZTA Shared Pedestrian and Cycle Lantern Trial
How technology and data can bring needed improvements to air quality and the environment Dr Dave Williams 8th November 2018.
Fordham at Columbia as a Grade-Separated Intersection
Parks Highway Reconstruction: Lucas Road to Big Lake Road
Alex Henry FDOT District Seven Safety Office
Project Location: 35th Ave HSIP8
Presentation transcript:

Wayne King | Senior Traffic Engineer – Hutt City Council Simon Prosee | Transport Engineer – GHD Puffin Pedestrian Crossings SNUG 2015

Presentation title Background Hutt City Council moving towards UK Puffin style of signalised crossings -Near side pedestrian displays -Newer crossings: Presence and progression detectors + phase extension/cut off Safety and Efficiency benefits Puffin Pedestrian Crossings SNUG 2015 NZTA trial focused on user compliance -Crossing in phase -Crossing at the crossing Largely successful. Many been in for a few years now with. Previous SNUG presentations on concept and economics

Presentation title Methodology Taking a quick look at how Puffin crossing improvements have translated into CAS safety record. Two types of sites: Signalised to Puffin Zebra to Puffin Quick comparison of crash rates Consider typical CMF numbers Midblock traffic signals Pedestrians Overall Compare to Hutt City Pedestrian incident trends Look at crash types Puffin Pedestrian Crossings SNUG 2015

Presentation title Results – Signals to Puffin Six sites combined: Puffin Pedestrian Crossings SNUG 2015

Presentation title Results – Zebra to Puffin Four sites combined: Puffin Pedestrian Crossings SNUG 2015

Presentation title Results – Hutt City Pedestrian Crash Rates Downward trend Puffin Pedestrian Crossings SNUG 2015

Presentation title Results – Crash Type Puffin Pedestrian Crossings SNUG 2015

Presentation title Conclusions Constraints Small data set Different traffic environments Targeted improvements Simultaneous improvements Usual CAS limitations Encouraging results Downward trend in pedestrian crashes Puffin crossings showing improvement to safety record Telling us what we already observe – better road user awareness and behaviour Puffin Pedestrian Crossings SNUG 2015

Presentation title Puffin Crossings Got the Law Changed – to allow near side displays Installed a Full PUFFIN Compliance improved (OPUS Measured it) Did some economics – High B/C covers the marginal cost to install or retrofit. Looked at the Crash Performance – an Improvement Why has HCC got more PUFFIN’s than the rest of NZ summed? Evidence based - It simply makes good sense. Puffin Pedestrian Crossings SNUG 2015

Presentation title Puffin Pedestrian Crossings SNUG 2015 Questions

Presentation title Boring Data – Zebra to Puffin 15 Railway Ave: Puffin Pedestrian Crossings SNUG Victoria St: 66 Victoria St: 61 Woburn Rd:

Presentation title Boring Data – Improved Sites Improved sites: Signalised to Puffin 12 Daysh Street – April to July The Esplanade – April to July Ludlam Crescent – April to July 2010 Knights Road at Myrtle Street – April to July 2010 Queens Drive near Fraser Street – April to July Woburn Road – April to July 2010 Zebra to Signalised to Puffin 15 Railway Avenue – Late 2008 to 23 Feb2009 (Initial NZTA trial site) Zebra to Puffin 32 Victoria Street – May 2012 to Oct Victoria Street – Feb 2014 to May Woburn Road – 19 Jul 2012 Puffin Pedestrian Crossings SNUG 2015