Michel RAYMOND – December 7 th, 2012 Technical Support Activities in PH-ADO-PO Statement of 2012 activities Schedule & Organization on LS1.

Slides:



Advertisements
Similar presentations
Atlas standard opening ATLAS Project Document N°: ATL-HT-OP-0014 EDMS id Created : January 13 th, 2009 Modified : Main document Overall view of.
Advertisements

Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer,
Design Office meeting Design office meeting.
M. Raymond – 08 January 2014 Summary of electrical activities foreseen on ATLAS.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. O. Beltramello, G. Corti, B. Di Girolamo, R. Lindner, W. Riegler, C.
T. Kawamoto1 Small Wheel upgrade project Muon week, upgrade meeting T. Kawamoto.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
Technical Support Activities in PH-ADO-PO
1/6 ALICE GLIMOS, Marc Tavlet Hazards and Safety in ALICE - Ways to reduce the risks Presentation at the ALICE Club, Monday, December 1 st, 2003 by Marc.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
ATLAS and CERN/ST 2nd April 2003 Marzio Nessi. 02/04/2003 Today ATLAS project Detector Components Construction Detector Integration and Installation ATLAS.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
1 Safety and Database Subsection ADO - PO - SA Main safety projects / activities Main safety projects / activities RP issues RP issues Patrols Patrols.
Section Meeting: TC overview. Outline TCn organization TCn activities – Maintenance and new installations Short term priorities Mid Term priorities Long.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
ATLAS closing scenario  Where we are  What is still be done before closing (ADO-PO support)  Closing scenario / Procedure / Schedule Prepared by Michel.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
ADO-PO Section Meeting Safety Activities Sigi Wenig (LEXGLIMOS) 8 September 2015.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Preamble Run 2 and Run 3 will see the continued exploitation of the forward physics potential of the LHC in the long straight sections (LSS) either side.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
B.Puccio MPE Workshop for LS1 / 22 & 23 Nov Logistics for DYPB activities Bruno PUCCIO (TE/MPE)
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
Project Office Activities R. Vuillermet 08/09/2015R. Vuillermet PH-ADO-PO1.
WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
TE-CRG Activities D. Delikaris, TE-CRG.
Status on closing operations End cap calorimeter side A Forthcoming operations ATLAS – April 17th, 2009 Prepared by Michel RAYMOND.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
Interventions on electrical distribution and racks’ infrastructure still to be done during LS1 and their impact W.Iwanski.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
EDMS N° V.1 TE-EPC Activities during LS1 V. Montabonnet [TE-EPC]
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
ELENA installation progress F. Butin / ELENA collaboration.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
ADO-PO / TC meeting 1st December 2016
ADO–PO/TC Meeting Safety Activities
ADO-PO / TC meeting NJD/NSW Assembly Raphael Vuillermet.
ADO-PO section meeting. ADO : Atlas Detector Operation
TC activities.
Technical Support Activities in EP-ADO-PO
LS2 session J.M Jimenez, J.-P. Tock, K. Foraz 24/11/2017
Technical Support Activities in PH-ADO-PO
Presentation transcript:

Michel RAYMOND – December 7 th, 2012 Technical Support Activities in PH-ADO-PO Statement of 2012 activities Schedule & Organization on LS1

M. Raymond – December 7 th, 2012 Manpower assigned to the Technical Support (2012) Point 1 Facilities Detector environment D. Bertet C. Scalisi + General support + Safety team Point 1 Facilities Detector environment D. Bertet C. Scalisi + General support + Safety team Counting rooms Racks C. Scalisi Counting rooms Racks C. Scalisi Magnet P. Benoit C. Sordé (+ DSS) Magnet P. Benoit C. Sordé (+ DSS) Muons EE V. Durastanti C. Leboube F. Limia Conde A. Yandyan Muons EE V. Durastanti C. Leboube F. Limia Conde A. Yandyan Movement system F. Rosset C. Sordé + General support Movement system F. Rosset C. Sordé + General support Supervision/operations M. Raymond Supervision/operations M. Raymond Access L. Rose-Dulcina G. Akhperjanian + General support D. Bertet P. Benoit Access L. Rose-Dulcina G. Akhperjanian + General support D. Bertet P. Benoit Mechanical workshop G. Akhperjanian (20%) V. Durastanti C. Leboube L. Rose-Dulcina A. Yandyan + A. Bode (PH/DT) Mechanical workshop G. Akhperjanian (20%) V. Durastanti C. Leboube L. Rose-Dulcina A. Yandyan + A. Bode (PH/DT) IBL L. Rose-Dulcina F. Limia Conde IBL L. Rose-Dulcina F. Limia Conde JD lifting A.Bode C. Leboube A. Yandyan G. Akhperjanian JD lifting A.Bode C. Leboube A. Yandyan G. Akhperjanian

M. Raymond – December 7 th, 2012 Distribution of 2012 activities Plot is based on affected time

M. Raymond – December 7 th, 2012 Objectives 2012 – Where we are Infrastructure and safety system Sniffers maintenance Reinforcement of USA15 floor before new racks installation Improvement of plastic cover on top of PX16 Maintenance activities : radiation gate monitors, DSS, FPIAA, Minimax, etc… the list is too long to be exhaustive Platforms and access Extensions of top ECT platforms Fabrication and installation of additional access to EEL and EES Hand rails on top of JFS Replacement of provisional access with permanent platforms (S3 & S7) Definition and purchase of scaffolding for SW gap Fabrication and installation of Visitor platform at P1 Legend : Done, On going, Not yet done Logistics Organization and supervision of the storage in surface buildings Logistics for IBL Spare components on Muon system

M. Raymond – December 7 th, 2012 Maintenance and upgrade of the existing movement system Yearly maintenance of hydraulics components Integration of shielding movement on main hydraulic group Improvement of air supply table Improvement of accuracy of detector positioning Shielding ECT shielding : still under study Machining of TAS shielding : subcontracted Support for Buffer zone shielding Support for USA15 shielding prototyping Magnet Installation of ECT turbo-pumps (on going) Upgrade of AFT, development on alignment system Design of ECT Z-stops Warm structure check preparation (control in 2013) Participation to DSS & Magnet control piquet Legend : Done, On going, Not yet done Objectives 2012 – Where we are

M. Raymond – December 7 th, 2012 IBL project Machining of parts and assembly Coordination of the activity / collaborators Test and development around the mock-up EES chamber Tooling : modification and preparation in UX15 Chamber integration and move to B180 Chamber installation at beginning 2013 Support to nSQP and ZDC Small parts machining Lifting of Small Wheel to surface Parts machining and platforms modification Load test Completion of the painting of the frame Objectives 2012 – Where we are

M. Raymond – December 7 th, 2012 LS1 schedule overview Pixels in SR1 EE chambers Available on edms, id BOE/BME chambers Power supply, access, cooling very restricted on Sept. 2013

M. Raymond – December 7 th, 2012 Opening schedule ≈ 5 weeks Large opening

M. Raymond – December 7 th, Work organization during opening  Baseline of work is 5 days/week,  Monday to Friday, 2 teams working in staggered hours in order to cover 15.5 hours/day 5:00 to 13:00 and 12:30 to 20:30  Work on Saturday is exceptional and on a normal hours basis.  Crane drivers will cover the full period in two shifts too.  A very good coordination with RSO and RPE is needed, the RPE should be looked at as being fully part of the team so that they know when their intervention is required.  Safety shifts are organized too (see Olga’s talk)  Good communication is also required. A web page summarizes the main information  Daily meeting is organized where activities are checked and discussed

M. Raymond – December 7 th, 2012 Movement experts : F. Rosset + C. Sordé + M. Raymond they will supervise the teams, at least for what concerns movement preparation and the movements themselves. Team of technicians : 14 technicians G. Akhperjanyan, P. Benoit, C. Leboube, L. Rose-Dulcina, A. Yandyan are part of the teams involved in the opening process. A.Bode will reinforce the team too. M. Alves and J. Bonenfant will join from LAL 3 technicians will come from JINR (from N. Topilin) : S. Yukhimchuk, A. and S. Ustinov 3 technicians are foreseen from JINR (from N. Zimine) : O. Lykov + 2 not yet known Didier Bertet, Charles Scalisi and Francisco Limia Conde will be involved in Sniffer maintenance and RPA service, they will also participate through safety actions Manpower organization on opening process The baseline for the manpower organization during opening/closing process is unchanged, however any suggestion or comment can be studied. Michel and Raphaël will organise and supervise the work, take care of most of the heavy load lifting and lowering, organize relation with RPE and other systems ; Marco will support them. Aboud will intervene for JD/SW lifting. A team dedicated to EE chamber installation, supervised by Giancarlo, will be built. In April, more support is foreseen for Sniffers (Cédric, Fred).

M. Raymond – December 7 th, 2012 LS1 shutdown organization at P1 M. Nessi has defined the general organization of the Technical Coordination Doc. ATU-GE-MG-0004, edms Access mode : UX15 : General mode, no key needed, access through IMPACT  no SLIMOS intervention Toroid area (UX15) : Restricted mode, key and SLIMOS intervention still needed USA15, US15, SX1, RBZ : General mode Even in General mode, IMPACT request is needed before any activity. It is not anymore limited to 1 day, duration will be defined regarding the risk analysis Overall steering, hour by hour, of the work in UX15, SDX1, SX1 is done by the Engineer on Duty (EOD) Schedule control Crane usage Common tools Conflicting activities Impacts… Chairing of the daily meeting Reference in situ to everybody working on a work package Safety shifts will be organized (see Olga’s talk) Safety shifters report in first place to the EOD and to the GLIMOS (as usual)

M. Raymond – December 7 th, 2012 Technical Coordinator SLIMOS 2 shifts /day - 5 days 7:30 – 13:30 13:30 – 19:30 Extended for Opening SLIMOS 2 shifts /day - 5 days 7:30 – 13:30 13:30 – 19:30 Extended for Opening OPM 1 shift / week (7 days) OPM 1 shift / week (7 days) EOD 1 shift / week + Deputy in extended hours period EOD 1 shift / week + Deputy in extended hours period Safety shifter RPE 1 shift / week RPE 1 shift / week RPA 1 shift / day Normal hours RPA 1 shift / day Normal hours WPs leaders GLIMOS LS1 shutdown organization at P1 Crisis management ALARA team