The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
F. Savary on behalf of the WP11 team Input from V. Baglin, D. Ramos.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
HL-LHC Quality management
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
H. Prin, F. Savary, D. Duarte Ramos, L. Grand- Clement, C. Mucher, A. Temporal.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
12th HL-LHC Parameter and Layout Committee meeting.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Overview and Status of The CERN-INFN Collaboration Agreement for R&D Activities Relating to High- Luminosity LHC (HL-LHC) Superconducting Magnets Giovanni.
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The integration of 420 m detectors into the LHC
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
HL-LHC 11 T Dipole for DS Collimation 8 th to10 th December, 2014 D. Duarte Ramos, C. Mucher, L. Gentini, T. Sahner, H. Prin, R. Wawrowski, F. Savary,
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
MQXFB Prototype structure and plans at CERN J.C Perez On behalf on MQXF collaboration team Joint HiLumi-LARP Meeting & 24 th LARP Collaboration Meeting.
Magnet Components and Assemblies F. Savary
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Teleconf ACS – FREIA 28th March 2017
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Cold mass design, assembly plans and QA/QC at CERN
Roadmap for triplet cryostats
11 T Dipole Integration & Plans M. Karppinen
Testing of SC Magnets Status - November 2010
Internal review of IR2 LEP cryostats (WP11/WP5) Close out session
LEP cryostat Procurement strategy and plans
Cryostat procurement, status and plan, QA/QC
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Status of cryostat integration and conceptual design
Teleconference ACS – FREIA 10th May 2017
From Design to Installation courtesy R. Folch S. Atieh TS / MME
Update on development of consolidated insulation system and procedures C. Scheuerlein, 4th DISMAC meeting,
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Parts exchange for HL-LHC AUP Q1&Q3
The 11T cryo-assembly: summary of design and integration aspects
DS Collimators TE-MSC-CI
WP3 Meeting – December the 10th 2015 H. Prin
Title of the presentation: Methods and Data Analysis
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement Q5 for IR6 H. Prin With inputs from D. Ramos Duarte, M. Souchet, M. Bajko, H. Kos

2 Q5 cryomagnets for point 6 Feasibility study Feasibility study Assembly procedures Assembly procedures Assembly drawings (LHCLMQ_A0022) Assembly drawings (LHCLMQ_A0022) Components availability Components availability 4 MQY needed out of 7 existing spares (MQY20,21,27,28,29,30,31) 4 MQY needed out of 7 existing spares (MQY20,21,27,28,29,30,31) 1 MCBYA needed out of 3 existing spares (MCBYA39,40,41) 1 MCBYA needed out of 3 existing spares (MCBYA39,40,41) 1 MCBYB needed out of 3 existing spares (MCBYB42,43,44) 1 MCBYB needed out of 3 existing spares (MCBYB42,43,44)  To be chosen according to the performance   To be cold test before assembly? Shells Shells End covers End covers Cold bore tubes Cold bore tubes Connection kits Connection kits Tooling availability Tooling availability  Recovered from the insertion cold masses production  Qualified in bldg. 180 during the spared Q5L8 prod. For LS1  Welding press upgrade could be performed Cold mass assembly drawing Stored MQY and MCBY magnets Feasibility study Feasibility study Assembly procedures to be adapt from present Q5IR6 cryoassemblies Assembly procedures to be adapt from present Q5IR6 cryoassemblies Assembly drawings  Assembly drawings  Components availability  Components availability  Vacuum vessel  Vacuum vessel  Bottom tray  Bottom tray  QQS service module  QQS service module  End covers  End covers  Tooling availability Tooling availability  Recovered from the insertion cold masses production  Qualified in bldg. 180 during the spared Q5L8 prod. For LS1  Welding press upgrade to be performed

3 Production schedule About 6 months to assemble the 2 cold masses. The assembly can start once: The press is reconfigured The press is reconfigured  5 consolidated dipole cold masses to be welded before Magnets are identified Magnets are identified Magnets are cold tested if required Magnets are cold tested if required 2 months for the cryostating per cold mass The assembly can start once: The components are delivered (including the cold mass) The components are delivered (including the cold mass) About 5 weeks for each cryoassembly Less than 1 month for each cryoassembly