TS3 preparatory meeting 14/9/2012 TS3: 17-21/9 2012.

Slides:



Advertisements
Similar presentations
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
Advertisements

TC meeting /11/14TC meeting2 ALICE LS1 plan from now till MarchWeeks Install TRD infrastructure46 TRD4&5 (and counterweights removal)47.
André Augustinus 16 June 2003 DCS Workshop Safety.
LS1 planning meeting Activities weeks 13, 14 & 15 22/3/13LS1 planning meeting - A.Tauro2.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
TC meeting P2 planning wks 7&8 A.Tauro
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
DCS - general Unscheduled power cut Wed. morning ( , human error) –DCS (and HLT) off, due to UPS on bypass –In the middle of DB migration, had.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
LS1 reference slides LS1 plans Detector’s plans Services and central systems availability 8/2/13LS1 planning meeting - A.Tauro1.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
P2 status, LS1 planning A.Tauro - W.Riegler. Outline TS2 activities Detector activities during LS1 Proposal for ALICE recommissionig plan in 2014 Conclusions.
TS4 preparatory meeting TS4 – weeks Underground access possible in week 51 – as from Monday morning 9:30 –Ulli and Philippe will start.
winter shutdown preparatory meeting A.Tauro /12/11ALICE winter shutdown schedule - A.Tauro 1.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
ALICE TC meeting – Plans for the next technical stop A. Tauro.
André Augustinus 9 October 2006 Interlocks update.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
winter shutdown planning A.Tauro
winter shutdown planning A.Tauro
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
TS May 9-12 – Schedule SL instructions: Both magnets ramped down Monday May 9 th 7:00 latest Thursday: check with CCC before restarting magnets: – TE-EPC.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
TC meeting P2 planning wks 9&10 A.Tauro
ALICE Arturo Tauro Werner Riegler.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
ALICE 5 o’clock meeting Wk 49. INDICO You’ll find this meeting here: – The full shutdown planning.
ALICE TC Meeting – CV Detcool1 LHC stop 31 May, 1-2 June – CV/DETCOOL Interventions Cavern interventions: 31 9:15: Sampling with RP.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
TC meeting P2 planning wks 5&6 A.Tauro
TS2 preparatory meeting A.Tauro. General information LHC- TS2: from Monday 31st 6am, to Friday 4th 5pm LHC beam stops on Monday morning.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire DCP Meeting 20/06/12 Schedule for the technical of June.
TS3 preparatory meeting A.Tauro. General information LHC-TS3: from Mon 9 6am, to Fri 13 5pm LHC beam stops on Mon morning at 6:00.
TC meeting P2 planning wks 3&4 A.Tauro
ACO & AD0 DCS Status report Mario Iván Martínez. LS1 from DCS point of view Roughly halfway through LS1 now – DCS available through all LS1, as much as.
ALICE planning meeting /11/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
DCal-ALICE integration and installation plan and status A. Tauro.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
ALICE Installation: Planning Meeting Agenda: 1- ALICE shutdown schedule 2- Miniframe removal sequence.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
ALICE 5 o’clock meeting Wk 51.
TS2 preparatory meeting
LS1 planning meeting - A.Tauro
LS1 planning meeting
ALICE 5 o’clock meeting Wk
ITS Cooling: Xmas Plan Claudio Bortolin.
TS1 preparatory meeting
ALICE TC meeting – Plans for the next technical stop
Shutdown conclusion, LS1 and LS2 planning - A.Tauro
ALICE 5 o’clock meeting Wk
November technical stop activities:
Presentation transcript:

TS3 preparatory meeting 14/9/2012 TS3: 17-21/9 2012

TS3 Wk 38: Monday 17 th to Friday 21 st September Ramp down magnets (SL): between Mon 6:00 – 8:30 (latest) RP search (Arturo and Philippe?): Mon 8:30 – 9:15 Access starts Mon at 9:15 No access UX25 during the following periods: – Thursday 6:30 AM to 9:30 AM: monthly maintenance cavern lift (AS703) Please note that the CR lift will be maintained on Thursday between 9:30 AM and 12:30 AM – access to CRs via stairs Access stops Friday at 16:00 14/9/12TS preparatory meeting - A.Tauro2

Detector activities 1/3 DetectorIntervention TPCGeneral consolidation work Adjust gas flow through CO2 volumes Install Ethernet switch redundant system Route cables GEM proto TPC laserInvestigate problem with with Laser_1 and RS232 communication with Laser_2. TRDInstallation of multiplexers and additional switches for the TRD Ethernet connectivity. Check of the LV connections on the C side of the TRD supermodules (IR camera, voltage measurements). Tightening of problematic LV connections. Adding of patch cables for problematic connections. Backup trigger fibers to TRD sector 02 and 03 seem to be broken. Spare fibers will be pulled from pretrigger (bottom of L3) to the C-side of sector 02/03. Check of the TRD gas pipes in the cavern and of the gas connections at the TRD supermodules 14/9/12TS preparatory meeting - A.Tauro3

Detector activities 2/3 DetectorIntervention SPDReplace pump cooling plant SDDSDD/SSD cooling plant: replacement filter and T sensor. Replacement of a p sensor in PP4 SSDMeasure flow air cooling (PP4) Replace some CAEN low voltage PS on the A side and I side racks TOFReplacement of faulty DCDC converters MTGSoftware intervention on ext threshold (no cavern access) Regional card replacement on gangway (cavern access) Check on FET connections on MT12-out RPC4 (cavern access, stepladder) Gas intervention on humidifier (HV off, activity carried out by gas team, no IMPACT) MTKUpgrade electronic software (no cavern request); Possible intervention on CROCUS and MANU (cavern access, scaffolding/stepladder) 14/9/12TS preparatory meeting - A.Tauro4

Detector activities 3/3 DetectorIntervention HMPHMPID-RICH4 will be inspected using an endoscopic probe to check two leaking C6F14 radiator vessels CR5: replace gas manifold (Ar leak) Request to move C6F14 tank to CR5 PHORepair leak cooling plant: two new cooling valves installation for PHOS Module 4 EMCInvestigate FEE that is sending corrupt data Investigate LED Control Unit Re-install SRU module. T0Investigate the problem with one QTC channel and install new electronic modules to generate T0tot (like Votot) for background monitoring instead of V0 when V0 switch off ZDCRP measure both calorimeters ACO 14/9/12TS preparatory meeting - A.Tauro5

Other activities DetectorIntervention EN-HEInstallation/removal of UX25 crane remote controller Replacement fire retardant door PX24 SAS (cavern) GS-ASETest and maintenance of gas detection system DG-CO EN-CVFlow and RH measurements ITS ventilation (Surface, UX25 and L3) IT-CS EN-MEF-SI EN-CVsee next slide PH-DT (Gas group) Check TRD, TOF, MCH, and MTR gas systems Inspection TRD backup lines (LS1 modification) EN-ELReplacement safety lights UX25 DGS-RPRP measurement ZDCs (in view of the removal during LS1) 14/9/12TS preparatory meeting - A.Tauro6

Detector cooling Activities InstallationtypeDateDC contact User contact statusconsequenceImpact status SPD/SSD- SDD RP analysis17/09S.RousseeC.BortolinconfirmednothingWaiting approval SSD/SDD Replacement n°39 From 18/09 to 21/09 S.Roussee C.Bortolin confirmed nothingWaiting approval Replacement of the filter From 18/09 to 21/09 Stop coolingWaiting approval SPD Replacement pump « B » & Safety valves From 18/09 to 21/09 S.RousseeC.BortolinconfirmedStop coolingWaiting approval Additional jobs: Study for replace the tanks of TRD & TPC Feec, and check the possibility to use the mixed water on SSD/SDD S.Roussee

Watcher schedule MonTueWedThuFri 8:00 – 12:00 13:00 – 17:00 14/9/12TS preparatory meeting - A.Tauro8

DCS Main activities / perturbations: Monday PM – Database maintenance (transparent) Tuesday – 09h00: network intervention by IT on router serving devices in cavern, side C 30 min ‘blackout’ in worst case, users have been warned with details of intervention by mail – Standard maintenance of DCS cluster, might need reboot of cluster – Maintenance central systems (backups etc.) - several short interruptions, might have impact on central running – Shut down machines in old cluster that are not required for operation Change/repair a few PCs; some tuning of PVSS projects - will be coordinated directly with the experts concerned. Detectors will receive instructions for cleanup and backup of their projects Propose, as usual, full functional test with all detectors on Friday (supersafe- safe-ready-safe-supersafe cycle). 14/9/12TS preparatory meeting - A.Tauro9 Andre

TC & P2tech LS1 preparation: – SAA3 – DCal cabling (EN-MEF) – New visitor’s platform – Beampipe removal (TE-VSC) – HMPID removal TOF and TRD services BBF Conflict YP with TPC services ? Trappe ADC Plancher Bois cote I C et O C a remplacer par caillebottis ? Plancher bois cote O A a remplacer par caillebottis ? Demontage chevron sur poutre muons ? Demontage bois dessous MCTS cote I et O ? Demontage bois sur tubes cooling cote I A ? Demontage ancien systeme detection incendie Beam pipe protection ? Installation cartouche resine CV dans le SD ? Grillage zonne C Rack muon tacker a nettoyer 14/9/12TS preparatory meeting - A.Tauro10

Visits Tbc: Mr. Veltman, (Nobel prize, member of SPC) – Tue Insurance company: Thu-Fri 14/9/12TS preparatory meeting - A.Tauro11

AOB A new ALICE Confined Space training session will take place next Tuesday (18th September 2012) – Pls contact Fernando 14/9/12TS preparatory meeting - A.Tauro12