News and Related Issues Ted & Kirsten May 27, 2005 TDWG News since last meeting (April 29th) Organization Issues: how to improve communication Future Plans:

Slides:



Advertisements
Similar presentations
 Project Overview & System Integration Ted Liu June 11th, 2004 Fermilab, High Rise, Hornet Nest Pulsar Meeting.
Advertisements

Clara Gaspar on behalf of the LHCb Collaboration, “Physics at the LHC and Beyond”, Quy Nhon, Vietnam, August 2014 Challenges and lessons learnt LHCb Operations.
Final Commissioning Plan and Schedule Cheng-Ju Lin Fermilab Installation Readiness Review 09/27/2004 Outline: - Work to be done during shutdown - Work.
Resources for the ATLAS Offline Computing Basis for the Estimates ATLAS Distributed Computing Model Cost Estimates Present Status Sharing of Resources.
Future Dataflow Bottlenecks Christopher O’Grady with A. Perazzo and M. Weaver Babar Dataflow Group.
CDF CDF Operations Steve Hahn February 7, 2005 All Experimenters ’ Meeting.
LHCb Upgrade Overview ALICE, ATLAS, CMS & LHCb joint workshop on DAQ Château de Bossey 13 March 2013 Beat Jost / Cern.
Introduction Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
DCZ status & results B A B AR Trigger Workshop, December 2004 Jamie Boyd University of Bristol for the Trigger Upgrade Group.
Initial Step to go beyond 200E30 Ted TDWG, Sept 1st 2006.
Trigger Table Improvements -- past, present and future prospects Kirsten & Ted, Feb.02, 2006, CDF meeting Happy Chinese/Korea New Year! Year of dog… When.
Status of  b Scan Jianchun Wang Syracuse University Representing L b scanners CLEO Meeting 05/11/02.
CDF Trigger System Veronica Sorin Michigan State University Silicon Workshop UCSB May 11,2006.
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
Table Improvements & Near Term Plan Ted & Kirsten July 08, 2005 TDWG Introduction Table performance due to improved L2 JETs Initial Trigger Table Cleanup:
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
Joint Commissioning (2) Commissioning plan Gene Flanagan Purdue University.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
On the same page with Streaming Adam Lyon Analysis Tools - 6/04/2002.
Claudia-Elisabeth Wulz Institute for High Energy Physics Vienna Level-1 Trigger Menu Working Group CERN, 9 November 2000 Global Trigger Overview.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
Level 3 Muon Software Paul Balm Muon Vertical Review May 22, 2000.
Plans for Trigger Software Validation During Running Trigger Data Quality Assurance Workshop May 6, 2008 Ricardo Gonçalo, David Strom.
IT253: Computer Organization
27 July 2006Trigger Upgrades Review1 Status & Plans of the TDWG Mission Statement What Do We have to Guide Us ? Caveats & Concerns Current & Anticipated.
News Ted & Kirsten June 10, 2005 TDWG. Meet Trigger Reps today? Exotic Trigger Reps: Vadim and Oscar doing great work QCD Trigger Rep: Mary herself EWK.
ATLAS in LHCC report from ATLAS –ATLAS Distributed Computing has been working at large scale Thanks to great efforts from shifters.
OFFLINE TRIGGER MONITORING TDAQ Training 5 th November 2010 Ricardo Gonçalo On behalf of the Trigger Offline Monitoring Experts team.
EGEE is a project funded by the European Union under contract IST HEP Use Cases for Grid Computing J. A. Templon Undecided (NIKHEF) Grid Tutorial,
17-Aug-00 L.RistoriCDF Trigger Workshop1 SVT: current hardware status CRNowFinal Hit Finders64242 Mergers31616 Sequencers2312 AMboards4624 Hit Buffers21212.
Jennifer Thompson Western Michigan University Fermi National Accelerator Lab PST Program July 29, 2008 Mentors: Steve Hahn and JJ Schmidt.
L2 Upgrade review 19th June 2007Alison Lister, UC Davis1 XFT Monitoring + Error Rates Alison Lister Robin Erbacher, Rob Forrest, Andrew Ivanov, Aron Soha.
Simple ideas on how to integrate L2CAL and L2XFT ---> food for thoughts Ted May 25th, 2007.
Level 3 Trigger Leveling D. Cutts(Brown), A. Garcia-Bellido(UW), A. Haas(Columbia), G. Watts(UW)
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Online System Status LHCb Week Beat Jost / Cern 9 June 2015.
L2 Status and Plan Matt Worcester, Heather Ray, Monica Tecchio, Myron Campbell, Jane Nachtman, David Saltzberg, Tom Wright, Steve Kuhlmann, Karen Byrum,
Nov 1, 2002D0 DB Taking Stock1 Trigger Database Status and Plans Elizabeth Gallas – FNAL CD (with recent help from Jeremy Simmons, John Weigand, and Adam.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
Pulsar Status For Peter. L2 decision crate L1L1 TRACKTRACK SVTSVT CLUSTERCLUSTER PHOTONPHOTON MUONMUON Magic Bus α CPU Technical requirement: need a FAST.
Hardware: Software:
Upgrade Software University and INFN Catania Upgrade Software Alessia Tricomi University and INFN Catania CMS Trigger Workshop CERN, 23 July 2009.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment is one of the four major experiments operating at the Large Hadron Collider.
MUON DAQ WORKSHOP Muon Week, CERN February 2014 Nicoletta Garelli (SLAC)
Jan 7, 2002E. Gallas/Trigger Db1 Trigger Database and Trigger Configurations and Trigger Issues Elizabeth Gallas, Jeremy Simmons (Fermilab - Computing.
Bob Hirosky L2  eta Review 26-APR-01 L2  eta Introduction L2  etas – a stable source of processing power for DØ Level2 Goals: Commercial (replaceable)
Performance Requirements J. Lewis Level 2 Loya Jurga 7 December 2001.
L2toTS Status and Phase-1 Plan and Pulsar S-LINK Data Format Cheng-Ju Lin Fermilab L2 Trigger Upgrade Meeting 03/12/2004.
LAV thresholds requirements Paolo Valente. LAV answers for Valeri’s questions (old) 1.List of hardware to control (HV, LV, crates, temperatures, pressure,
HI July Exercise and Muon DQM preparation Mihee Jo Mihee Jo / Lab meeting.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
LHCb 2009-Q4 report Q4 report LHCb 2009-Q4 report, PhC2 Activities in 2009-Q4 m Core Software o Stable versions of Gaudi and LCG-AA m Applications.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
ATLAS B trigger Overview of B trigger Di-muon algorithms Performance (efficiency/rates) Menu for data taking experience 7/1/20101ATLAS UK Meeting,
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
The ZEUS Event Store An object-oriented tag database for physics analysis Adrian Fox-Murphy, DESY CHEP2000, Padova.
Pulsar WG Meeting (C-J Lin)
Status of Full Simulation for Muon Trigger at SLHC
Overview of CLAS12 Calibration
ATLAS: Level-1 Calorimeter Trigger
L2 CPUs and DAQ Interface: Progress and Timeline
DIRC Background Status
XFT2B: Plans and Tasks XFT Workshop FNAL 19 December 2003; p.1.
Presentation transcript:

News and Related Issues Ted & Kirsten May 27, 2005 TDWG News since last meeting (April 29th) Organization Issues: how to improve communication Future Plans: near term and long term

Many news since April 29th Operation related Trigger performance related Detector and machine related Trigger software related Trigger Table changes and tests

News: Operation Related Fixes to problems related to prescale changes  Rate Limited trigger problem: protection in L2 decision node code (by Daniel W)  ScalerMon DPS algorithm prescaling to 1 prematurely: protection against this and more diagnostic info (by Bill B)  No prescale change in some high lumi runs, caused by unused L2 trigger bits not properly initialized (confuses ScalerMon): protection in Pulsar crate CPU code (by Konstantin A) L2ctrl node stuck when start a new run, requires reset  due to memory leak in L2ctrl code, fixed (by Daniel W) So far, haven’t seen any problem after all the fixes above …

News: Trigger Performance related SVT Fast Abort problem fixed in firmware (by Anna Maria)  SVT fast abort re-enabled on May18  At high luminosity (~120E30), with high-lumi table, the online average L2 latency is about 40 us at the beginning of the run (Pulsar L2 without fast abort)  With fast abort enabled, L2 latency is 37 us (~3 us saving)  With Alpha driving, SVT fast abort doesn’t help. The online average L2 latency is about 48 us at the beginning of the run  Overall, we have about 10 us L2 performance gain at high luminosity. The higher the luminosity, the more performance gain (Pulsar over Alpha)  Allows us to increase L1A rate when new EVB opens up downstream EVB Upgrade Review on May 19th: operational in July is possible  at luminosity around E30, L2 rate saturates at ~395 Hz  deadtime is about 10%, mostly due to waitBusy (~1% due to L2) Let’s see how new EVB will perform…and where is the next brick wall

News: Detector and Machine related Central hadron and plug online LER calibrations update on May 20  CHA, WHA, PEM and PHA, effective for runs > Some CAL related trigger rates have gone up a lot  L1_SUMET90 from 850Hz to 1.7KHz at 50E30;  L1_MET15 from 500Hz to 1KHz at 50E30;  L1_JET10 from 1Khz to 1.3 Khz For details, see main shift e-log entries in the past few days For a summary, see my e-log entry on May 25th, eve shift Machine performance: new record at 136E30 on May 12 deadtime was 10-20% at very beginning of the run all due to Busy, then had EVB problem. L2A saturated at 400Hz. Short run

News: Trigger Software Daniel W (with help from Tom W) have ported all of the post-freeze changes to the Pulsar  Daniel has checked every bit in every event he could find from the Alpha test run (physics_test_3_02, v7 run), made sure every bit matches between Alpha and Pulsar  He also uncovered a bug in the BMU bit map, fixed it before it is used in real table Tom took care of the ElectronTau (by Peter W) in database, new version of TriggerDB. For details, see trigger table testing e-log (previous page) Alpha crate has been converted into a Pulsar crate, for software development of Pulsar Phase II with CERN FILAR PCI cards.  For better performance, and prepare for Stereo XFT upgrade

News: Trigger Tables/tests JET_CALIB_TEST[4,645,656] test runs taken  Run and taken on May 9th, processed on May 11th  Data to calibrate the Calorimeter, details see Trigger Table Testing e-log  See talk at the end of this meeting PHYSICS_HIGHLUM_3_03[3,655,570]ready  Prescales to J/Psi to mumu, higher XFT threshold on inclusive muon triggers  Aim to keep us alive at luminosity above 135E30  Yet to see the performance with the recent CAL LERs update  Details is now in Trigger Table e-log PHYSICS_TEST_3_02[9,656,571] run taken finally  Run finally taken this morning, request for offline process  Mostly check the L2 code which was ported to Pulsar  With a few fixes such as Z to bbbar  Details see Trigger Table Testing e-log Most of the work done by Kirsten and Veronica

Organization Issues Had a meeting with spokes and physics group conveners last Friday  To discuss participation of “trigger representatives” from each group TDWG == trigger dataset working GROUP  This has to be a GROUP effort !  Need to encourage young people to get deeply involved  One of the best ways to learn how to be a HEP experimentalist  New ideas could still make a big difference in this mature experiment Without “G”, TDW == Two Do the Work  We have major challenges ahead of us in the coming year  Our system is flexible enough that we know we can handle it  What we need is energetic young people with fresh ideas …

Plans: near and long term Near Term Plan: stay alive  Come up with trigger table good up to 150 E30 while fully efficient at lower luminosity  When Kirsten comes back, will move all the changes to the high lumi into default table  Then focus on getting all the triggers under testing into physics table  June 10th Meeting: meet new Trigger Reps! show your plan and results, sign off high- lumi to default  Should keep high-lumi table a pure subset of default table;  Come up with standardize tool to handle DPS offline (manpower promised by spokes)  Expand L2 bits from 128 to 192 Long Term Plan: Grand Unification of the Trigger Table  Many advantages to this …  Possible mostly due to DPS and lumi enable  Feasibility study on going  Will present plan this summer  Prepare to take full advantage of new EVB & SVT upgrade this year  And find out where is the new brick wall… see the rest of talks